Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches
Pandan Perdana, Cheras · Kuala Lumpur · Topped out

Levia Residence @ Cheras

Two 36-storey towers, 778 units on 4.71 acres, and — unusually for a new Kuala Lumpur high-rise — residential title, not a serviced apartment.

Residential title778 units · 2 towers × 36 storeys767–1,364 sq ft · up to 4+1 bedroomsLeasehold 99 years to 2122

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

778Units on 4.71 acres
88%Taken up at topping out
0.7 kmTo future MRT3 Taman Cheras
Levia Residence @ Cheras twin 36-storey towers lit at night, aerial view over Pandan Perdana, Kuala Lumpur
Levia Residence @ Cheras · artist's impression, Matrix Concepts
Roof crown and upper facade of a Levia Residence tower, 36 storeys, Pandan Perdana, Cheras, Kuala Lumpur
Roof crown, Level 36
Level 6 landscape deck between the two Levia Residence towers, Cheras, Kuala Lumpur
Level 6 landscape deck
Answer block

Levia Residence @ Cheras at a glance

Everything below is from the developer's own advertising permit disclosure and project website, checked on 11 August 2026. Where a media report gives a different number, I say so rather than quietly picking one.

Development
Levia Residence, Kuala LumpurMatrix Concepts (Cheras) Sdn Bhd (1230052-H)
Property type
Condominium, residential titleNot a serviced apartment — HDA protection applies
Tenure
Leasehold 99 yearsExpires 30 January 2122
Approving authority
DBKL (Kuala Lumpur)Building plan DBKL.JKB.BP S2 OSC 2022 1411 (20)
Total units
778Tower A 389 · Tower B 389
Site area
4.71 acresTwo towers, 36 storeys each
Layouts
767–1,364 sq ftType A 767 · B 938 · C 1,109 · D 1,364
Car parks
Up to 4 baysAllocation varies by layout — confirm on your unit
Price range on permit
RM300,000 – RM1,177,000Tower A max RM1,132,000 · Tower B max RM1,177,000
Completion
July 2027 on the permitTopped out 5 March 2026 · 88% taken up
Why this address

Six things that actually separate Levia from the rest of Cheras

Cheras has no shortage of new high-rises. Most of them are serviced apartments on commercial land with sub-800 sq ft layouts. Levia is neither of those things, and that is the entire argument for it.

📜

Residential title, not serviced apartment

The advertising permit records the property type as Condominium and the developer markets it as residential title. That puts it under the Housing Development (Control and Licensing) Act — Schedule H, statutory delivery periods, a defect liability period and access to the housing tribunal. It also means residential assessment rates and residential electricity and water tariffs, which run lower than commercial ones every single year you own it. Most new Cheras high-rises cannot say that.

📐

Layouts sized for families, not for rental yield

938, 1,109 and 1,364 sq ft, with Type C and Type D built around two master bedrooms for multigenerational households. In a market where the default new launch is a 550 sq ft one-bedroom, this is a different product aimed at a different buyer — the upgrader already living in Cheras or Pandan who wants more room without leaving the neighbourhood.

🅿️

Up to four car parks

This is the quiet reason Cheras upgraders shortlist it. Bandar Sri Permaisuri and the older Cheras apartment stock are notorious for street parking spillover because the buildings were never given enough bays. A larger unit here comes with an allocation that can reach four. Confirm the exact number on your specific unit before the booking fee — allocation varies by layout and it is written into the sale and purchase agreement, not the brochure.

🌿

GreenRE Silver, and the bill behind it

GreenRE Silver rating, solar power for common areas, rainwater harvesting for common-area use and gardening, and 29 EV fast charging bays. The part that matters to your pocket is the first two: solar and rainwater serve the common areas, which is where your monthly service charge goes. Lower common-area running cost is the argument for a lower sinking fund draw later. Ask for the projected service charge per square foot and check it against that claim.

