Pavilion Square Kuala Lumpur
Sixty-seven storeys and 960 residences across the road from Pavilion KL — with a link bridge into the mall landing on the Level 12 garden deck.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation



Pavilion Square Kuala Lumpur at a glance
Every figure below comes from the developer's own published material. Where the developer hasn't published something, it isn't on this page.
- Development
- Pavilion Square Kuala LumpurArmani Hartajaya Sdn Bhd (1163945-U), Pavilion Group
- Tenure
- LeaseholdRemaining term not published by the developer
- Residential tower
- 67 storeys, 960 unitsSeparate 25-storey corporate tower on the same site
- Sizes
- 504–1,272 sq ftEight layouts: A, B1, B2, C1, C2, C3, C4, D
- Facilities
- Over 70,000 sq ftLevels 1, 12, 63A, 66 and 67
- Construction
- Topped out May 2026Main contractor China State Construction Engineering Corp Malaysia
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Six things that decide whether Pavilion Square works for you
The address does most of the selling here, so this page spends its time on the things the address does not tell you: the tenure, the developer’s real identity, and the numbers that have moved since the scheme was approved.
Leasehold, and the developer will not tell you the term
The parcel is leasehold. That is well established — the land was held on a long lease from City Hall before being bought outright in April 2017, and reporting at the time deliberately contrasted it with a neighbouring freehold lot. What is not published anywhere official is the remaining term. Agent sites repeat “99 years to 2122”, which would imply a fresh title issued around 2023, but no developer document says so. On a purchase of this size the lease expiry year belongs on the first page of your paperwork, not in a footnote — ask for it in writing and have your solicitor confirm it against the title.
It has topped out — which is a real advantage over paper
The main contractor, China State Construction Engineering Corp Malaysia, announced the topping out in May 2026. Piling and basement work by Econpile started back in August 2021 under a RM64.25 million package. So this is not a rendering with a signboard: the structure exists, and a large listed contractor has publicly attached its name to it. Against every risk listed further down this page, weigh that. A topped-out tower has already cleared the stage where most off-plan projects fail.
The scheme has changed since approval — three storey counts are in circulation
The scheme recorded at approval stage was a 61-storey serviced apartment block of 980 units over an eight-storey podium, alongside the 25-storey office tower. The main contractor’s own announcement describes a 68-storey residential tower of 270.35 metres. Current marketing says 67 storeys and 960 units. An earlier approved version also included a 200-room hotel, which no longer appears in any marketing material. None of that is sinister — big city schemes get revised — but it does mean the brochure is not the approved plan. Ask which revision your sale and purchase agreement is drawn against.
The link bridge lands on the residents’ Level 12 deck
The developer’s facilities plan lists “access to link-bridge” as the first item on Level 12, the Courtyard Garden deck. That is a genuinely unusual amenity: a covered, private-side route into one of Southeast Asia’s better-known malls, from a residential floor rather than through a public lobby. What I have not been able to verify is the approval status of the bridge with the authorities and the road owner. It appears in the developer’s own material, which is the strongest evidence available, but a bridge over a public road is a permission, not a decision the developer makes alone. Ask for the approval reference.
Foreign buyers: RM1 million floor, state consent, and 8% stamp duty
Kuala Lumpur sets a RM1,000,000 minimum purchase price for a non-citizen, measured on the sale and purchase price. A transfer then needs written consent under section 433B of the National Land Code, given in the Federal Territory by the Kuala Lumpur Land Working Committee. And since 1 January 2026 a flat 8% stamp duty applies to non-citizens buying residential property — the Finance Act 2025 wrote a definition into the Stamp Act that expressly names service apartments, so there is no argument to be had about whether this stock is caught. On a RM1.5 million unit that is RM120,000 on the transfer instrument alone.
