Triuni Residences @ Batu Uban, Penang
Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches
The Sanctuary, Batu Uban · Gelugor, Penang Island · Completed

Triuni Residences @ Batu Uban, Penang

Three finished towers — 552 freehold condominiums on 5.36 hillside acres, 660 m in a straight line from Universiti Sains Malaysia. Tower A was handed over in 2022, Tower B in 2024 and Tower C in 2025, so this is a building you can walk through before you commit. Whether a foreigner may buy depends on the unit: the permit bands run from below Penang Island’s RM1,000,000 floor to well above it.

Freehold552 units · 3 towers840–1,916 sq ftAll three towers completed

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

552homes in three completed towers
5.36acres of freehold hillside
660 mto Universiti Sains Malaysia
Triuni Residences tower drop-off at The Sanctuary, Batu Uban — artist's impression from the developer, Runnymede Group
Tower drop-off · artist’s impression from the developer’s website
Triuni Residences swimming pool with the tower behind — artist's impression from the developer, Batu Uban, Penang
Swimming pool · artist’s impression
Answer block

Triuni Residences @ Batu Uban, Penang at a glance

Every figure below comes from the developer’s own published material or the government register. Where neither has published something, it isn’t on this page.

Development
Triuni ResidencesBy Runnymede Group · licence held by B.U. Developments Sdn Bhd
Where it is
The Sanctuary, Batu UbanGelugor, Penang Island · Daerah Timur Laut on the register
Tenure
Freehold‘Pegangan Bebas’ on the filed advertisements, which also record a charge to Maybank Islamic Berhad
Buildings
3 towers · 21 to 23 storeysOn 5.36 acres with a 2.95-acre landscaped podium, according to The Star
Units
552Tower A 176 · Tower B 192 · Tower C 184
Layouts
840 to 1,916 sq ftThree to 4+1 bedrooms · duplex penthouses of 2,594 to 3,897 sq ft reported by The Star
Facilities
40 m infinity lap poolLeisure and wading pools, jacuzzi, gyms, function rooms, playground, observatory deck
Completion
CompletedCertificates dated 22 Apr 2022 (A), 1 Apr 2024 (B) and 2 Apr 2025 (C)
Government permit
7025-7/12-2025/0890(R)-(S)Tower C’s permit, the most recent · expired 28 Dec 2025, no newer one listed
Foreign buyers
Depends on the unitEach tower’s permit band starts below RM1,000,000 and ends above it — eligibility follows the agreement price
Why this address

What a careful buyer should know about Triuni Residences

Four strengths and two points to check. Nothing here comes from a sales pitch: the sources are Runnymede’s own websites, the advertisements it filed with the housing register, the register itself and The Star.

🏁

It is finished — all three towers

The register dates the certificates of completion and compliance at 22 April 2022 for Tower A, 1 April 2024 for Tower B and 2 April 2025 for Tower C. There is no construction risk left to price in: you can stand in the lobby, ride the lift and look out of the actual window before signing anything.

🌴

A 2.95-acre garden deck on a 5.36-acre site

The Star reports that more than half the land is given to a landscaped podium, and the developer names Plan E, an Australian landscape studio, as its designer. The centrepiece is a 40-metre cascading infinity lap pool, with a leisure pool, wading pools, jacuzzi and cabanas around it.

🚪

Eight to ten homes a floor, with voids between them

The register’s unit lists show eight homes a floor in Towers A and C and mostly ten in Tower B. The developer describes its detached and semi-detached unit design as a way to bring more daylight and sea breeze into each home, and each tower has its own private lobby.

🎓

660 m from USM, inside a gated hillside estate

Triuni is the condominium phase of The Sanctuary, a 27.8-acre gated estate that also holds the Sanctuary Bungalows and Vilaris Courtyard Homes. Universiti Sains Malaysia is 660 m away in a straight line and the Sungai Nibong express bus terminal 861 m, which is the practical draw for university staff and long-stay tenants.

📅

Two of the three towers needed more time

The register records approved extensions of 27 months for Tower A (63 months in all) and 18 months for Tower B (54 months). Both were handed over inside the extended periods. It is history now, but if you are buying one of the remaining developer units, ask for the defect-liability dates that apply to that tower.