🏗️

Topped out, with a photo trail to prove it

Structure topped out on 5 March 2026. The developer publishes dated site photographs going back to October 2024, with the most recent set from July 2026. Buying a topped-out building removes the single biggest risk in an off-plan purchase — the risk that the structure never goes up. It does not remove delivery risk; facade, M&E, lifts, testing and certification all still lie ahead.

🚗

Road-first, rail-later — and I'd rather say so

The site sits against the MRR2 with the East–West Link, the Kajang–Seremban highway and the Sungai Besi Expressway all reachable. That is genuinely strong for a driver. For someone who wants to live without a car, the honest position today is that the nearest running station is Taman Pertama MRT at 2.3 km and MRT3 has not been built. Buy this for the drive time and the space, not for a walk to a train.

Project DNA

The whole development, decoded

Two identical towers, four layouts, one facilities floor and one sky floor. The interesting question is not which tower is better — they are the same building twice — but which tower still has stock, and at what price.

2Towers, 36 storeys each
778Units in total
4.71Acres of land
4Layout types

Tower A or Tower B

Artist's impression of a Levia Residence tower facade seen from the podium, Pandan Perdana, Cheras
First release

Tower A

Soft-launched in October 2023 and officially launched on 22 January 2024. By that launch date the developer reported Tower A at 75% taken up, with every Type A unit sold — the 767 sq ft two-bedroom, priced from roughly RM300,000. Types B, C and D were then quoted from RM684,000. The advertising permit records Tower A's ceiling price at RM1,132,000.

36Storeys
389Units
4Layouts
Type A · 767 sq ft 2 bed — sold out at launchType B · 938 sq ft 3 bedType C · 1,109 sq ft 3+1 bedType D · 1,364 sq ft 4+1 bed
💬 Ask about Tower A
Levia Residence tower facade under construction, July 2026 site photograph, Cheras, Kuala Lumpur
Second release

Tower B

Same 389 units, same four layouts, same built-ups. The developer's chief executive said plainly at the 2024 launch that Tower B would open later and would be priced slightly higher than Tower A. The permit bears that out: Tower B's ceiling price is RM1,177,000 against Tower A's RM1,132,000. If two comparable units are on the table, ask which tower each sits in and price the difference deliberately rather than by accident.

36Storeys
389Units
RM1,177,000Ceiling price on permit
Type A · 767 sq ft 2 bedType B · 938 sq ft 3 bedType C · 1,109 sq ft 3+1 bedType D · 1,364 sq ft 4+1 bed
💬 Ask about Tower B

25 facilities, and where each one sits

Taken from the facilities plan in Matrix Concepts' own brochure. Almost everything is on Level 6; the sky deck is on Level 36.

Facilities deck — the pool cluster

Level 6
  • Swimming Pool
  • Pool Deck
  • Pool Cabana and Shallow Pool
  • Kids' Pool
  • Jacuzzi
  • Pool Lounge
  • Outdoor Shower
  • Sauna

Facilities deck — garden and fitness

Level 6
  • Gym
  • Sports Lounge
  • Sunken Yoga Deck
  • Outdoor Fitness Garden and Reflexology Park
  • Forest Garden
  • Courtyard Garden
  • Garden Walkway
  • Garden Lounge
  • Water Feature Courtyard
  • Herb Garden
  • Open Green Lawn
  • Grill Deck
  • Farm Kitchen
  • Outdoor Co-working Deck
  • Kids' Playground

Arrival and community

Ground mezzanine and Level 1
  • Lobby Lounge
  • Management Office
  • Function Pavilion Hall
  • Prayer Room
  • Childcare (taska) space
  • Parcel delivery station

Sky floor

Level 36
  • Sky Lounge
  • Garden Deck

Building services

Whole development
  • 29 EV fast charging bays
  • AI-powered CCTV surveillance
  • Facial recognition access
  • Smart concierge service kiosk
  • Premium shuttle service
  • Solar power for common areas
  • Rainwater harvesting for common areas and gardening
  • GreenRE Silver rating

Where the project is now

Oct 2023Tower A soft launch
22 Jan 2024Official launch — Tower A 75% taken up, all Type A sold
5 Mar 2026Topped out — take-up reported at 88%
Jul 2026Latest published site photographs
Jul 2027Estimated completion date on the advertising permit
Layouts

All 3 Levia Residence @ Cheras floor plans

Four layouts, all north–south oriented. Type A is the one you will not find on the project website — the developer sold every Type A unit at launch and quietly stopped publishing it.