You are buying into a soft market, and that cuts both ways
In the first quarter of 2026, NAPIC recorded 4,181 completed unsold serviced apartments in Kuala Lumpur and 3,733 unsold residential units, and Kuala Lumpur posted the largest single-quarter jump in residential overhang of any state that quarter. That is the competition your resale or your tenant search will face. The other side of it: soft markets are when developers negotiate, and a topped-out tower from a group with this balance sheet is a very different proposition from an unbuilt one in the same statistics. Just do not model your exit on a rising market, because the current data does not describe one.
The whole development, decoded
This page covers the residential tower only. The 106 strata offices in the 25-storey block next to it are a different product with different ownership rules, and they have their own page — the link is at the bottom.
Pick your tower

Residential Tower
The taller of the two towers, carrying all 960 residences from 504 to 1,272 sq ft across eight layout codes. Its own grand lobby and drop-off, separate from the corporate entrance, and four facilities floors — the podium garden at Level 12 and three sky floors stacked at the top.

Corporate Tower
The second tower on the same site holds 106 strata offices from 1,093 to 2,464 sq ft. It has its own double-volume lobby, its own drop-off and destination-control lifts. It is included here so you can see the whole site, but the ownership rules for commercial strata are materially different — that product has its own page.
Facilities, level by level
This schedule is the developer’s own, floor by floor. It is the most detailed thing Pavilion Square publishes, and it is worth noticing what it implies: the 118-metre pool is on Level 67, not on the 63rd floor as some write-ups state, and Sky Wellness is on Level 63A. What the developer does not publish is a service charge per square foot — four facilities floors and a 118-metre pool are not cheap to run, and that cost lands on you monthly for as long as you own the unit.
Courtyard Garden
- Access to link-bridge into Pavilion KL
- Water feature and plaza
- Serene trail and promenade walkway
- Garden terrace and yoga deck
- Seating courtyard and The Retreat
- Club lounge and outdoor lounge
- Multi-purpose hall and pre-function room
- Entertainment room, karaoke and mahjong rooms
- Pool table, snooker and foosball
- BBQ deck
- Indoor kids room and playground
- Laundromat
- Surau
Sky Wellness
- Cardio and strength gym
- Functional training gym
- Outdoor gymnasium
- Outdoor yoga deck
- Sports lounge and outdoor lounge
- Sauna and steam room
- Lockers and changing rooms
Sky Garden
- Co-working lounge
- Indoor lounge
- Reading court
- Sunken plaza and viewing deck
- Sky plaza
- Spiral staircase to the pool deck
Sky Pool
- 118-metre infinity pool
- Kids pool
- Wading pool and jacuzzi
- Pool deck and sun loungers
- Outdoor shower
Arrival level
- Residential grand lobby and concierge
- Waiting lounge
- Mail and collection rooms
- Management office
- Security room
- Retail
Where the project is now
All 8 Pavilion Square Kuala Lumpur floor plans
These eight layout codes are the developer’s own. The drawings and the per-type areas are not published — the developer renders its layouts inside a scripted viewer with no dimensions, and the sizes circulating on agency sites cannot be tied to a revision. Rather than reproduce an unverified drawing, I request the current stamped plan and size schedule for the type you want. Tap a layout and that request goes to my WhatsApp.
Type A
Get this floor planType B1
Get this floor planType B2
Get this floor planType C1
Get this floor planType C2
Get this floor planType C3
Get this floor planType C4
Get this floor planType D
Get this floor planInside Pavilion Square Kuala Lumpur







Where Pavilion Square Kuala Lumpur sits
Jalan Raja Chulan, Bukit Bintang, Kuala Lumpur — the former Chulan Square eateries strip, on the junction where Jalan Raja Chulan meets Jalan Bukit Bintang and Jalan Imbi, directly across the road from Pavilion Kuala Lumpur. Sales gallery: Pavilion Square Property Gallery, Level 3, Menara Khuan Choo, 75A Jalan Raja Chulan, 50200 Kuala Lumpur.