🧾

The last advertising permit on record has lapsed

Tower C’s permit ran to 28 December 2025 and the register shows no newer one, while 38 units — 13 in Tower B and 25 in Tower C — were still recorded as not yet sold on 5 October 2026. That is something to confirm before you buy from the developer. The filed advertisements also note a charge on the land to Maybank Islamic Berhad, which your solicitor will clear at completion.

Project DNA

The whole development, decoded

Every number here is the developer’s own or the government register’s.

552Units
3Towers
5.36Acres
8–10Homes a floor

Pick your tower

Resale only — fully sold on the register

Tower A

The first tower, reported by The Star at its 2017 launch under the name Anthemis: 22 storeys with eight homes a floor. The paper gave standard sizes of 1,130 to 1,916 sq ft and duplex penthouses of 2,594 to 3,897 sq ft. Its certificate of completion and compliance is dated 22 April 2022, and all 176 units are recorded as sold — so any home here now comes from an existing owner.

176Units
22Storeys
8Homes on a typical floor
1,130 – 1,916 sq ft (The Star)Duplex penthouses on topOwner resale
💬 Ask about Tower A
The tower with the smaller layouts

Tower B

Tower B is where the compact homes are: the advertisement filed for it lists the three-bedroom, two-bathroom Type F/F1 of 840 sq ft, the 3+1-bedroom, two-bathroom Type G1 of 1,076 sq ft and two four-bedroom, three-bathroom layouts — Type G2 of 1,216 sq ft and Type H/H1 of 1,302 sq ft. The register counts 21 storeys and mostly ten homes a floor. Certificate of completion dated 1 April 2024; 179 units recorded as sold and 13 as not yet sold when I read it.

192Units
21Storeys
10Homes on a typical floor
Type F/F1 · 3 bed · 840 sq ftType G1 · 3+1 bed · 1,076 sq ftType G2 · 4 bed · 1,216 sq ftType H/H1 · 4 bed · 1,302 sq ft
💬 Ask about Tower B
The newest tower, with the most stock left

Tower C

The last tower to finish, with its certificate of completion and vacant possession both dated 2 April 2025. The filed advertisement lists Types A/A1 (3+1 bedrooms, 1,130 sq ft), B/B1 (3+1 bedrooms, 1,302 sq ft), C (4+1 bedrooms, 1,636 sq ft) and the dual-key Type D (4+1 bedrooms, 1,916 sq ft). 23 storeys, eight homes a floor; 159 units sold and 25 not yet sold on the register.

184Units
23Storeys
8Homes a floor
Type A / A1 · 1,130 sq ftType B / B1 · 1,302 sq ftType C · 1,636 sq ftType D dual-key · 1,916 sq ft
💬 Ask about Tower C

Facilities, level by level

Compiled from the developer’s Triuni website, the advertisement filed for Tower C and The Star’s 2017 reports. The podium landscape and facilities plan from Tower C’s filed advertisement is shown in the gallery below; no plan has been published for the other levels, so treat the grouping as a guide.

Pools

Podium garden deck
  • 40 m cascading infinity lap pool
  • Leisure pool
  • Wading pools with water spouts
  • Jacuzzi
  • Cabanas

Fitness and family

Podium garden deck
  • Indoor gyms
  • Outdoor jungle gym
  • Tree cubbies
  • Children’s playground
  • Reflexology garden paths
  • Spa

Gathering and outlook

Level not published
  • Function rooms
  • Meeting rooms
  • Observatory deck
  • Rooftop garden
  • Herb garden
  • Landscaped gardens

Arrival and security

Ground level
  • Gated and guarded entrance
  • Guardhouse
  • Porte cochère
  • Private lobby for each tower
  • Card access to lift lobbies
  • 24-hour CCTV

