R&F Princess Cove Phase 3
Freehold waterfront, 650 metres of covered bridge to the Johor–Singapore CIQ — and 1,056 metres from Singapore itself.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation



R&F Princess Cove Phase 3 at a glance
Every figure below comes from the developer’s own published material. Where the developer hasn’t published something, it isn’t on this page.
- Development
- R&F Princess Cove Phase 3New Casa Suites · R&F Development Sdn Bhd
- Tenure
- FreeholdStrata title
- To the CIQ
- 650 metresCovered link bridge, sheltered end to end
- Units in Phase 3
- 4,38512 blocks in five groups
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Six things that make Phase 3 different from Phases 1 and 2
Phase 3 is not simply more of the same site. It carries the widest layout range R&F has released here, it plugs directly into the mall, and it is the phase that will open into a working RTS Link rather than a promised one.
A covered bridge, not a 650-metre walk in the sun
R&F built a sheltered link bridge to the CIQ. Anyone who has done the Causeway crossing on foot in a Johor afternoon understands why that matters more than the raw distance figure.
The mall is part of the building, not nearby
A link bridge runs from Phase 3 straight into R&F Mall — roughly 532,000 sq ft of retail. Groceries, food court and cinema without stepping outside.
Freehold on the waterfront
Freehold title this close to the crossing is scarce. Most stock at this distance from the Causeway is leasehold.
Ten years of delivered buildings you can walk through
Phases 1 and 2 are built and occupied. You can inspect finishes, lift waiting times and how the common areas are actually being maintained — before you buy into Phase 3.
Twenty-one layouts, 313 to 1,555 sq ft
From a 313 sq ft one-bedder to a 1,555 sq ft four-bedroom. Very few JB projects cover both the rental-yield end and the own-stay family end on one site.
It completes after the RTS opens, not before
Completion is targeted for 30 November 2029. The RTS Link is expected in passenger service well before that, so Phase 3 buyers are not betting on the railway — they are buying after it is proven.
The whole development, decoded
Every number here is the developer’s own.
Pick your tower

C1
The single standalone block, and the first in Phase 3 to top out — 6 June 2026. It carries the smallest stock: the 313 sq ft Type A and the B-series one-bedders, plus the 781 sq ft Type C.

C2-1 · C2-2 · C2-3
Three blocks running the two- and three-bedroom range. The end blocks C2-1 and C2-3 carry the wider corner layouts — Types C2, C3 and the 1,275 sq ft D2 — while all three offer the C1 and D3 plans.

C3-1 · C3-2
Two cruciform blocks holding everything above 840 sq ft, including the only four-bedroom plan in Phase 3 — the 1,555 sq ft Type E. If you are buying to live in rather than to let, this is the group to look at.

C3A-1 · C3A-2 · C3A-3
Three blocks built around the two highest-volume plans in Phase 3 — the 820 sq ft two-bedroom and the 1,161 sq ft three-bedroom. Repetition on this scale usually means the most competitive pricing per square foot in the phase.

C5-1 · C5-2 · C5-3
The second three-block group carrying the same C1 and D3 plans as C3A. Between these two groups, six of Phase 3’s twelve blocks run the same two layouts — worth knowing, because it tells you which units will have the most resale comparables later.
Facilities, level by level
Taken directly from the developer’s published facilities plan.
Sky leisure park
- Elevated jogging track
- Landscaped sky garden
- Open lawn
- Seating terraces
Sport
- 50-metre swimming pool
- Tennis courts
- Basketball court
- Indoor badminton court
- Mini golf
Fitness
- Gymnasium
- Strength training zone
- Yoga studio
- Sauna
Indoor and family
- Billiards room
- Children’s playroom
- All-weather covered walkways
- Link bridge to R&F Mall
Where the project is now
All 21 R&F Princess Cove Phase 3 floor plans
Sizes and configurations are the developer’s official figures. Tap any layout and the full-resolution drawing goes to your WhatsApp.

Type A — 313 sq ft
Get this floor plan
Type B1b — 555 sq ft
Get this floor plan
Type B2 — 558 sq ft
Get this floor plan
Type B1 — 577 sq ft
Get this floor plan
Type B3 — 593 sq ft
Get this floor plan
Type B3b — 593 sq ft
Get this floor plan
Type B3c — 593 sq ft
Get this floor plan
Type B3a — 595 sq ft
Get this floor plan
Type C — 781 sq ft
Get this floor plan
Type C1 — 820 sq ft
Get this floor plan
Type C4a — 840 sq ft
Get this floor plan
Type C4 — 852 sq ft
Get this floor plan
Type C4c — 852 sq ft
Get this floor plan
Type C4b — 859 sq ft
Get this floor plan
Type C5 — 876 sq ft
Get this floor plan
Type C2 — 877 sq ft
Get this floor plan
Type C3 — 894 sq ft
Get this floor plan
Type D1 — 1156 sq ft
Get this floor plan
Type D3 — 1161 sq ft
Get this floor plan
Type D2 — 1275 sq ft
Get this floor plan
Type E — 1555 sq ft
Get this floor planInside R&F Princess Cove Phase 3