Levia Residence Type B floor plan — 938 sq ft, 3 bedrooms and 2 bathrooms, Cheras, Kuala Lumpur

Type B — 938 sq ft

3 bed 2 bath · 87 sqm · both towers

🛏 3 Bed🛁 2 Bath🌗 North–south
Get this floor plan
Levia Residence Type C floor plan — 1,109 sq ft, 3+1 bedrooms and 3 bathrooms with dual master suites, Cheras

Type C — 1109 sq ft

3+1 bed 3 bath · 103 sqm · two master suites

🛏 3+1 Bed🛁 3 Bath👨‍👩‍👧 Two masters
Get this floor plan
Levia Residence Type D floor plan — 1,364 sq ft, 4+1 bedrooms and 3 bathrooms, the largest layout, Cheras

Type D — 1364 sq ft

4+1 bed 3 bath · 127 sqm · the only layout that can clear RM1m

🛏 4+1 Bed🛁 3 Bath👨‍👩‍👧 Two masters
Get this floor plan
Location & connectivity

Where Levia Residence @ Cheras sits

Levia Residence sits on a 4.71-acre parcel in Pandan Perdana, Cheras, on the Kuala Lumpur side of the Middle Ring Road 2 — inside the Federal Territory, not Selangor. That distinction matters more than it sounds: the approving authority on the developer's own advertising permit is DBKL, and every rule on this page follows from the site being in Kuala Lumpur.

Open in Google Maps →
📍 Pandan Perdana, off Jalan Lingkaran Tengah 2 (MRR2)56100 Cheras

Cheras straddles the Kuala Lumpur–Selangor boundary, and the half of it that sits in Selangor answers to a different local authority and a different state land office. Levia is on the Kuala Lumpur side. If you are comparing it against a project further out along Jalan Cheras, check which side of that line the other project falls on before you compare taxes, consent procedures or assessment rates.

On MRT3. The developer's own distance table puts a future MRT3 Taman Cheras station 0.7 km away and MRT3 Taman Kencana at 1.0 km. MRT3 is the Circle Line and it is not built. Today the nearest operating rail is Taman Pertama MRT at 2.3 km on the Kajang line, which is a drive or a feeder ride, not a walk. Treat MRT3 as upside you are not paying for yet.
💬 Ask me about the real drive times
  • Future MRT3 Taman Cheras station0.7 kmnot built — developer's figure
  • Future MRT3 Taman Kencana station1.0 kmnot built
  • Pantai Hospital Cheras2.1 kmnearest private hospital
  • Taman Pertama MRT (Kajang line)2.3 kmnearest operating station
  • Cheras Business Centre2.4 kmlocal commercial hub
  • Sri Sempurna International School2.5 kmnearest international school
  • Cheras LeisureMall2.7 kmby road
  • Taman Midah MRT2.8 kmKajang line
  • Taman Pudu Ulu park3.6 kmnearest large park
  • Hospital Canselor Tuanku Muhriz (UKM)3.8 kmteaching hospital
  • Maluri MRT / LRT interchange3.9 kminterchange to Ampang line
  • IKEA Cheras and MyTOWN5.3–6.2 kmby road
  • Sunway Velocity Mall5.5 kmby road
  • Tun Razak Exchange (TRX)9.8 kmdeveloper's figure
  • Merdeka 1189.8 kmdeveloper's figure
  • Pavilion KL and Suria KLCC10.2–10.4 kmby road
The government record

The nearest register match is Elevia, not Levia — and it is in Petaling

Searching the National Housing Department register returns 8056-18, “Elevia Residences” — 162 units, 118–247 sq m, completed with CCC, in Daerah Petaling, Selangor.