Where the project is now

3 Apr 2017First sale and purchase agreement for Tower A on the register; The Star reports the launch that month
24 Dec 2019First agreement for Tower B
31 Dec 2021First agreement for Tower C
22 Apr 2022Tower A: certificate of completion and compliance · vacant possession 31 May 2022
1 Apr 2024Tower B: certificate of completion and compliance · vacant possession 13 May 2024
2 Apr 2025Tower C: certificate of completion and vacant possession on the same day
Oct 2026All three towers completed · 38 units still recorded as not yet sold (13 in Tower B, 25 in Tower C)
Layouts

All 9 Triuni Residences @ Batu Uban, Penang floor plans

Nine layouts across the three towers. Tower B holds the smaller homes from 840 sq ft; Towers A and C share the larger A-to-D series from 1,130 to 1,916 sq ft. Sizes are taken from the advertisements filed with the register and from The Star. Eight of the nine are shown here as drawings from those filed advertisements. The duplex penthouse is the one without a drawing, because neither advertisement includes it; ask me for the plan of the unit you are considering.

Triuni Residences Tower B Type F / F1 floor plan, three bedrooms and two bathrooms, 840 sq ft, Batu Uban, Penang

Tower B · 3-bedroom — 840 sq ft

About 78 sqm · Type F / F1 · three bedrooms, two bathrooms · Levels 1 to 19 · the smallest layout in the development · drawing from Tower B’s filed advertisement

🛏 3 Bed🛁 2 BathTower BOfficial drawing
Get this floor plan
Triuni Residences Tower B Type G1 floor plan, three bedrooms plus a study room and two bathrooms, 1,076 sq ft, Batu Uban, Penang

Tower B · 3+1-bedroom — 1,076 sq ft

About 100 sqm · Type G1 · three bedrooms plus a study room, two bathrooms · Levels 1 to 19 · drawing from Tower B’s filed advertisement

🛏 3 Bed🛁 2 BathTower B+1 room
Get this floor plan
Triuni Residences Tower B Type G2 floor plan, four bedrooms and three bathrooms, 1,216 sq ft, Batu Uban, Penang

Tower B · 4-bedroom (1,216) — 1,216 sq ft

About 113 sqm · Type G2 · four bedrooms, three bathrooms · Levels 1 to 19 · the smaller of Tower B’s two four-bedroom layouts · drawing from Tower B’s filed advertisement

🛏 4 Bed🛁 3 BathTower BOfficial drawing
Get this floor plan
Triuni Residences Tower B Type H / H1 floor plan, four bedrooms and three bathrooms, 1,302 sq ft, Batu Uban, Penang

Tower B · 4-bedroom (1,302) — 1,302 sq ft

About 121 sqm · Type H / H1 · four bedrooms, three bathrooms · Levels 1 to 19 · the larger four-bedroom layout · drawing from Tower B’s filed advertisement

🛏 4 Bed🛁 3 BathTower BOfficial drawing
Get this floor plan
Triuni Residences Tower C Type A / A1 floor plan, 3+1 bedrooms and two bathrooms, 1,130 sq ft, Batu Uban, Penang

Type A / A1 — 1,130 sq ft

About 105 sqm · 3+1 bedrooms, two bathrooms · drawing from Tower C’s filed advertisement; The Star gave the same size for Tower A

🛏 3 Bed🛁 2 BathTowers A & C+1 room
Get this floor plan
Triuni Residences Tower C Type B floor plan, 3+1 bedrooms and three bathrooms, 1,302 sq ft, Batu Uban, Penang

Type B / B1 — 1,302 sq ft

About 121 sqm · 3+1 bedrooms, three bathrooms · the drawing is Type B from Tower C’s filed advertisement; Type B1 is drawn there as its mirror image

🛏 3 Bed🛁 3 BathTowers A & C+1 room
Get this floor plan
Triuni Residences Tower C Type C floor plan, 4+1 bedrooms and four bathrooms, 1,636 sq ft, Batu Uban, Penang

Type C — 1,636 sq ft

About 152 sqm · 4+1 bedrooms, four bathrooms · drawing from Tower C’s filed advertisement

🛏 4 Bed🛁 4 BathTowers A & C+1 room
Get this floor plan
Triuni Residences Tower C Type D dual-key floor plan, 4+1 bedrooms and five bathrooms, 1,916 sq ft, Batu Uban, Penang

