Phoeniz Suites @ KL City Centre — no filed advertisement particulars exist, and the permit that would authorise the sale may not have been issued yet
Every other page in this series opens with the developer’s filed statutory particulars. This one cannot, because no filing could be located for this scheme by any route, and no source anywhere publishes a developer licence number or an advertising and sale permit (APDL) number for it. That is not a research gap — it is the finding, and it has a sharp consequence: with no permit number and no validity period on the record, nobody outside the developer can tell whether a permit is current, lapsed, or not yet issued. Then read the developer’s own wording. phoenizklcc.my states expected completion as “60 months after APDL obtained” — future tense — on the same site that prices units by type and publishes a rental programme. Groundworks were only awarded in September 2026 and the site was still being cleared in Q3 2026. A licensed housing developer may not advertise or sell housing accommodation without a permit in hand.
No price list, no quotation, no offer. This page publishes no price figure for Phoeniz Suites at all — not a statutory band, because none is filed; not a registry band, because none exists; and not a marketing figure, because the only ones published cannot be checked against a filed minimum and because the project’s own rental programme is quoted on a basis that is not the advertised price. Today is 5 October 2026.



Phoeniz Suites at a glance — and which source each line comes from
On every other page in this series this table is anchored to the filed advertisement particulars. Here there are none, so each row names the source that published it and says plainly whether that source is the developer, the contractor’s stock-exchange filing, or an agent site. Rows that read NOT PUBLISHED or NOT OBTAINABLE are findings, not omissions.
- Registered scheme name as filed with KPKT
- NOT OBTAINABLEThe only document class that prints the registered scheme name is the filed advertisement brochure, and none could be located. “Phoeniz Suites @ KL City Centre” is therefore a marketing name throughout this page, not a registered one
- Licensed developer (the licensee)
- EXSIM YKS 54 SDN BHDCorroborated four ways — EdgeProp’s report of the Aneka Jaringan contract award, The Edge Malaysia, Business Today and the Bernama/Newswav Malay report all name it as the employer for the works at Lot 54, Jalan Yap Kwan Seng. Every portal and agent site says only “EXSIM” or “EXSIM Group”, which is a brand, not the contracting party
- Company registration number
- 1361275-W — single-sourcedPublished on exactly one website, phoenizklcc.my, in its footer and FAQ. It could not be corroborated against a filing, a Bursa announcement or any press report. The name is quadruple-sourced; the number is not. Treat it as the developer’s own unverified statement
- Developer licence number (No. Lesen Pemaju)
- NOT PUBLISHED by any sourceNot on the developer’s site, not on any agent site, not in any press report, not on KPKT’s HIMS filed-advertisement service. Fifteen retrieval routes were tried; they are listed in the register section below
- Advertising and sale permit number (APDL)
- NOT PUBLISHED by any sourceSame fifteen routes, same result. Consequence: it cannot be determined whether a permit exists, is current, or has lapsed. On sibling schemes by this group the permit number is the single most load-bearing fact on the page; here it is simply absent
- Permit validity period
- NOT OBTAINABLENo date exists to check against today’s date. This page therefore does not describe any permit as current, and does not describe one as expired either
- Expected completion
- Developer: “60 months after APDL obtained” · saratan.my and kl.propertylau.com: 2029 / Q4 2029 · exsimklcc.com: “Before 2030” and “2029” on the same page · thephoenizklcc.com and realty.ericanfly.com: no date at allThe developer’s wording is not a date. It is a period that starts running from an event that no source can show has happened. The substructure contract alone runs to 14 August 2028, with a 53-storey superstructure, fit-out and certificate of completion and compliance still to follow — which makes a 2029 handover look tight on the contractor’s own timetable. No date on the record is a filed date
- Total strata parcels
- 394 serviced apartments + 1 strata office unit = 395The 394 is published everywhere. The strata office unit at Level 3A appears only in the contractor’s Bursa announcement, reported by four outlets, with the level given by the Bernama/Newswav Malay report. The published layout schedule sums to 199 + 150 + 45 = exactly 394, which shows the office parcel is excluded from it rather than folded into it
- Storeys
- 53 total, of which 45 residential53 is published by phoenizklcc.my, exsimklcc.com, saratan.my and all four reports of the contract award. The 45-residential split comes from the Bernama/Newswav Malay report alone. thephoenizklcc.com says 51 — a minority of one, and this page does not use it
- Land area
- 0.56 acrePublished by phoenizklcc.my, saratan.my and kl.propertylau.com. That is 24,394 sq ft or 2,266 sq m — my conversions, not the developer’s figures
- Density
- 703 units per acre (395 parcels per acre including the strata office)My arithmetic: 394 ÷ 0.56. Land area is published, so density is computable, and exsimklcc.com’s description of Phoeniz as a “low density development in KLCC” is not supportable at that figure
- Tenure and title
- Freehold, on commercial title; housing accommodation sold under the HDATenure from phoenizklcc.my and every agent source. The commercial-title point is from saratan.my, kl.propertylau.com and exsimklcc.com (“Commercial HDA”). The single Level 3A strata office parcel is commercial outright, with none of the HDA protections
- Filed building type (Jenis Bangunan)
- NOT OBTAINABLEThe contract reporting describes the works as pangsapuri servis (service apartments) in Malay and as a “53-storey serviced apartment development” in English. That is a description in a stock-exchange announcement, not a filed building type, and this page does not present it as one
- Approving authority
- Dewan Bandaraya Kuala Lumpur (DBKL)Stated here as geography — DBKL is the local authority for this address — and not as a filed value, because no filing was obtained. The building-plan approval number is likewise NOT OBTAINABLE
- Land encumbrance / chargee bank
- NOT PUBLISHED by any sourceFor a 53-storey tower under construction this is a material omission. A buyer should ask which bank holds the charge over the land and whether a redemption or disclaimer letter will issue on completion of the sale