One letter apart, and a different district from this page. That is exactly the kind of near-miss that should not be published as a match, and it is not going to be.

What that does not prove

Not finding this development under “Levia” is not evidence that it is unlicensed. Malaysian schemes are registered under a licensed project company and a statutory building or taman name, and the marketing name usually does not appear in the record at all. On this same site, “Fraser Heights” is in the register verbatim while “BEE” does not appear anywhere — and BEE is fully permitted with two live permits.

A missing search hit is a missing key, not a finding. Publishing an absence as though it were evidence would be the worst thing this site could do.

The question that settles it in one minute

“Which licensed developer entity and which KPKT project code applies to the unit you are selling me?”

With a project code you can open teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=<code> and read the permit number and expiry, the unit count, the built-up range, the permitted price band, the construction progress percentage and the status. All of it from a public government source, none of it dependent on anyone’s cooperation.

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Track record

About Matrix Concepts (Cheras) Sdn Bhd

The company that will sign your sale and purchase agreement is Matrix Concepts (Cheras) Sdn Bhd, 201701015888 (1230052-H). It is a project company inside Matrix Concepts Holdings Berhad, 199601042262 (414615-U), which is listed on the Main Market of Bursa Malaysia under the ticker MATRIX. Ask for the licence in that project company's name, not the group's: developer's licence 30392/03-2028/0069(N), valid 8 March 2023 to 7 March 2028.

Matrix is a Seremban company. Its home market is Negeri Sembilan townships, and Levia is only its second Klang Valley development after Chambers KL, completed in 2018. That is a shorter high-rise record in this city than a buyer might assume from the group's size, and it is worth knowing rather than glossing over. What partly offsets it: Levia is the first high-rise the group has built with its own in-house construction team rather than a third-party main contractor, and the group topped the structure out on 5 March 2026 with take-up reported at 88%.

The group also publishes dated site photographs — October 2024, December 2024, March, June and November 2025, then January, March and July 2026. Publishing a running photographic record is not universal among Malaysian developers, and it lets you check the programme against something other than a press release. Credit where it is due.

Levia Residence construction progress photograph dated July 2026, Pandan Perdana, Cheras, Kuala Lumpur
Site progress · July 2026
Interior fit-out progress inside a Levia Residence unit, July 2026 site photograph, Cheras, Kuala Lumpur
Internal fit-out · July 2026
Levia Residence site photograph from March 2026, the month both towers topped out, Cheras, Kuala Lumpur
Site progress · March 2026, topping out
Straight answers

Frequently asked questions

Is Levia Residence in Kuala Lumpur or in Selangor?

Kuala Lumpur — the Federal Territory. The approving authority printed on Matrix Concepts' own advertising permit is DBKL, and the building plan reference is DBKL.JKB.BP S2 OSC 2022 1411 (20). That is documentary, not inference.

This question is not pedantic. Cheras straddles the Kuala Lumpur–Selangor boundary: the inner half, including Pandan Perdana, is Federal Territory under DBKL; the outer half along Jalan Cheras towards Kajang is Selangor under a different local council and a different state land office.

Three things change with that line. Assessment rates are set by different authorities and computed differently. State consent for a non-citizen buyer goes to a different body — in Kuala Lumpur that is the Federal Territory land administration, not a state government. And minimum purchase price for foreigners is set state by state, so the Kuala Lumpur figure does not carry over the boundary.

If you are cross-shopping Levia against something further out along Jalan Cheras, establish which side of the line the other project is on before you compare anything. People get this wrong constantly.

Can a foreigner buy at Levia Residence?

Only at the very top of the price list, and there is very little of it left. Kuala Lumpur applies a RM1,000,000 minimum purchase price to residential property acquired by a non-citizen. The advertising permit records Levia's price range as RM300,000 to RM1,132,000 in Tower A and RM300,000 to RM1,177,000 in Tower B. So the only units that clear the threshold are the highest-priced Type D stacks — and the project was 88% taken up as at March 2026.