Type D (dual-key) — 1,916 sq ft

About 178 sqm · 4+1 bedrooms, five bathrooms, two entrances · drawing from Tower C’s filed advertisement

🛏 4 Bed🛁 5 BathTowers A & CDual-key
Get this floor plan

Duplex penthouse

2,594 to 3,897 sq ft with a roof terrace, as reported by The Star in 2017 · not itemised on the filed advertisements · ask me which are available

Top floorsReported by The Star
Get this floor plan
Location & connectivity

Where Triuni Residences @ Batu Uban, Penang sits

On the hillside at The Sanctuary in Batu Uban, Gelugor — reached from Jalan Sultan Azlan Shah, 660 m in a straight line from Universiti Sains Malaysia and 438 m from Vilaris Courtyard Homes in the same estate.

Open in Google Maps →
📍 5.349944, 100.30436111700 Gelugor

All three phases share one set of coordinates on the national housing register, and the map is pinned there. The developer’s own website gives a point about 210 m to the south; either way the distances above change by a couple of hundred metres at most.

The honest picture of getting in and out. The estate is reached from Jalan Sultan Azlan Shah, which also feeds USM, Sungai Dua and the bus terminal — it is slow at the start and end of the working day and when the university term is on. The hillside setting gives the views and the breeze, and it also means almost every errand begins with a drive downhill. Time the run to your office once before you decide.
  • Vilaris Courtyard Homes (same estate)438 mstraight-line
  • Universiti Sains Malaysia (USM)660 mstraight-line
  • Sungai Nibong express bus terminal861 mstraight-line
  • Lotus’s Sungai Dua933 mstraight-line
  • SMJK Phor Tay1.2 kmstraight-line
  • SJK(C) Kwang Hwa1.8 kmstraight-line
  • Queensbay Mall1.9 kmstraight-line
  • Pantai Hospital Penang4.0 kmstraight-line
  • Penang Bridge4.7 kmstraight-line
The government record

Three register entries — 7025-5, 7025-6 and 7025-7 — all marked completed with CCC

The licence belongs to B.U. Developments Sdn Bhd (7025), a member of Runnymede Group whose registered business address is 554 Jalan Sultan Azlan Shah, Gelugor. The register files each Triuni tower as a separate phase and also lists Villa Sanctuari, Vilaris and The Fount under the same licensee.

Project codeRegistered nameAdvertising permitPermit expiresUnitsBed / bathStatus
7025-5Triuni, Phase 1 (Tower A) — flats / condominium, 22 storeys7025-5/07-2022/02069(P)9 Jul 20221763 / 2Completed · CCC 22 Apr 2022
7025-6Triuni Residences, Phase 2 (Tower B) — flats / condominium, 21 storeys7025-6/12-2024/1655(R)-(S)18 Dec 2024192not itemisedCompleted · CCC 1 Apr 2024
7025-7Triuni Residences, Phase 3 (Tower C) — flats / condominium, 23 storeys7025-7/12-2025/0890(R)-(S)28 Dec 20251843–5 / 2–5Completed · CCC 2 Apr 2025
Total552Licensed developer: B.U. Developments Sdn Bhd (7025)

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Looked up on teduh.kpkt.gov.my on 5 October 2026. To verify, open teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=7025-7 and repeat with 7025-6 and 7025-5.

176 + 192 + 184 = 552 units

Phase 1 (filed simply as ‘Triuni’) is 176 units in a 22-storey building; Phase 2 is 192 units over 21 storeys; Phase 3 is 184 units over 23 storeys. The unit lists agree with those totals. On 5 October 2026 every Tower A unit was recorded as sold, Tower B showed 179 sold and 13 not yet sold, and Tower C 159 sold and 25 not yet sold — 514 of 552 in all.

Permit bands, and why foreign eligibility is not a yes-or-no answer

The permits record RM636,000 to RM1,644,000 for Tower A, RM629,100 to RM3,746,904 for Tower B and RM687,600 to RM3,993,000 for Tower C. Those are the bands on the advertising permits, not the price of any unit. Each one begins under Penang Island’s RM1,000,000 strata floor for non-citizens and ends above it, so a foreign buyer qualifies only on units whose agreement price reaches the floor — and that applies to a resale from an owner just as it does to a developer unit.