- Filed statutory unit selling price, minimum to maximum
- NONE EXISTSThere is no filing, so there is no statutory minimum or maximum. There is also no public government registry band: KPKT has nothing, the Selangor state register does not cover Kuala Lumpur, and NAPIC publishes no per-project band for an unlaunched tower. This page therefore publishes no price
- Layout schedule
- A/A(M) 484 sq ft × 199 · B1/B1(M) 657 sq ft × 150 · B2 678 sq ft × 45Published identically by phoenizklcc.my, saratan.my, kl.propertylau.com and realty.ericanfly.com. These are marketed built-ups, not a filed schedule. Square-metre equivalents (45.0, 61.0, 63.0 sq m) are my conversions. No built-up, layout or purpose is published for the strata office unit
- Lifts
- 6 passenger + 1 servicephoenizklcc.my/faq.html and exsimklcc.com. saratan.my says “six lifts”. No source publishes a lift-to-unit ratio or a traffic analysis for 394 units over 45 residential floors
- Car park
- Three published answers that do not reconcilephoenizklcc.my/faq.html: “174 bays plus OKU and P-Hailing lots”, smart mechanical parking. saratan.my: “no suite comes with a bay of any kind”, stated to have been confirmed with the developer. kl.propertylau.com: a mechanical parking system from ground to Level 16. The contractor’s own scope includes mechanical car parking. See the dedicated section below — this is the most material unresolved point of fact on the project
- Maintenance charge
- RM1.21 per sq ft per month, sinking fund includedPublished by phoenizklcc.my/faq.html, saratan.my and kl.propertylau.com. exsimklcc.com publishes RM0.81 instead — contradicted by three sources including the developer’s own site. saratan.my characterises RM1.21 as the highest of any project it lists. A maintenance rate quoted before handover is an estimate in every case, and no source says it is fixed
- Architect
- WDA ArchitectsNamed as the employer’s representative in the Bernama/Newswav Malay report. The project’s own marketing never names its architect, which is unusual for copy that calls the building “a stunning architectural marvel”
- Substructure contractor
- Aneka Jaringan Sdn Bhd — RM26.2 million excluding service taxLetter of award received 22 September 2026, accepted 23 September 2026. Works period 15 September 2026 to 14 August 2028: earthworks, piling, pile caps, retaining walls and substructure. Source: EdgeProp’s report of the Aneka Jaringan contract award and three other outlets
- Green certification
- Developer states “GreenRE-accredited” — no rating, no certificate number, no date“Accredited” is not a GreenRE term; GreenRE awards Bronze, Silver, Gold or Platinum, provisionally at design stage and finally on completion. No registry entry could be retrieved for Phoeniz, for EXSIM YKS 54 or for any Jalan Yap Kwan Seng project, and the GreenRE project platform reports itself temporarily unavailable — so the registry check is inconclusive, not negative. GBI has no entry at all
- Awards
- None. Phoeniz Suites has won nothingThe FIABCI World Prix d’Excellence 2026 World Silver awards and the 86% QLASSIC scores that phoenizklcc.my lists as developer credentials belong to Millerz Square @ Old Klang Road and The Arcuz @ Kelana Jaya, per The Edge Malaysia’s report of the FIABCI 2026 awards. QLASSIC is a post-completion workmanship score; a tower at site-clearing stage cannot have one
- Rental / leaseback programme
- Exists. Operator: Mana Mana HospitalityStructure is described in the developer section below. No rate, percentage, yield or projection appears anywhere on this page, and the reason is given in full under “what this page does not publish, and why”
- Where the project is not
- No page on the developer’s own corporate site; no PropertyGuru or iProperty project pageexsim.com.my carries 29 developments and no Phoeniz; its direct URL for the project returns 404 and its media API returns 404. No portal project record exists either, although every KLCC sibling has one. Almost nothing on this project is independently corroborated, and that is itself worth knowing
Jump to the part you came for
Ordered the way a buyer actually asks — the missing permit first, the brochure copy last.
Eight things on this page that no listing for Phoeniz Suites will tell you
None of this is a judgement about the building. All of it is either a difference between published sources, or an absence in the public record, or arithmetic on figures the developer itself publishes.
The permit that authorises the sale may not exist yet
The developer’s own site states completion as “60 months after APDL obtained” — wording that puts the permit in the future — while the same site prices units by type, publishes a unit mix and markets a rental programme. Groundworks were awarded in September 2026 and the plot was still being cleared in Q3 2026. One agent site gives “Launch Year: 2025”. A licensed housing developer may not advertise or sell without an advertising and sale permit in hand. No source publishes a permit number, so this cannot be resolved from outside — which is exactly why it belongs on the first screen.
There is a 395th parcel, and it is not housing
The contractor’s Bursa Malaysia announcement puts one strata office unit at Level 3A alongside the 394 serviced apartments. No microsite, agent site or review mentions it, and the published layout schedule sums to exactly 394 — so the exclusion is deliberate, not accidental. A strata office is not housing accommodation: no Schedule H, no statutory liquidated damages, no housing development account. No layout, built-up or purpose is published for it by anyone.
Three answers on car parking, and they cannot all be true
The developer’s FAQ says 174 bays plus OKU and P-Hailing lots. One reviewer says flatly that no suite comes with a bay of any kind, and says that was confirmed with the developer. A third source describes a mechanical parking system from ground to Level 16, and the contractor’s scope includes mechanical car parking. For a KLCC-fringe product this materially changes what you are buying. Get the bay allocation written into the sale and purchase agreement.
The developer’s own site gets the street wrong — twice
The contract filing places the project at Lot 54, Jalan Yap Kwan Seng, Seksyen 43, and five other sources agree. The footer of the site carrying the developer’s legal notice says Jalan Tun Razak. Its FAQ page says “Jalan Liew Weng Chee, off Jalan Tun Razak”. So the developer-side site gives two streets, and neither is the one in the filing. The company’s own name — EXSIM YKS 54 — reads as Lot 54, Jalan Yap Kwan Seng, which settles it against the microsite.