I would rather say that plainly at the top than bury it. If you are a foreign buyer, the realistic answer for Levia today is that you should ask me first whether anything above RM1 million is still available, before you fall in love with a floor plan.

If a qualifying unit does exist, here is what the purchase actually involves. State consent: under section 433B of the National Land Code a non-citizen needs written approval before the transfer can be registered; in Kuala Lumpur that application goes through the Federal Territory land administration rather than a state government. Budget several months. There is no Kuala Lumpur equivalent of the Johor foreign buyer levy — the 3%-or-RM30,000 charge you may have read about is a Johor state measure and does not apply here.

Stamp duty: from 1 January 2026 a flat 8% applies on the transfer instrument for residential property acquired by a non-citizen who is not a permanent resident. Levia is residential, so it applies. On a RM1.1 million unit that is RM88,000, and it is payable in cash on top of the purchase price. Real property gains tax on exit: a non-citizen pays 30% within five years and 10% from the sixth year onwards, with no zero band ever. Model your exit before you model your entry.

MM2H status changes your visa. It does not change the price floor, the stamp duty rate or the RPGT rate. Anyone telling you otherwise is selling something. Confirm the specifics with a conveyancing lawyer before you commit — that is what they are for.

What are the unit sizes and layouts at Levia Residence?

Four layouts: Type A 767 sq ft, Type B 938 sq ft, Type C 1,109 sq ft and Type D 1,364 sq ft. Type B is a straight three-bedroom, two-bathroom. Type C is 3+1 bedrooms with three bathrooms. Type D is 4+1 bedrooms with three bathrooms. Type A is a two-bedroom.

Here is a discrepancy worth flagging, because you will hit it if you research this yourself. The project website shows only three layouts — B, C and D, and describes the range as 938 to 1,364 sq ft. The developer's brochure specification page says 767 to 1,364 sq ft, two to four bedrooms, and the facilities plan legend labels four unit types including Type A.

Both are true, at different points in time. The Edge reported at the January 2024 launch that every Type A unit in Tower A had already sold, priced from approximately RM300,000. A developer that has sold out a layout usually stops showing it. That also explains why the advertising permit still records a RM300,000 floor price that no longer matches anything you can buy.

Type C and Type D are the ones designed around two master bedroom suites — the multigenerational configuration. If you are buying for parents or grown children living with you, that is the specific reason to look at those two rather than Type B.

All units are stated as north–south oriented, which in Kuala Lumpur means you avoid taking the full afternoon sun on the long facade. Ask which stack your specific unit sits on and check it on the key plan, because orientation on a floor plan and orientation on the actual block are not always the same conversation.

What is the price, and what is the maintenance fee?

The developer has not published a current price list, and I am not going to invent one. What is on the public record is this: the advertising permit records RM300,000 to RM1,132,000 for Tower A and RM300,000 to RM1,177,000 for Tower B, and The Edge reported in March 2026 that units were priced from RM660 per square foot, on a gross development value of RM523 million.

Those two do not reconcile, and I would rather explain why than pick one. The permit figures are the range registered when the licence was issued, and the RM300,000 floor corresponds to the Type A units that sold out in 2023. RM660 psf against the smallest currently marketed layout, the 938 sq ft Type B, works out to roughly RM619,000 — which is consistent with The Edge's separate report that Types B, C and D opened from RM684,000 in Tower A. In short: the permit range is historical, the psf figure is closer to reality, and neither is a price list.

The maintenance fee has not been published either. On a residential-title condominium with a Level 6 facilities deck, a Level 36 sky floor, 29 EV charging bays, lifts serving 36 storeys and landscaped grounds on 4.71 acres, the service charge is not a rounding error. Ask for the rate per square foot and the budget it is based on, both in writing.