Schedule H, with extensions on the first two towers

All three phases were sold under Schedule H with a 36-month delivery period. The register shows 27 additional months approved for Tower A, moving its deadline from 3 April 2020 to 3 July 2022, and 18 months for Tower B, from 24 December 2022 to 24 June 2024. Tower C has no extension on record; its 36 months, counted from the first agreement, ended on 31 December 2024 and vacant possession is dated 2 April 2025. Each buyer’s own period runs from that buyer’s agreement.

Completed, but the permits have expired

Status on all three entries is ‘Siap Dengan CCC’ — completed with certificate, 100% built. The advertising permits have ended: 9 July 2022 for Tower A, 18 December 2024 for Tower B and 28 December 2025 for Tower C, with no newer permit listed. If you are buying one of the units still held by the developer, ask to see the current permit; I will check it for you as well.

Track record

About Runnymede Group

Runnymede Group says it was founded on Penang Island in 1994 and describes its output as deliberately small: properties ‘limited only in numbers produced’. Its website shows work in Penang, Kuala Lumpur and the Perth region of Western Australia, including Rossmoyne Residences and a resort at Margaret River.

The Sanctuary is its long-running Batu Uban estate. The Star describes 27.8 acres of elevated freehold land developed in three stages: the Sanctuary Bungalows (69 homes on 12 acres, completed in 2010), Vilaris Courtyard Homes (56 three-storey homes on 5.3 acres, completed in 2016) and finally Triuni Residences, the only high-rise component.

For Triuni the developer worked with Plan E, an Australian landscape architecture studio, on what it calls a Bali concept, and built the towers one at a time over about eight years rather than all at once. The sales gallery and the licensee’s office sit at 554 Jalan Sultan Azlan Shah.

The caveat worth stating: this is a niche developer with a short project list, and the register shows that Towers A and B each needed an approved extension before handover. The buildings are complete, so the practical questions today are about management, maintenance and the condition of the specific unit — inspect it, and ask the management office for the latest accounts.

Straight answers

Frequently asked questions

How many units and towers are there at Triuni Residences?

552 condominiums in three towers: 176 in Tower A, 192 in Tower B and 184 in Tower C. Those are the totals on the government register for phases 7025-5, 7025-6 and 7025-7.

The towers are 22, 21 and 23 storeys on the register, with eight homes a floor in A and C and mostly ten in B.

Is Triuni Residences freehold or leasehold?

Freehold. The advertisements filed with the housing register for Towers B and C both state ‘Pegangan Bebas’, and The Star describes the whole Sanctuary estate as freehold land.

Those advertisements also record a charge on the land to Maybank Islamic Berhad. That is ordinary development financing; in a purchase your solicitor confirms the title and handles the discharge.

What unit sizes does Triuni Residences have?

Tower B: three bedrooms and two bathrooms at 840 sq ft (Type F/F1), 3+1 bedrooms and two bathrooms at 1,076 sq ft (Type G1), and four bedrooms with three bathrooms at 1,216 sq ft (Type G2) and 1,302 sq ft (Type H/H1). Tower C: Types A/A1 at 1,130 sq ft, B/B1 at 1,302 sq ft, Type C at 1,636 sq ft and the dual-key Type D at 1,916 sq ft.

For Tower A, The Star reported the same 1,130 to 1,916 sq ft range at launch, along with duplex penthouses of 2,594 to 3,897 sq ft on the top floors. Strata titles state the exact area of each parcel, so check the figure for the unit itself.

Can a foreigner buy a unit at Triuni Residences?

Yes for some units, no for others. On Penang Island a non-citizen must buy strata property at RM1,000,000 or above, and the permit bands for all three towers start below that. The larger layouts are the ones that reach it.

State consent is needed, with a 3% levy on approval — reduced to 1.5% for island strata priced from RM1,000,000 to RM1,500,000 — and a three-year bar on resale. Non-citizens pay a flat 8% stamp duty on residential transfers. Bumiputera-quota units cannot be sold to foreigners.