Two honest caveats on this pin. First, the developer publishes a map link for its sales gallery at Menara Khuan Choo, which is roughly 400 metres away and is not the site — several agent pages reprint the gallery address as the project address. Second, no surveyed coordinate for the parcel itself is public, so the pin above is a best-available position for the former Chulan Square strip, accurate to about a hundred metres. The legal description recorded in a contractor’s stock-exchange filing is Lot 297 and Lot 20016, Seksyen 63, Jalan Raja Chulan — quote that, not a pin, if you need certainty. Postcode is also inconsistent across sources: the Jalan Raja Chulan frontage is recorded as 50200 and the Bukit Bintang side as 55100.
- Pavilion Kuala LumpurAcross the roadlink bridge from Level 12
- Tun Razak Exchange (TRX)About 900 mportal figure, not developer-published
- KLCC and Suria KLCCAbout 1.3 kmportal figure, not developer-published
- MRT Bukit Bintang and MRT ConlayImmediate catchmentdeveloper names them, publishes no distance
- Monorail Raja Chulan and ImbiImmediate catchmentdeveloper names them, publishes no distance
- Prince Court Medical CentreAbout 1.1 kmportal figure
Registered as Dataran Pavilion — with the marketing name in brackets
| Project code | Registered name | Licensed developer | Advertising permit | Permit expires | Units | Bed / bath | Price band on the permit | Built | Status |
|---|---|---|---|---|---|---|---|---|---|
| 30633-1 | Dataran Pavilion (Pavilion Square) | Armani Hartajaya Sdn Bhd (30633) | 30633-1/08-2027/0740(A)-(S) | 15 Aug 2027 | 960 | 1–3 / 1–3 | RM1,319,000 – RM5,774,150 | 25.42% | Lancar |
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 27 August 2026. Pull it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=30633-1
Three fields agree
The licensed company on this page is Armani Hartajaya Sdn Bhd, which holds this licence. The register’s coordinate is 124 metres from the location this site had verified. And 960 units is exactly the figure at the top of this page. The register also happens to carry the marketing name in brackets, which is helpful and not the norm.
The permitted band, and what it settles
RM1,319,000 to RM5,774,150 is the legal boundary the developer may sell within, not an asking price. A quote above the top of that band is a question, not a negotiation.
Kuala Lumpur’s minimum for a non-citizen buyer is RM1,000,000. The entire permitted band sits above it — so on price, every unit here is available to a foreign buyer. Note that the separate corporate-suite component on commercial title carries different rules; those are on the corporate suites page.
25.42% built
The percentage is the developer’s own progress return under the statutory 7(f) report. Note today’s reading and re-check before every progress payment your bank releases. If it does not move between two payments, that is a question worth putting in writing — and the answer sits on a public government website, not in a sales gallery.
Status vocabulary is fixed: Belum Mula, Lancar, Lewat, Sakit, Siap Dengan CCC / CFO, Permit Telah Dibatalkan. This entry sits in Lancar — no adverse flag.
About Armani Hartajaya Sdn Bhd (Pavilion Group)
The developer of record is Armani Hartajaya Sdn Bhd, registration number 201501038624 (1163945-U), incorporated on 28 October 2015 with a stated business of property development and property investment. That name appears in the disclaimer, personal data notice and terms on the developer’s own website, and it is the employer named in the contractor’s stock-exchange filing for the piling package. Marketing is handled under the 1Pavilion Collection banner and the client is described throughout as the Pavilion Group.
This is not a Malton Berhad project. Malton, the Bursa-listed developer behind Pavilion Bukit Jalil, is frequently credited with Pavilion Square in agent material and search summaries. Its FY2025 annual report does not mention Pavilion Square, Armani Hartajaya, Chulan Square or Lot 297 anywhere, and the project does not appear in Malton’s own current, future or completed portfolio. The only Malton connection is a shared registered-office address at Pavilion Tower on Jalan Raja Chulan.