“Hugoz 2” points you at a different, separately licensed scheme
Three sources and one hostname brand this project “Hugoz 2”, borrowing the name of the group’s adjacent, sold-out Hugoz Suites. The developer’s own footer never uses it. Hugoz is licensed to Armada Istimewa Sdn Bhd (1085375-U) — a different company, a different scheme, a different permit, a different set of filed particulars. A buyer searching “Hugoz 2” is being shown the wrong building’s track record. Both pages are linked below so you can see the difference.
“300 metres to the station” collapses three stations into one
MRT Ampang Park (Putrajaya Line), LRT Ampang Park (Kelana Jaya Line) and LRT KLCC are three separate stations at three different distances. One agent site prints “Ampang Park MRT & LRT 300m / 3 Min Walk”; another prints 450 m to a “KLCC Ampang Park MRT Station” that does not exist. The only source that measures them separately gives 390 m, 605 m and 600 m. The developer publishes no distance to anything at all.
“Low density development in KLCC” against 703 units per acre
Land area is published — 0.56 acre — so the density can be computed and does not have to be taken on trust. 394 residential units on 0.56 acre is 703 units per acre; including the strata office parcel, 705 per acre. That is my arithmetic on the developer’s own figure, and it is the densest number in this whole series of pages. The floor-plate arithmetic does not close either: 394 units over 45 residential storeys averages 8.8 per floor against one agent site’s “10 units typical”, and no source publishes a stack plan.
The awards and the QLASSIC score belong to other buildings
The developer-side site lists a FIABCI World Prix d’Excellence win among its credentials. Those 2026 World Silver awards went to Millerz Square (Mixed-Use) and The Arcuz (Residential High Rise), and the 86% QLASSIC scores are theirs too. Phoeniz Suites is unbuilt. It holds no award, has no QLASSIC score, and its GreenRE claim carries no rating letter, no certificate number and no date.
Project DNA — what the developer publishes, what one agent site adds, and what nobody publishes
There is no complete facilities schedule and no numbered legend or plan sheet for Phoeniz Suites from any source. saratan.my states that plainly: EXSIM has published no numbered facilities legend and no plan sheet. exsimklcc.com publishes a photo gallery and a “Master Layout” graphic with no itemised facility names in text at all. What follows is the developer’s own short text list, which assigns levels to six items only, kept separate from the level assignments that exist on one agent site and nowhere else.
Facilities, and the only levels anyone assigns them to
The first column is the developer’s own, published as running text on phoenizklcc.my. The second and third columns are facilities that appear on agent or reviewer pages and not on the developer’s list — they are not attributed to the developer here. Note that the developer assigns levels to Level 51 and Level 52 only, and that no source publishes what occupies Levels 1 to 4, Levels 6 to 50, or the podium.
Sky level — developer’s own list
- Sky Pool, described as infinity-edge
- Sky Pool Deck
- Sky Deck & Lounge
- Caption-published by the developer as “Sky Pool · Level 52”
Sky level — developer’s own list
- Sky Gymnasium
- Sky Music Lounge
- Co-Working & Meeting
- No area, size or capacity is published for any of them
Named by the developer with no level given
- 24-hour security & CCTV
- Smart Mechanical Parking
- Leisure Pool, caption-published as “Leisure Pool — The Heated Sanctuary”
- A “50-metre lap pool” appears on one microsite; saratan.my notes that no primary source confirms it, and no pool dimension is published anywhere. This page does not repeat the 50-metre claim
On agent or reviewer pages only — not on the developer’s list
- Nursery and “Civil Hawker Area” at Level 5 — kl.propertylau.com only, on a page that simultaneously states EXSIM has published no facilities legend
- Mechanical parking system, ground to Level 16 — kl.propertylau.com only
- Resident Lounge & Bar, and Concierge as a named facility — thephoenizklcc.com only
- Jacuzzi, cabana deck, sky garden lounge, Gourmet Loft, Sky Lounge with shared kitchen and dining — saratan.my and kl.propertylau.com; the developer-side site names none of these
- Vaulted arrival lobby and 24-hour concierge at street level — saratan.my and kl.propertylau.com
- The single strata office unit at Level 3A — the Bernama/Newswav Malay report only, from the contractor’s filing. It is on no consumer-facing source at all
Timeline — and the gap where the permit should be
Layouts — three marketed types, and one parcel nobody markets
There is no filed built-up schedule for this project, so nothing below is a filed figure. The three types are published identically by phoenizklcc.my, saratan.my, kl.propertylau.com and realty.ericanfly.com. The three unit-plan drawings reproduced here have been carried on this page since August 2026; their subject basis is the type code in the file name as published on this site, not a developer content-management title. Square metres are my conversions.

Type A / A(M) — 484 sq ft (45 sq m), 199 units
exsimklcc.com recodes this type as “2 Bedrooms, 1 Bathroom”. Every other source publishes one room plus a study, and a study is not a bedroom. saratan.my adds a detail no other source carries: “1 bedroom + study, 1 bathroom + WC” — a bathroom and a separate WC. The (M) suffix is published with no explanation by anybody; mirrored layout is the usual convention in Malaysian schedules, but that is not published here, so this page does not assert it.
Ask about Type A
Type B1 / B1(M) — 657 sq ft (61 sq m), 150 units
“Dual key” is supported by the developer side’s own room list, but only just. kl.propertylau.com resolves it most clearly as “Dual Key (1+1 Room, 2 Bath)”, and two bathrooms is consistent with two lockable sub-units. But no source publishes a dual-key plan key, a sub-unit built-up split, separate entrance doors or separate utility metering, and the developer prints the phrase as an image caption rather than in a room schedule. Treat dual key as published but unproven. exsimklcc.com again recodes this as two bedrooms.
Ask about Type B1
Type B2 — 678 sq ft (63 sq m), 45 units
thephoenizklcc.com adds that Type B2 is a “KLCC View” unit — a view claim no other source supports and which this page does not adopt, because no stack plan or unit-facing schedule is published by anyone. The corner description comes from saratan.my alone. The 21 sq ft difference between B1 and B2 is published with no explanation of where it sits in the plan.