Is Triuni Residences ready to move in?

Yes. All three towers are complete with certificates of completion and compliance: 22 April 2022, 1 April 2024 and 2 April 2025. Vacant possession dates on the register are 31 May 2022, 13 May 2024 and 2 April 2025.

The developer’s website describes the project as ready to move in. A unit bought from an owner can be occupied as soon as the transfer completes; for a developer unit, ask how long handover takes after signing.

Which tower suits me — A, B or C?

Start with size. Under about 1,100 sq ft, only Tower B has it. From 1,130 sq ft up, look at Towers A and C, which share the A-to-D layouts and have eight homes a floor instead of ten.

Then decide between new and lived-in. Tower C is the newest and had 25 units not yet sold on the register; Tower B had 13. Tower A is fully sold, so there you are choosing among owners’ resale units — often renovated, sometimes tenanted.

What does a unit at Triuni Residences cost, and what are the fees?

I quote one thing publicly: the permit bands on the register — RM636,000 to RM1,644,000 for Tower A, RM629,100 to RM3,746,904 for Tower B and RM687,600 to RM3,993,000 for Tower C. Each is the band on the advertising permit, not the price of any unit, and resale prices are set by owners.

Maintenance charges and the sinking fund are set by the management body and are not published by the developer. Tell me the tower and size you want and I will send current asking prices and the charges in writing.

Triuni Residences or Starhill Luxury Residences — how do they differ?

Both are completed hillside condominiums in Gelugor, 2.1 km apart in a straight line. Starhill is a single 35-storey block of 506 condominiums at Bukit Gambier, completed in 2018, with a small number of landed homes beside it. Triuni spreads 552 homes across three towers of 21 to 23 storeys inside a gated estate.

Triuni is the newer building — its towers were certified between 2022 and 2025 — and sits on the USM side of Gelugor. Starhill has a longer resale record. See both on the same afternoon; the drive between them takes you past most of what you would use day to day.

What is daily life like at The Sanctuary, and is there rental demand?

Groceries are 933 m away at Lotus’s Sungai Dua, Queensbay Mall is 1.9 km, the Sungai Nibong express bus terminal 861 m and Pantai Hospital Penang 4.0 km, all in a straight line. For schools, SMJK Phor Tay is 1.2 km and SJK(C) Kwang Hwa 1.8 km.

The obvious tenant pools are USM staff and postgraduates, 660 m away, and professionals working along the expressway toward the Bayan Lepas industrial zone. I do not quote rents. The three-plus-one and four-bedroom sizes suit families and sharers more than single tenants, so think about who would rent your particular layout.

Ask which units are available now

Completed projects change hands unit by unit, and whatever the developer still holds moves too. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit.

Completed project — what is for sale changes unit by unit, so ask before you plan a viewing

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文

I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-05 · Last verified 2026-10-07 against Runnymede Group’s websites (runnymede.com.my and triuni.com.my), the advertisements filed with the housing register for Towers B and C, the KPKT housing register, and The Star’s 2017 reports. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Triuni Residences @ Batu Uban, PenangFreehold · completed · Batu Uban
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

7025-7 · TRIUNI RESIDENCES

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Pangsa/Kondo – 184 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
23 storeys
Siap Dengan CCC
3, 4, 5 / 2, 3, 4, 50 – 109 m²184RM687,600.00
– RM3,993,000.00
100.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 7025-7. Re-read weekly.

7025-5 · TRIUNI

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Pangsa/Kondo – 176 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
22 storeys
Siap Dengan CCC
3 / 2108 m²
≈ 1,163 sq ft
176RM636,000.00
– RM1,644,000.00
100.00%

Swipe the table sideways for the rest of the columns.

Read from teduh.kpkt.gov.my on 2026-10-08, project code 7025-5. Re-read weekly.

7025-6 · TRIUNI RESIDENCES

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Pangsa/Kondo – 192 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
21 storeys
Siap Dengan CCC
—0 – 108 m²192RM629,100.00
– RM3,746,904.00
100.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 7025-6. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.