Nor is it connected to “Armani Group”, an unrelated Ipoh-based developer behind Armani Hallson KLCC and a separate Armani Hallson tower in Bukit Bintang. Two different companies, similar first word, both building in the same district at the same time. If you are shown piling or contract news for an “Armani” tower, check which one it belongs to before you read anything into it.
A word on the websites. There are at least eleven marketing microsites for this project, several of which describe themselves as the official site. The developer’s own site is the one whose legal notices are executed in the name of Armani Hartajaya Sdn Bhd. One prominent site carrying a Malaysian domain is operated by a separate agency company entirely. Check the footer before you treat anything as developer-published — I did, and it changed which facts made it onto this page.
Frequently asked questions
Who is actually developing Pavilion Square — is it Malton Berhad?
No. The developer is Armani Hartajaya Sdn Bhd, registration number 201501038624 (1163945-U), for the Pavilion Group. That company is named in the legal notices on the developer’s own website and is the employer named in the contractor’s stock-exchange announcement for the piling package.
Malton Berhad, the listed developer behind Pavilion Bukit Jalil, is widely and wrongly credited with this project. Its FY2025 annual report contains no reference to Pavilion Square, Armani Hartajaya, Chulan Square or Lot 297, and the project appears nowhere in Malton’s own project lists. The two share a registered-office address at Pavilion Tower, which is probably where the confusion started.
Why this matters to you: if you were relying on a Bursa-listed parent’s published accounts to assess counterparty risk, that comfort does not exist here in the way you thought. Armani Hartajaya is a private company, so its accounts are not on the exchange. Ask your solicitor to run a company search before you release any deposit.
Is Pavilion Square freehold or leasehold, and how many years are left?
Leasehold. The parcel was held on a long lease from City Hall before being acquired outright in April 2017, and contemporaneous reporting on the transaction distinguished it specifically from a neighbouring freehold lot. Some agent pages and search summaries say freehold; on the evidence available they are wrong, and the likeliest source of the error is bleed-over from the freehold Pavilion Suites nearby.
The remaining term is not published by the developer. Agent sites repeat “99 years until 2122”. If accurate that implies a fresh 99-year title issued around 2023, which would be unusually strong for a leasehold in this district. But no developer document states it, so I am not putting that year on this page as a fact.
Get the lease expiry from the title, in writing, before you sign. It is not a detail: banks tighten lending as a lease runs down, and the remaining term at the point you eventually sell is a direct input into your buyer’s financing. Your solicitor can obtain a land search on Lot 297 in a day.
Can foreigners and Singaporeans buy at Pavilion Square?
Yes, subject to a price floor, a consent and a tax. Kuala Lumpur applies a minimum purchase price of RM1,000,000 to a non-citizen buying residential property, measured on the sale and purchase price. The definition of foreign interests in the Ministry of Economy’s guideline includes Malaysian permanent residents, so a PR is caught by the same floor. Given the size band here, most of the stock should clear RM1 million comfortably, but confirm it on the actual unit rather than assuming.
The consent is the second gate. A transfer to a non-citizen requires written state consent under section 433B of the National Land Code. In the Federal Territory that consent comes from the Kuala Lumpur Land Working Committee and is applied for through the Federal Territory Land and Mines Office after the sale and purchase agreement is signed. A dealing completed without it is void, so build the timing into your schedule.
Then the tax. Since 1 January 2026 a flat 8% stamp duty applies to a non-citizen individual or foreign company acquiring residential property, with no first-home relief. The Finance Act 2025 added a definition of residential property to the Stamp Act that expressly includes service apartments, so this stock is squarely within it. On a RM1.5 million unit that is RM120,000, payable in cash on transfer and not financeable under most loan packages.
Also note that a foreign buyer disposing later pays real property gains tax at 30% within the first five years and 10% from the sixth year onward. There is no zero band for non-citizens, ever. Tell me your nationality and the unit you are looking at and I will lay the full cost line out for you.
Is the link bridge into Pavilion KL confirmed?