Where R&F Princess Cove Phase 3 sits
Jalan Tanjung Puteri, 80300 Johor Bahru — waterfront, inside the Johor–Singapore Special Economic Zone, 1,056 metres from Singapore in a straight line.
Pinned to the developer’s site as registered on Google Maps, not to a nearby landmark.
- Johor–Singapore CIQ, Bangunan Sultan Iskandar650 mcovered link bridge
- Singapore1,056 mstraight-line
- R&F Mall · 532,000 sq ftDirect link bridgeno street crossing
- RTS Link · Bukit Chagar stationWithin the CIQ complexreached via the covered bridge
- Permaisuri Zarith Sofiah Opera HouseWithin Princess Coveon the masterplan
- Marina promenade1.8 kmwaterfront frontage
- Senai International Airport~30 kmby car, approximate
The statutory name is Mercu 3, R&F Tanjung Puteri — and “Mercu 3” is Phase 3
“Princess Cove” does not appear in the National Housing Department register. The licence is held by R & F Development Sdn Bhd (13578) — the company this page already names — and the registered name for this phase is MERCU 3, R&F TANJUNG PUTERI.
| Project code | Advertising permit | Permit expires | Units | Bed / bath | Price band on the permit | Built | Status |
|---|---|---|---|---|---|---|---|
| 13578-8 | 13578-8/07-2028/0621(A)-(S) | 30 Jul 2028 | 422 | 1–2 / 1–2 | RM846,905 – RM1,275,259 | 45.00% | Lancar |
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 27 August 2026. Pull it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=13578-8
Two independent fields, and a third that is almost too neat
The licence holder is R & F Development Sdn Bhd, the company this page names, and the register’s coordinate sits 217 metres from the location this site had verified. And “Mercu” is Malay for tower — Mercu 3 is the third tower. The marketing calls it Phase 3; the register calls it Tower 3.
Ask for the code, because R&F holds many of them
Licence 13578 carries a long series of project codes at Tanjung Puteri — this is one of several towers on the same land, and the register numbers them rather than naming them by phase. If you are being sold a unit here, ask for the KPKT project code before you accept any figure, because the towers differ in unit count, price band and build stage.
Foreign buyers: the band straddles the threshold
RM846,905 to RM1,275,259 is the legal boundary the developer may sell within, not an asking price. Johor’s minimum for a non-citizen buying a strata unit is RM1,000,000 — so the cheaper units in this tower are closed to a foreign buyer and the larger ones are not. Confirm the specific unit and price in writing before a booking fee.
45% built
The percentage is the developer’s own progress return under the statutory 7(f) report. Note today’s reading and re-check before every progress payment your bank releases. If it does not move between two payments, that is a written question — and it is answerable from a public government website.
About R&F Development Sdn Bhd

R&F Development Sdn Bhd (company no. 1069248-H) is the Malaysian arm of Guangzhou R&F Properties. Princess Cove is its flagship Malaysian project and has been building on this waterfront site since 2015 — by Phase 3 the developer has a decade of delivery history here that you can go and look at rather than take on trust.
Phase 3 is being built by China Construction Third Engineering Bureau’s Malaysian entity, one of the larger Chinese state-linked contractors operating in Malaysia. Tower C1 topped out on 6 June 2026.
The honest part is further down this page. R&F’s Chinese parent is in financial difficulty, and you should read that section before you commit to anything.