The other number nobody quotes you is the sinking fund contribution, and the third is the DBKL assessment rate. On residential title both are lower than the commercial equivalent, which is one of Levia's real advantages — but lower is not zero and they recur every year you own it.

Message me and I'll get the live price list with the psf by level band, the published service charge and sinking fund, the car park allocation on your specific unit, and the handover specification. Those four answers change your total outlay more than any discount you will be offered.

Is the advertising permit on the developer's website still valid?

The one printed on the site had a validity period ending 13 July 2026. The disclosure reads: sales and advertising permit 30392-1/07-2026/0810(N)-(S), validity 14 July 2023 to 13 July 2026. Today is after that date.

I am not claiming the developer is selling without a permit. In practice a developer renews the advertising and sales permit as the project runs on, and the website footer is often the last thing to be updated. But the permit is the document that authorises the marketing you are reading, and you are entitled to see a current one.

So ask for it, and ask for the developer's licence alongside it. The licence is 30392/03-2028/0069(N), valid 8 March 2023 to 7 March 2028, and both are issued to Matrix Concepts (Cheras) Sdn Bhd (1230052-H), not to the listed holding company. Check the number and the dates on the actual document rather than accepting a verbal assurance.

This is a two-minute check that most buyers never do, and it is exactly the kind of thing I do on your behalf before you pay a booking fee.

When will Levia Residence be completed, and why do the dates differ?

Three credible sources give three different dates, so here they all are. The developer's own advertising permit disclosure states an estimated completion date of July 2027. The Edge, reporting from the January 2024 launch, wrote that both towers were expected to complete in the third quarter of 2027. The Edge again, reporting the topping-out on 5 March 2026, wrote that the project was on track for completion in early 2027.

None of them is wrong; they are different kinds of statement made at different times. The permit date is a formal registration. The 2024 quarter was a launch-day projection. The 2026 line was a topping-out press briefing. That spread of roughly nine months is normal on a project of this size and is not, by itself, a warning sign.

What binds the developer is none of the above. It is the delivery period written into your Schedule H sale and purchase agreement, which on a residential-title strata development runs 36 months from the date of the agreement, with liquidated damages payable if it is missed. Read that clause, note the date the period runs from — it is your agreement date, not the launch date — and keep it.

Topping out means the structural frame is finished. Facade, mechanical and electrical works, lifts, fire systems, testing and commissioning, then CCC certification all follow. A gap of a year or more between topping out and vacant possession is ordinary.

If you are timing this against a lease expiry or the sale of an existing home, build in a buffer and ask for the contractual delivery date in writing. I'll check the published site photographs against the stated programme for you — that is a more useful signal than any spokesperson's quote.

Should I be worried about oversupply in Cheras?

You should look at it properly rather than either dismiss it or panic. NAPIC's Q1 2026 figures put Kuala Lumpur's completed unsold residential stock at 3,733 units, fourth-highest of any state and the biggest single-quarter jump in the country — up 1,678 units on the previous quarter. Nationally the residential overhang reached 32,801 units worth RM16.37 billion.

That is the number that applies to Levia, and it is worth being precise about why. Levia is a residential-title condominium, so it sits in the residential overhang series. The separate and larger problem — 4,181 unsold completed serviced apartments in Kuala Lumpur, with 58.5% of the national serviced-apartment overhang sitting in the RM500,001 to RM1 million band — is a different asset class. Plenty of new Cheras high-rises are in that second series. Levia is not. Mixing the two is how bad advice gets written, so I am keeping them apart.

The honest read: overhang is concentrated by project, price band and product type, not spread evenly across a postcode. A 938 to 1,364 sq ft residential-title family unit competes against a thin supply of comparable stock in Cheras, because most of what has been launched around it is smaller and on commercial title.

The counterweight is liquidity. Larger units in a 778-unit building re-sell more slowly than small ones simply because the buyer pool is narrower — you are selling to families who want three or four bedrooms in Cheras specifically, not to yield investors anywhere. Buy this as a home you intend to live in for years, and that is a strength. Buy it as a two-year flip and it is a trap.