It is on the developer’s own facilities plan, which is the strongest evidence available — but I could not find an approval reference for it. The plan lists “access to link-bridge” as item one on Level 12, the Courtyard Garden deck, and the bridge is marketed to both towers on the site.
Here is the honest gap. A pedestrian bridge over a public road needs permission from the local authority and cooperation from the building it lands in. The developer’s material shows the bridge; it does not show a stamped approval, and I have not been able to source one. Marketing plans are not permissions.
This one is worth pressing on, because the bridge is doing a lot of work in the pricing of this project — a covered private route into the mall is most of what separates this address from any other tower within walking distance. Ask for the approval reference and ask what happens contractually if the bridge is not delivered. If the answer is that nothing happens, price the unit as though there were no bridge.
How many storeys and units is it really — I have seen 61, 67 and 68?
Current marketing says 67 storeys and 960 units, and that is what this page uses. The other figures are not errors so much as different snapshots of a scheme that has been revised.
The version recorded at approval stage was a 61-storey serviced apartment block of 980 units sitting on an eight-storey podium, next to the 25-storey office tower. The main contractor’s own November 2024 announcement describes a 68-storey residential tower of 270.35 metres and a 26-storey office building of 126.60 metres, with roughly 240,000 square metres of total floor area. An earlier approved scheme also carried a 200-room hotel that has since disappeared from all marketing.
So: 61 is the older approved scheme, 68 is the contractor counting differently or describing a later revision, 67 is what is being sold today. Storey counts commonly differ by one depending on whether a mechanical floor is included, and the podium may or may not be counted. None of this should worry you by itself — but it is a good reason to ask which drawing revision your sale and purchase agreement annexes, and to read the annexed floor plate rather than the brochure.
Why are the floor plans on this page blank?
Because the developer does not publish downloadable ones, and I will not host somebody else’s. The developer’s site renders its layout drawings inside a scripted tab component with no image files exposed, and it publishes no dimensions alongside them.
Copies do circulate on agency websites. I have deliberately not reproduced those, for two reasons: I cannot verify that an agency-hosted drawing matches the current revision, and a floor plan with the wrong revision number is worse than no floor plan at all when you are deciding where a wall goes.
What is officially published is the layout code set — A, B1, B2, C1, C2, C3, C4 and D — and the overall size band of 504 to 1,272 sq ft. The per-type sizes and the bathroom counts are not developer-published. I request the current stamped floor plans and the size schedule direct from the developer for the layout you are interested in. Message me with the type code and I will send what they issue.
What is the price, the maintenance fee and the completion date?
The developer publishes none of the three, and the figures circulating are not consistent enough to quote.
On price, one September 2024 write-up gave an indicative figure around RM1.32 million, agent sites talk about roughly RM2,000 to RM2,400 per square foot at launch, and resale portals currently show asking prices spanning RM1,133 to RM3,705 per square foot — but those last ones are individual agents’ asking prices, not a developer price list, and a range that wide tells you nothing.
On maintenance, nothing at all has been published. That is the omission I would push hardest on. This building has four facilities floors, a 118-metre pool at Level 67 and high-rise lift banks; the service charge is going to be a meaningful monthly number and it is the single figure most likely to surprise an investor calculating a yield.
On completion, the developer states no date. Portals variously show July 2027, 2028, 2028 to 2029 and the third quarter of 2029. Since the tower topped out in May 2026, the earlier of those is at least physically plausible, but plausible is not the same as contractual — what binds is the vacant possession date written into your sale and purchase agreement. I get the current price list, the service charge estimate and the S&P delivery date direct from the developer. Message me and I will send you today’s actual figures.
Several websites call themselves the official Pavilion Square site. Which one is?
The one whose legal notices are executed in the name of Armani Hartajaya Sdn Bhd. I counted at least eleven marketing microsites for this project, several of which describe themselves as official and several of which carry Malaysian domains that look authoritative.