Frequently asked questions
How far is R&F Princess Cove Phase 3 from the Johor–Singapore checkpoint?
650 metres, via a covered link bridge that R&F built — so the walk is sheltered from end to end rather than exposed. Singapore itself is 1,056 metres away in a straight line.
The RTS Link’s Bukit Chagar station sits inside the same CIQ complex, so the same bridge gets you to both the road crossing and the train.
How many blocks and units are in Phase 3?
4,385 units across 12 residential blocks, arranged in five groups: C1 (one block), C2-1/2/3, C3-1/2, C3A-1/2/3 and C5-1/2/3.
This matters when you choose a unit. Six of the twelve blocks — the C3A and C5 groups — run the same two layouts (820 sq ft two-bedroom and 1,161 sq ft three-bedroom), which means those units will have the deepest pool of resale comparables later. The C3 group holds the largest and rarest plans.
What layouts and sizes are available?
Twenty-one layouts, from a 313 sq ft one-bedroom (Type A) to a 1,555 sq ft four-bedroom (Type E). In between: the B-series one-bedders at 555–595 sq ft, two-bedrooms from 781 to 894 sq ft, and three-bedrooms at 1,156, 1,161 and 1,275 sq ft.
You will see plan codes written as A / A(M), C1 / C1(M) and so on. The (M) suffix denotes the mirrored version of the same plan — same area, same room count, layout flipped. It affects which way your windows face, not how much space you get.
When will Phase 3 be completed?
The targeted completion date is 30 November 2029. Block C1 topped out on 6 June 2026, built by China Construction Third Engineering Bureau’s Malaysian entity.
One practical consequence: the RTS Link is expected to be carrying passengers well before 2029. So unlike buyers in earlier phases, Phase 3 buyers get to see the railway working before they take delivery, rather than buying on the promise of it.
Is Princess Cove freehold, and can foreigners buy?
Yes, the land is freehold, with strata title on the individual units.
Foreigners can buy above the state price floor. Johor sets a minimum purchase price of RM1,000,000 for strata property bought by non-citizens, and state consent is required. Budget also for the Johor foreign buyer levy (3% of price or RM30,000, whichever is higher, from 1 July 2025). That minimum has a second, higher tier: RM50,000 where the property is a serviced residence transacted below RM1 million. R&F has not published Phase 3 prices and I have not seen the land-use category confirmed in writing for this phase, so ask for both before you assume RM30,000 is your figure. Above a RM1,000,000 price the 3% exceeds either minimum in any case. Then add the flat 8% stamp duty applying to non-citizens since 1 January 2026.
You may hear that Phases 1 and 2 had a special approval letting foreigners buy below RM1 million. I have not seen any government document supporting that, so I will not repeat it as fact. If it matters to your purchase, get it confirmed in writing by the developer and by a Johor conveyancing lawyer before you pay a deposit.
R&F’s parent company is in financial trouble. Should that worry me?
You should know about it, and I would rather tell you than have you find out later. Guangzhou R&F Properties, the Chinese parent, reported a net loss of RMB 16.43 billion for FY2025, and its auditor issued a disclaimer of opinion citing going-concern uncertainty. The group is working through onshore and offshore debt restructuring.
What that does and does not mean here. The Malaysian entity, R&F Development Sdn Bhd, is a separate company, Phases 1 and 2 are built and occupied, and Phase 3 is under construction with a state-linked Chinese contractor and a topped-out first block. Malaysian buyers are also protected by the HDA statutory framework — progressive payments tied to certified construction stages, plus the defect liability period.
Where the real risk sits is the long tail rather than the build: management-corporation funding, defect rectification once you take keys, and how well the common areas are maintained ten years out if the parent group stays distressed. My advice is practical — go and inspect Phases 1 and 2 yourself, ask current owners what maintenance is actually like, and have your lawyer read the S&P carefully. Then decide.
What is the price and the maintenance fee?
R&F has not published a price list or maintenance rate for Phase 3 on its official project site, and the figures circulating on listing portals contradict each other. I am not going to put a number here that I cannot stand behind.
I get the current price list and the S&P payment schedule direct from the developer. Message me and I will send you what is actually accurate today, for the specific layout and block you are looking at — pricing varies meaningfully between the C3 group and the C3A/C5 groups.
How does Phase 3 compare with Causewayz Square @ JBCC?
They are the two freehold projects closest to the crossing, and they suit different buyers. Causewayz Square is 600 m from the CIQ with a link bridge proposed; Princess Cove Phase 3 is 650 m with the covered bridge already part of the built masterplan, plus a direct link into a 532,000 sq ft mall.
Causewayz runs 366–850 sq ft across nine layouts — tighter, more rental-yield oriented. Phase 3 runs 313–1,555 sq ft across twenty-one layouts, so it covers families as well as investors. Phase 3 also has ten years of built, occupied phases on the same site that you can walk through; Causewayz does not yet.
The trade-off is the one in the previous answer: R&F’s parent is financially distressed, EXSIM’s is not.
What facilities does Phase 3 have?
A 50-metre swimming pool, tennis courts, a basketball court, an indoor badminton court, a gymnasium with a separate strength training zone, a yoga studio, sauna, mini golf, a billiards room and a children’s playroom.
The two that are genuinely uncommon: an elevated jogging track running through a sky leisure park, and all-weather covered walkways connecting the development — the same design thinking as the CIQ link bridge, which in this climate is the difference between facilities you use and facilities you look at.
Get the current price list and unit availability
Developer pricing moves, and the good stacks go first. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit, not a generic brochure.
No agent fee payable by the buyer on new developer launches
Louis Koh
11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文
I work with cross-border buyers from Singapore and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.
Published 2026-08-03 · Last verified 2026-08-03 against R&F Development Sdn Bhd’s published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
13578-8 · MERCU 3, R&F TANJUNG PUTERI
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 25 storeys Lancar | 1, 2 / 1, 2 | — | 422 | RM846,905.00 – RM1,275,259.00 | 45.00% |
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-09-09, project code 13578-8. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.