Before you commit, get the actual transacted prices for comparable 900 to 1,400 sq ft units within two kilometres over the past twelve months, not asking prices. Ask me and I'll pull them along with the latest NAPIC Kuala Lumpur figures.

Leasehold to 2122 — how much should that worry me?

The title is a 99-year lease expiring on 30 January 2122. As at 2026 that leaves roughly 96 years, which is about as much lease as a leasehold title in Kuala Lumpur ever has.

The practical issue with leasehold in Malaysia is not the expiry date itself — nobody reading this will be alive for it. It is the point at which the remaining term starts to affect financing. Banks look closely at the balance of the lease against the loan tenure, and valuers begin discounting once the remaining term falls below roughly 60 years. At 96 years remaining, that is a problem for a much later owner, not for you.

The second leasehold issue is consent to transfer. On leasehold state land in Kuala Lumpur, a resale typically requires the land authority's consent before the transfer can be registered, which adds weeks and a fee to any onward sale. Factor that into your exit timeline. On freehold there is no such step.

The third is that leasehold generally trades at a discount to comparable freehold in the same location. That cuts both ways: you paid less going in, and you will receive less going out. It is priced, not hidden.

What I would not do is treat leasehold as disqualifying. Large parts of Kuala Lumpur — including most of Bandar Sri Permaisuri and much of Cheras — are on leasehold state land, so the alternative is often not a freehold version of the same thing, it is a different neighbourhood entirely.

Can a foreign buyer get a Malaysian bank loan for Levia?

Yes in principle, on tighter terms than a Malaysian gets, and only on a unit that clears the RM1 million floor in the first place. That last condition does most of the work at Levia — see the foreign-buyer answer above.

Where the terms differ: margin of financing for a non-resident is typically well below the 90% a Malaysian first-time buyer might see, so plan a materially larger cash contribution. Tenure is usually shorter, which raises the monthly instalment at the same rate. Income assessment on foreign-sourced income means certified translations, tax returns and often a longer processing time, and some banks will not lend at all without an existing relationship or a Malaysian income stream.

Budget the cash items separately from the loan, because financing does not cover them: the 8% stamp duty on the transfer instrument for a non-citizen, legal fees on both the SPA and the loan documentation, the state consent application fee, and valuation. On a RM1.1 million purchase the stamp duty alone is RM88,000.

One more thing that catches foreign buyers out: rental income earned by a non-resident is taxed at a flat 30% on the net, with no personal relief. If you are modelling a yield, model it after that, not before.

Tell me your nationality, your residency status, whether the income is Malaysian or foreign, and whether you are buying personally or through a company. I'll tell you which banks are actually writing this kind of deal right now rather than which ones say they might.

Which stacks are left, and at what price

The project was 88% taken up at topping out in March 2026. That means the question is no longer whether to buy Levia, it is whether anything left in it suits you. Tell me your budget, the layout you want and which direction you'd rather face, and I'll come back with what actually exists on today's price list.

No agent fee payable by the buyer on new developer launches

Louis Koh

11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文

I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.

💬 Message Louis

Published 2026-08-11 · Last verified 2026-08-11 against Matrix Concepts (Cheras) Sdn Bhd's published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Levia Residence @ CherasResidential title · 767–1,364 sq ft · Topped out Mar 2026
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: Matrix Concepts (1 development on this site)

Where it is: Cheras, Kuala Lumpur (KL)

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

30392-1 · RESIDENSI BAYU

Overall status: Lancar — on schedule

Certified completion by componentRumah Pangsa/Kondo – 389 units84.62%Rumah Pangsa/Kondo – 389 units80.78%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
37 storeys
Lancar
3, 4 / 2, 3—389RM300,000.00
– RM1,132,000.00
84.62%
Rumah Pangsa/Kondo
37 storeys
Lancar
2, 3, 4 / 2, 3—389RM300,000.00
– RM1,177,000.00
80.78%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-17, project code 30392-1. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.