One prominent example is operated by a completely separate agency holding company, named in its own footer. Another is run by a licensed negotiator at a large agency, to their credit with a banner at the top of the page saying so plainly. Others make no disclosure at all.
The practical test takes ten seconds: scroll to the footer and read whose company name and registration number the disclaimer, privacy notice and terms are issued under. If it is not the developer, treat everything on the page — prices, sizes, completion dates, tenure — as a claim rather than a fact. That is not a criticism of agents; I am one. It is just that a marketing page and a developer disclosure carry different weight, and on this project the difference has produced genuinely contradictory information about tenure and unit counts.
Is this a good rental investment?
The address is about as strong as Kuala Lumpur gets for a tenant who wants to walk to work and to a mall. The market context is the part people skip.
In the first quarter of 2026 NAPIC recorded 4,181 completed unsold serviced apartments in Kuala Lumpur and 3,733 unsold residential units, and Kuala Lumpur registered the largest single-quarter increase in residential overhang of any state. Bukit Bintang and the surrounding Golden Triangle already carry a large stock of small serviced units chasing the same expatriate, corporate-let and short-stay demand.
What differentiates this building on the letting side is real: a mall link, four facilities floors, larger average unit sizes than the small-format towers nearby, and — importantly — only 960 units competing internally rather than several thousand. What works against it is that you will be letting into a market with visible surplus, and that your service charge is an unknown you cannot yet model.
My advice is to underwrite it on a conservative rent and a realistic void allowance, and to treat the service charge as the swing factor until the developer publishes it. If the deal only works at full occupancy and a top-of-market rent, it is not a deal.
Should I buy in the residential tower or the corporate suites?
They are not two versions of the same thing — they are two different asset classes on one plot, and the deciding question is who is buying.
Buy the residence if you are an individual, if you want the facilities, if you may live in it yourself, and if you want the deepest resale pool. Serviced residences resell to individuals, which is by far the largest buyer group. The cost of that is the 8% non-citizen stamp duty if you are foreign, and a service charge that pays for four facilities floors you may or may not use.
Buy a corporate suite if the buyer is a business. The commercial title changes almost everything: for foreign interests the unit must be held through a Malaysia-incorporated company rather than personally, the 8% residential stamp duty does not apply, bank margins are typically lower, and assessment and utilities are charged at commercial rather than domestic rates. There are only 106 of them against 960 residences, which cuts both ways — scarcer, but a thinner resale market.
In one line: if you are an individual buying a home or a lettable apartment, this tower. If you are a company buying premises or a commercial asset, read the Corporate Suites page linked below, because the rules there are genuinely different and getting them wrong is expensive.
Get the current price list and unit availability
Developer pricing moves, and the good stacks go first. Tell me your budget and whether you're buying to live in or to let — I'll send back the units that actually fit, not a generic brochure.
No agent fee payable by the buyer on new developer launches
Louis Koh
11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文
I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.
Published 2026-08-11 · Last verified 2026-08-11 against Armani Hartajaya Sdn Bhd (Pavilion Group)'s published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: Pavilion Group (2 developments on this site)
Where it is: Bukit Bintang, Kuala Lumpur (KL)
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
30633-1 · DATARAN PAVILION (PAVILION SQUARE)
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 68 storeys Lancar | 1, 2, 3 / 1, 2, 3 | — | 960 | RM1,319,000.00 – RM5,774,150.00 | 32.40% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-17, project code 30633-1. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.
How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.
No floor plan is reproduced on this page — but the drawings are findable
A floor plan is the developer’s copyright. This site does not mirror one and let you assume it is official. What it can do is send you to the drawing itself.
The advertisement the developer filed and the housing department approved normally carries the location plan and the unit count and price for each type. A salesperson’s brochure can be reissued. This one cannot.
The drawing that binds the developer is the one attached to your own sale and purchase agreement. Anything on any website is a reference copy — check the schedule to your contract before you sign.