Ask about Type B2The strata office unit at Level 3A — 1 parcel, and no published particulars at all
This is the reason the layout schedule above sums to 394 and not 395. A strata office unit is not housing accommodation, so it falls outside the Housing Development (Control and Licensing) Act: no Schedule H statutory sale and purchase agreement, no HDA liquidated damages for late delivery, and no ring-fenced housing development account. Its contract of sale would be a plain commercial agreement. A single Level 3A office in a tower like this is typically a management or operator office rather than a retail offering — but that is inference and no source states which, so this page does not assert a purpose. Whether it is being sold, retained, or used as the management office is on the list of things nobody publishes.
The three built-ups above are marketed figures with no filed schedule behind them. Not published by anyone: the stack plan and which floors hold which type; what occupies Levels 1 to 4 and Levels 17 to 50; what “(M)” denotes; the dual-key sub-unit split, entrance arrangement and metering; ceiling and floor-to-floor heights; glazing and air-conditioning specification; whether units are delivered furnished, partly furnished or bare as a contractual specification; balcony provision; share units; and the car park entitlement per type. Nothing in that list is estimated here. The three drawings shown are the developer’s artwork, reproduced from this page’s own August 2026 attachments; the developer’s floor-plan disclaimer reads “artist’s illustrations only · subject to change · E.&O.E.”
Gallery — the developer’s own images, with each subject graded







How these subjects were graded, and why it matters here. phoenizklcc.my is a static hand-built site — flat asset paths, no WordPress, no generator tag, no REST API — and exsim.com.my’s media API returns 404 and carries no Phoeniz media at all. There is therefore no content-management system anywhere that can confirm an image title, MIME type or dimensions for this project. Of the nine renders on this page, eight are caption-published (the developer prints a caption against the image, and the file name agrees) and one — the hero image — is inferred from its file name alone, with no caption printed against it. The file-name-to-caption pairing is itself an inference in every case. Each URL was fetched individually and returned a real image body, checked against two deliberately bogus control URLs on the same host which both returned a clean 404 with no HTML shell — so reachability here is a trustworthy signal rather than a guess. Every image is an artist’s impression. The developer’s own disclaimer reads: “All images are artist’s impressions and information is for illustration only; particulars are subject to change and do not form part of any offer or contract. E.&O.E.” Site status as at Q3 2026 was site clearing, so any “progress photo” of this address shows bare ground.
Ask for the current site photographsLocation — and why “300 metres to the station” is three stations added together
Not one distance on this page is mine. phoenizklcc.my — the only site carrying the developer’s legal footer — names no station and publishes no distance or walking time to anything at all. It names places only as scenery: KLCC and the Petronas Towers, KL Tower, Ibis KL City Centre, Scarletz Suites, The Mews KLCC, TREC KL, the Royal Selangor Club, Taman Tasik Titiwangsa, and the directions Ampang, Genting and Setiawangsa. Every figure below therefore comes from an agent site or a reviewer, and each is attributed.
The pin is on the locality, not on a surveyed lot, because no postcode and no title or PT number is published beyond “Lot 54, Seksyen 43”. Have the exact plot confirmed on a title plan at the gallery — particularly on this project, where the developer’s own site names two different streets and neither is the one in the contract filing.
Rail — the three-station problem, attributed
- MRT Ampang Park (Putrajaya Line) — 390 m. Source: saratan.my, stated as a straight-line figure measured from the plot for that page rather than quoted from marketing; kl.propertylau.com publishes the same figure. On the only measured evidence available this is the nearest station
- LRT KLCC (Kelana Jaya Line) — 600 m. Same two sources
- LRT Ampang Park (Kelana Jaya Line) — 605 m. Same two sources. MRT Ampang Park and LRT Ampang Park are two different stations at two different distances, 215 m apart on these figures
- MRT Raja Uda (Putrajaya Line) — 630 m. Same two sources
- MRT Persiaran KLCC — 865 m and LRT Damai — 995 m. Same two sources
- The trap, in three parts. thephoenizklcc.com prints “Ampang Park MRT & LRT 300m / 3 Min Walk”, treating the MRT and LRT stations as one place and undercutting the measured 390 m and 605 m by a wide margin. exsimklcc.com prints “450m walk to KLCC Ampang Park MRT Station & KLCC LRT Station”, treating three stations as one place and inventing a station name — there is no “KLCC Ampang Park MRT Station”. saratan.my notes that the 450 m figure does stand up as a walking distance against its own 390 m straight-line measurement — but that is one reviewer’s reconciliation, not a published source
- Transit claims with no distance: “KLCC 1 MRT stop” and “TRX 2 MRT stops” (thephoenizklcc.com); “walking distance to MRT station and bus stops” with no station named (kl.propertylau.com)
- No monorail station is named or measured by any source. Neither is the nearest bus stop — one source calls it “walking distance” and gives no figure
Retail, offices and landmarks — all from one measured source
- Avenue K — 570 m; Menara AmBank — 595 m; The Intermark — 605 m
- Suria KLCC — 830 m; Petronas Twin Towers — 840 m; KLCC Park — 960 m
- Pavilion Kuala Lumpur — 1.7 km; KL Tower — 1.8 km; Starhill Gallery — 1.9 km
- Royal Selangor Golf Club — 2.4 km; TRX / Exchange 106 — 2.4 km; Merdeka 118 — 3.0 km
- Prince Court Medical Centre — 1.8 km
- Every figure in this column is single-sourced to saratan.my and duplicated on kl.propertylau.com. They are straight-line distances the author measured for that page, not walking or driving routes, and not developer figures
- Named without any distance: Ibis KL City Centre (described as adjacent), Scarletz Suites, Royce Residence Hotel and Crowne Plaza (exsimklcc.com); “next to HUGOZ” (kl.propertylau.com)
- The only driving figure anywhere is a single unsourced “5 minutes’ drive to KLCC, Pavilion, TRX and Merdeka 118” (kl.propertylau.com). No source publishes a driving time in traffic
Places no source publishes a distance for
- Any school, international school, kindergarten or university — not one, anywhere
- Any hospital other than Prince Court Medical Centre — nothing for Gleneagles KL, HSC or Hospital Kuala Lumpur, despite HKL being a nearby MRT stop
- Any mosque, temple or place of worship
- Any supermarket or wet market — the only retail published is mall retail
- Any highway or expressway access point — nothing for Jalan Tun Razak, AKLEH, DUKE or the MEX
- KLIA, KLIA2, KL Sentral or any airport rail link
- No distance has been estimated on this page. Where none is published, none is given
Commercial title has a consequence the developer side does not address at all. saratan.my puts it this way: “The commercial title is the half that changes your monthly cost. Electricity, water, gas and indoor internet are billed at commercial tariffs rather than residential ones, and your local assessment is set at the commercial rate.” That is a reviewer’s statement, not a developer disclosure — no developer-side source addresses tariffs or assessment anywhere. As a general position, commercial-tariff electricity has no domestic lifeline block, commercial water tariffs are higher, and DBKL assessment on a commercial-title parcel is struck at the commercial rate. No source publishes the actual assessment rate or any indicative tariff for this building, so no figure is given here.
The register — the statutory filing for Phoeniz Suites, and why this table is empty
This block is normally the spine of these pages: the licensed developer, the licence number and its validity, the advertising and sale permit (APDL) and its expiry, the approving authority, the building-plan reference, the tenure, the restriction in interest, the chargee bank, the unit count, the completion date and the filed statutory unit selling price range — every one of them read off the developer’s own legally filed advertisement particulars. For Phoeniz Suites, not one of those fields could be obtained. The table below is kept in the statutory shape, with the Malay field labels, so that it can be completed from the statutory particulars board at the sales gallery or from a copy of the filed brochure. Every cell is a finding.
| Nama Skim / Projek | Pemaju | No. Lesen Pemaju | Tempoh Sah Lesen | No. Permit Iklan dan Jualan (APDL) | Tempoh Sah Permit | Pihak Berkuasa yang Meluluskan | No. Kelulusan Pelan Bangunan | Jenis Bangunan | Pegangan Tanah | Sekatan Kepentingan | Bebanan Tanah / chargee | Jumlah Unit | Bilangan Tingkat | Bilangan Tempat Letak Kereta | Tarikh Dijangka Siap | Harga Jualan Unit Minima – Maksima | Keluasan Lantai | Keluasan Tanah |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| NOT OBTAINABLE “Phoeniz Suites @ KL City Centre” is a marketing name. The registered scheme name is printed only on the filed brochure, which could not be located | NOT OBTAINABLE as a filed value Published elsewhere as EXSIM YKS 54 SDN BHD, registration number 1361275-W — the name corroborated four ways, the number single-sourced | NOT OBTAINABLE — and not published by any source | NOT OBTAINABLE | NOT OBTAINABLE — and not published by any source | NOT OBTAINABLE. No date exists on the record to check, so it cannot be determined whether a permit is current, has lapsed, or has not yet been issued, as at 5 October 2026 | NOT OBTAINABLE. DBKL is the local authority for this address — stated as geography, not as a filed value | NOT OBTAINABLE | NOT OBTAINABLE. The contract reporting describes the works as pangsapuri servis; that is a stock-exchange description, not a filed building type | NOT OBTAINABLE. Marketed as Hak Milik Kekal / freehold, on commercial land with housing accommodation sold under the HDA | NOT OBTAINABLE | NOT OBTAINABLE — and no chargee is named by any source. For a 53-storey tower under construction this is a material omission; ask which bank holds the charge and whether a redemption or disclaimer letter will issue | NOT OBTAINABLE. Marketed as 394, in 1 block. The contractor’s filing gives 394 serviced apartments + 1 strata office unit = 395 parcels | NOT OBTAINABLE. Marketed as 53, of which 45 residential per the Malay contract report. One agent funnel says 51 | NOT OBTAINABLE. Sources contradict each other: 174 bays, or none allocated to any suite, or a mechanical system from ground to Level 16 — see below | NOT OBTAINABLE. The developer’s own basis is “60 months after APDL obtained”, which is a period and not a date | NONE EXISTS. No filing means no statutory minimum and no statutory maximum. There is also no public government registry band for this scheme. No price figure is published on this page | NOT OBTAINABLE. Marketed schedule: 484 / 657 / 678 sq ft × 199 / 150 / 45 units, summing to 394 | NOT OBTAINABLE. Marketed as 0.56 acre |
Every cell above is either NOT OBTAINABLE or NONE EXISTS. That is not a shortcut — it is the result of fifteen separate retrieval routes, each listed below. On every other page in this series this table is full, and the contrast is the point.
A buyer’s single most useful next step on this project is the sales gallery. The statutory particulars board must by law be displayed there, and it is the most likely place to obtain the developer licence number and the advertising and sale permit number that none of the fifteen routes below could find. Read the permit expiry off the board yourself, photograph it, and keep the photograph.
The fifteen routes tried, and what each returned
1. HIMS serial-walk at hims.kpkt.gov.my/files/<serial>/<serial>-<n>/IKLAN_BROSUR_01.pdf — unusable, because the permit serial is the input to that path and no source publishes it. 2. HIMS brochures via the public search index, queried on “PHOENIZ”, “EXSIM YKS 54”, “Yap Kwan Seng” with “Seksyen 43”, and “1361275” — no hit on this scheme; the index returned other developers’ filings only. 3. The newer HIMS path form files/<code>/P45/P45-<YYYYMMDD>-<8 digits>/, used for 2025–2026 filings — unguessable by design, and no indexed hit. The method itself was proved to still work by retrieving an unrelated filing in full, so route 3 failing is about this scheme, not about the technique. 4. teduh.kpkt.gov.my project-swasta — returns an empty JavaScript shell with no data. 5. ehartanah.lphs.gov.my — the Selangor affordable-housing register; wrong state and wrong class for a Kuala Lumpur market-priced scheme. 6. An EXSIM corporate statutory-disclosure page, which exists for some Malaysian developers — EXSIM publishes none. 7. exsim.com.my’s own development directory — it carries 29 projects and no Phoeniz; the project’s direct URL on that domain returns 404, and so does its media API. 8. The EdgeProp project record — the route that produced a usable answer on a sibling scheme. edgeprop.my/condo/phoeniz-suites and /condo/phoeniz-suites-kl-city-centre both return 404, EdgeProp’s own site search returns 404 for “Phoeniz”, and its new-launch directory of over 3,000 records carries no Phoeniz entry. 9. EdgeProp’s report of the Aneka Jaringan contract award itself, fetched in full — it names the licensee and the 394-plus-one unit split, and prints no licence number and no permit number. 10. /apdl on the project microsite, a path that yields a full statutory block on some Malaysian microsites — phoenizklcc.my/apdl.html returns 404. 11. phoenizklcc.my/faq.html, read in full — it gives the developer’s name and registration number and neither statutory number. 12. The Property Genie project search — 404, no Phoeniz record. 13. Open web search for the licence and permit number strings — nothing. 14. The GreenRE project registry — no retrievable rows; the platform reports itself temporarily unavailable, so that check is inconclusive rather than negative. 15. The GBI gallery and directory — no entry for Phoeniz, EXSIM YKS 54, Hugoz, Scarletz, Ceylonz or Yap Kwan Seng; a direct Phoeniz directory URL returns 404.
The car park — the most material unresolved point of fact on this project
Four sources, four positions, and for a KLCC-fringe product the difference between them changes what you are buying. phoenizklcc.my/faq.html, the site carrying the developer’s legal footer, says “174 bays plus OKU and P-Hailing lots” and describes “Smart Mechanical Parking”. saratan.my says, twice and in terms, “no suite comes with a bay of any kind” and “no suite at Phoeniz comes with parking of any kind”, and its author states that this was confirmed with the developer and appears on none of the other sources. kl.propertylau.com describes a mechanical parking system from ground to Level 16. The contractor’s own Bursa scope includes mechanical car parking and motorcycle parking. exsimklcc.com leaves car parking unspecified. The two headline positions are reconcilable in exactly one way: the building contains a mechanical car park of roughly 174 bays, but no bay is allocated to or sold with any suite — a structure that is common in KL serviced-suite towers and would make both statements true at once. That reconciliation is my inference, not a published fact, and no source publishes a per-unit allocation. So this is the question to put in writing: is a car park bay allocated to my unit, is it numbered, is it titled or licensed, is it transferable with the unit, and on what terms? Get the answer into the sale and purchase agreement rather than into a brochure. Also not published by anyone: the total bay count as a filed figure, the motorcycle bay count, visitor bays, and whether any EV charging is provided.
The 394 + 1 split, and what non-HDA actually means for you
The 394 serviced apartments are housing accommodation. They are sold under the Housing Development (Control and Licensing) Act 1966, which means a statutory Schedule H sale and purchase agreement in a form the developer cannot rewrite, statutory liquidated damages payable automatically if vacant possession is late, and a ring-fenced housing development account into which your progress payments must go and out of which only permitted project costs may be drawn. saratan.my and kl.propertylau.com both state the HDA framework for this project explicitly. The single strata office unit at Level 3A is not housing accommodation: no Schedule H, so the contract is whatever the developer drafts; no HDA liquidated damages, so late delivery is governed only by whatever that contract says; and no housing development account, so your money is not ring-fenced by statute. It also sits on commercial title outright. One parcel out of 395 is a small share of the building, and if you are buying one of the 394 it does not affect your own protection — but no consumer-facing source tells you the parcel exists, and the arithmetic shows the omission is deliberate: the published layout schedule of 199 + 150 + 45 sums to exactly 394. Whether that parcel is being sold, retained by the developer, or used as the management or operator office is not published by anyone, so ask.
Foreign buyers — Kuala Lumpur, and why this page cannot tell you if you qualify
Phoeniz Suites is in Wilayah Persekutuan Kuala Lumpur, so the threshold that applies is the Federal Territory minimum of RM1,000,000 per unit, together with consent from the Economic Planning Unit where it is required for the acquisition. Selangor’s thresholds do not apply here — for completeness, those are RM2,000,000 in Zone 1 and Zone 2 for strata and gated landed strata only, and RM1,000,000 in Zone 3, meaning Hulu Selangor and Sabak Bernam. On every other page in this series the next sentence compares the filed statutory minimum against that threshold and tells you whether the cheapest filed units are open to a foreign buyer. Here that comparison is impossible, because there is no filed statutory minimum and no public registry band to compare. The title is also commercial, with housing accommodation sold under the HDA on top of it — a structure a foreign buyer’s solicitor should look at specifically, since the threshold and the consent requirement attach to the parcel actually being acquired. If you are buying as a foreign purchaser, get the purchase price and the parcel description in writing and have them checked against the current Federal Territory threshold and the current EPU guidelines before you pay a booking fee.
Build-out status, and what “site clearing” means for a buyer
As at Q3 2026 both exsimklcc.com and saratan.my put the site at clearing stage. The substructure contract — earthworks, piling, pile caps, retaining walls and the mechanical car park structure — was awarded on 22 September 2026, accepted on 23 September, and runs from 15 September 2026 to 14 August 2028. That is the foundation package alone: the 53-storey superstructure, the façade, the fit-out, testing and setting to work and the certificate of completion and compliance all come after it. No percentage of completion exists to publish, and no source publishes a construction programme beyond the substructure dates. Against that, the completion years published by agent sites and reviewers — 2029, Q4 2029, “before 2030” — look tight on the contractor’s own timetable, and none of them is a filed date.
What this page does not publish, and why
This page deliberately withholds several categories of figure that other pages about Phoeniz Suites do publish, and the reasons are specific. Every price figure. Four sources publish an identical per-type entry-price set and a fifth publishes figures differing from it by a few hundred ringgit on two of the three types — the same nominal list, inconsistently transcribed. Because there is no filed statutory minimum and no government registry band for this scheme, no marketing price figure on this project can be validated against a statutory floor at all, which is precisely the check that makes a price safe to republish. So none is republished. All “nett price” language. The rental programme on phoenizklcc.my/invest.html is quoted as a return on a nett price that is distinct from the gross asking price the same site advertises. A gross-to-nett differential is a rebate by another name, and both the differential and anything quoted on it fall inside my absolute rule: never published, in any form, on any page. Every rate, percentage, yield and projection attached to the rental programme, including the minimum return, the guaranteed return, the revenue-share split, the cap on how many units the guaranteed option is available for, and the per-type return projections the developer-side site publishes. The programme’s structure and its named operator are described in the developer section, because a buyer needs to understand the mechanism; the numbers are not. And the furnishing or inclusions package one agent site publishes, which is an incentive. I do not publish a discount, a rebate, a nett price, a promotional package, a freebie, an incentive, a commission figure, a Bumiputera discount percentage, a guaranteed-rental or leaseback rate, or a yield or return projection — not on this page and not on any page. Ask me directly and I will tell you what is current, with the developer’s own document behind it.
The developer — which company you are actually buying from, and what it has not published
The licensed developer of Phoeniz Suites @ KL City Centre is EXSIM YKS 54 SDN BHD. The name is corroborated four ways: EdgeProp’s report of the Aneka Jaringan contract award, The Edge Malaysia, Business Today and the Bernama/Newswav Malay report all name it as the employer for the 53-storey, 394-unit works at Lot 54, Jalan Yap Kwan Seng. And the company name itself is evidence about the plot: “YKS 54” reads as Lot 54, Jalan Yap Kwan Seng, which matches the address in the contract announcement exactly. That is the company whose name will be on your sale and purchase agreement.
The registration number is a different matter. 1361275-W is published on exactly one website — phoenizklcc.my, in its footer and on its FAQ page — and could not be corroborated against a filing, an SSM record, a Bursa announcement or any press report. So the name is quadruple-sourced and the number is single-sourced, and this page labels it that way everywhere it appears rather than printing it flatly. The registered office address of the licensee is not published by anyone.
Every portal, agent site and funnel page names the developer simply as “EXSIM” or “EXSIM Group”. That is a brand, not the contracting party. This group licenses each project to a separate special-purpose company, and the pattern was verified from this project’s own evidence rather than assumed from a sibling: Phoeniz sits in EXSIM YKS 54 Sdn Bhd, while the adjacent Hugoz Suites sits in Armada Istimewa Sdn Bhd (1085375-U), Branniganz in Lembaran Beruntung Sdn Bhd (642030-X) and the Kwasa Damansara schemes in EXSIM MX4 Sdn Bhd (1486857-W). These are four different companies. EXSIM Group, EXSIM Development Sdn Bhd and EXSIM Hospitality Berhad are not parties to a Phoeniz sale and give no covenant: a buyer’s recourse runs against the single-project company only. That is normal market practice and not a criticism; it is simply worth knowing before contract stage rather than after.
There is no page for this project on the developer’s own corporate website. exsim.com.my’s development directory carries 29 projects — D’Ivo, 22 Macalisterz, Fiddlewoodz, Rosewoodz, Mossaz, The Arcuz, Scarletz Suites, Millerz Square, Ceylonz Suites, D’Nuri, Nidoz, the Nouvelle industrial series and others — and no Phoeniz Suites. The project’s direct URL on that domain returns 404, and the site’s media API returns 404 as well. Every Phoeniz page online sits on a satellite domain: a static hand-built microsite, a Wix agent site, a GoHighLevel funnel, two reviewer pages. And no PropertyGuru or iProperty project page exists for Phoeniz Suites either, although every KLCC sibling has one — Hugoz Suites, Hanaz Suites, Branniganz Suites and Ceylonz Suites all carry portal project records. The consequence is worth stating plainly: almost nothing about this project is independently corroborated. Outside the contractor’s stock-exchange filing, the whole published picture rests on sites the developer or its agents control.
“Hugoz 2” is not this project’s name and points buyers at a different building. Three sources and one hostname brand Phoeniz as “Hugoz 2”, borrowing the name of the group’s adjacent and sold-out Hugoz Suites; the developer’s own footer never uses it. Hugoz is a separately licensed scheme under a different licensee, with its own permit, its own filed particulars and its own completion history — and unlike Phoeniz, a filed advertisement brochure for it does exist and is published on this site. A buyer who searches “Hugoz 2” and reads Hugoz’s track record is reading the wrong building’s record. Both pages are linked at the foot of this one so the difference is visible side by side.
The awards and the quality score in the developer’s credentials block belong to other projects. phoenizklcc.my lists, as developer credentials, “Established 2008; 20+ green projects; FIABCI World Prix d’Excellence winner.” Per The Edge Malaysia’s report of the FIABCI 2026 awards, the 2026 World Silver awards went to Millerz Square @ Old Klang Road in Mixed-Use Development and The Arcuz @ Kelana Jaya in Residential High Rise, both at the June 2026 Vienna ceremony, and both are credited with a QLASSIC score of 86%. Those are real achievements by this group, on those two buildings. Phoeniz Suites itself holds no award and can hold no QLASSIC score, because QLASSIC is a post-completion workmanship assessment and Phoeniz was at site-clearing stage in Q3 2026. “20+ green projects” is likewise a group-level count.
The green claim is a logo-level claim. phoenizklcc.my calls Phoeniz a “GreenRE-accredited green building”, on its home page and in its FAQ. No other source — not exsimklcc.com, not thephoenizklcc.com, not saratan.my, not kl.propertylau.com, not realty.ericanfly.com — mentions any green certification at all. “Accredited” is not a GreenRE term: GreenRE awards Bronze, Silver, Gold or Platinum, and awards them provisionally at design stage and finally on completion. For Phoeniz there is no rating level, no certificate number, no certification date and no retrievable registry entry. The GreenRE project list returned no rows to a non-JavaScript fetch and the site itself states that its online project management platform is temporarily unavailable — so that registry check is inconclusive, not a negative finding, and this page says so rather than claiming the certificate does not exist. The Green Building Index, a different scheme, has no entry for Phoeniz, EXSIM YKS 54, Hugoz, Scarletz, Ceylonz or Yap Kwan Seng, and a direct GBI directory URL returns 404 — so GBI is not the scheme in play. The honest formulation, and the only one this page uses, is: the developer states the project is GreenRE-accredited; no rating level, certificate number or registry entry is published, and the project is at site-clearing stage.
The rental programme — its structure, its operator, and none of its numbers. A short-stay rental programme does exist and is published by the developer-side site. Its shape is this. Two alternative options are offered to buyers rather than one. Option 1 is a floor-or-share structure: a stated minimum rental return or an owner/operator revenue share, whichever is higher, for an initial term, followed by a second term on the revenue share alone; the published term shape is three years plus two years. Option 2 is a guaranteed rental return for the initial term followed by the same second term on the revenue share, and it is capped to a limited number of units on a first-come basis — so it is not available to every buyer, and that scarcity is itself a selling device. Under the revenue-share limb the owner’s share is stated to be net of operating costs, which means the owner carries the operating-cost risk; the operator’s listed duties are OTA and short-stay listing and marketing, professional photography, 24/7 guest service, housekeeping, maintenance, digital marketing and monthly reporting. The named operator is Mana Mana Hospitality — legal entity Mana Mana Holdings Sdn. Bhd., 202401029298 (1575146-T) per manamana.my, described there as a member of the EXSIM Hospitality Berhad family, Bursa Malaysia stock code 1287. Phoeniz is listed on the operator’s own site as an upcoming property, and the operator states a portfolio of 30-plus properties across 10 states including Ceylonz Suites, Scarletz Suites and Mossaz. No hotel brand and no third-party hotel operator is named by any source.
Two things about that programme matter more than any number in it. First, the returns are not rental income from a tenancy: they derive from short-stay and OTA operation, which is demand-cyclical and subject to DBKL rules and to the building’s own management rules on short-term letting in strata buildings. No source publishes whether this building’s deed of mutual covenants, by-laws or management corporation will permit short-stay letting after handover — and that single question decides whether the programme can operate at all. Second, every rate, percentage, split, cap and projection attached to it is withheld from this page under my absolute rule, because the programme is quoted as a return on a price basis that is not the advertised price. The reasons are set out in full in the register section above. Also not published by anyone: the operator agreement’s term, exit, termination and renewal mechanics; what happens to the programme if the operator ceases to act; whether owners outside the programme may let independently and on what terms; and who appoints the first management agent and for how long.
Nothing in this section is a judgement about the developer’s competence or its finished buildings. Millerz Square and The Arcuz are award-winning projects and the group has delivered repeatedly in Kuala Lumpur. The points above are differences between published documents, and absences in the public record, for this scheme.
Questions buyers actually ask about Phoeniz Suites
Does Phoeniz Suites have a valid advertising and sale permit (APDL)?
Who is the licensed developer — is it EXSIM?
How many units are there — and is there really an office unit in the building?
What does it mean that one unit is not under the HDA?
Does my suite come with a car park bay?
Where exactly is the project — Jalan Yap Kwan Seng or Jalan Tun Razak?
Is Phoeniz Suites the same thing as “Hugoz 2”?
What is the nearest train station, really?
Is this a low-density development?
How many storeys is it — 53 or 51?
When will it be completed?
Is the project GreenRE certified?
Has Phoeniz Suites won any awards?
How much are the maintenance charges?
Is Type A a one-bedroom or a two-bedroom?
Are the dual-key units really dual key?
Can a foreigner buy at Phoeniz Suites?
Is there a rental or leaseback programme, and what will it pay?
Why does this page publish no price at all?
What should I ask for before paying a booking fee?
Before you pay a booking fee on Phoeniz Suites, get three things in writing
The advertising and sale permit number and its expiry, photographed off the statutory particulars board at the gallery. Whether a car park bay is allocated to your unit, and on what terms. And the vacant possession date that will actually be in your sale and purchase agreement, rather than “60 months after APDL”. I will ask the developer for all three and send you what comes back, including if the answer is one you would rather not hear.
No price list, no quotation, no offer. This page publishes no price figure for Phoeniz Suites at all, and the reason is given in full under “what this page does not publish, and why” in the register section above.
Louis Koh
Director, LK Group Marketing · IQI Realty Sdn Bhd · Registered Estate Agency
I build these pages from the legally filed advertisement particulars rather than from a brochure, because the filing is the document that binds. On Phoeniz Suites that method produced an uncomfortable result: there is no filing to be found, and no source anywhere publishes a developer licence number or an advertising and sale permit number — so nobody outside the developer can even say whether a permit exists. The developer’s own site dates completion from a permit it describes in the future tense while pricing units on the same page. I would rather put that on the first screen than let you find it at contract stage. Everything here is attributed to a named published source, and where no source publishes a thing I have written that instead of filling the gap. If any figure on this page matters to your decision, ask me for the document it came from.
Published: 5 October 2026 · Last verified: 5 October 2026. No filed advertisement particulars exist for this scheme on the public record, and no developer licence number or advertising and sale permit number is published by any source — fifteen retrieval routes are listed in the register section above, each with what it returned. Every figure on this page is attributed to the source that published it, and nothing is estimated. Marketing information, not an offer. Verify every figure against the developer’s own stamped documents before you commit.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: EXSIM Group (19 developments on this site)
Where it is: KLCC, Kuala Lumpur (KL)






