Mezon @ Park Enclave, Batu Kawan
Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches
Aspen Vision City, Batu Kawan · New launch · Permit issued Sep 2026

Mezon @ Park Enclave, Batu Kawan

Two 47-storey towers with 602 freehold serviced apartments on the edge of Aspen Vision City’s 25-acre Central Park, 231 m in a straight line from IKEA Batu Kawan. Three- and four-bedroom homes of 862 to 1,410 sq ft in single-, dual- and tri-key layouts. The whole permit band sits above Seberang Perai’s RM500,000 strata floor for foreign individuals, so non-citizens may apply, subject to state consent.

Freehold602 units · 2 towers862–1,410 sq ftPermit issued Sep 2026

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

602serviced apartments in two towers
47storeys each, homes on Levels 9–46
179 mto the 25-acre Central Park
Mezon @ Park Enclave official project image from the developer's microsite, Aspen Vision City, Batu Kawan, Penang
Mezon @ Park Enclave · official image from the developer’s microsite
Answer block

Mezon @ Park Enclave, Batu Kawan at a glance

Every figure below comes from the developer’s own published material or the government register. Where neither has published something, it isn’t on this page.

Development
Mezon @ Park EnclaveRegistered as Pangsapuri Perkhidmatan Mezon · licence held by Aspen Vision City Sdn Bhd
Where it is
Aspen Vision City, Batu KawanBandar Cassia, Seberang Perai Selatan · 179 m from Central Park, straight-line
Tenure
Freehold‘Kekal’ on the developer’s advertisement filed with the register
Building
2 towers · 47 storeys eachA 9-storey podium of shops and parking, then 38 residential floors, Levels 9 to 46
Units
602301 in each tower · 8 homes a floor on 35 floors, 7 on the top three
Layouts
862 – 1,410 sq ft3 bedrooms in Tower A; 3 or 4 in Tower B · single-, dual- and tri-key
Facilities
Indoor spring pool and onsenLap pool, motion court, glass gym and lounges · 28 shop units in the podium
Completion
Expected May 2029The developer’s stated date · the register shows work not yet started and a 54-month delivery period
Government permit
14588-6/09-2029/0657(N)-(S)Valid 2 Sep 2026 to 1 Sep 2029
Foreign buyers
Open, subject to state consentThe whole permit band is above the RM500,000 mainland strata floor for foreign individuals; foreign companies need RM1,000,000
Why this address

Six things about Mezon @ Park Enclave to weigh before you enquire

Four are reasons a buyer would shortlist it. Two are things to settle first. All six come from Aspen’s own material, named newspapers or the government register.

🌳

A front-row seat on a 25-acre park

The site sits on the edge of Aspen Vision City’s Central Park, which the developer puts at 25 acres. Measured in a straight line from the project pin, the park is 179 m away, Klippa Shopping Centre and IKEA Batu Kawan 231 m, Columbia Asia Hospital 592 m and the UOW Malaysia KDU campus 771 m. Few mainland towers have that much already built around them on the day they launch.

📜

Freehold, inside a township with a record you can check

The advertisement filed with the housing register states the tenure as ‘Kekal’ — freehold. The Star reported in April 2026 that Aspen Vision City had four completed developments totalling 3,398 units, and the register confirms the first of them, Vertu Resort, received its certificate of completion and compliance on 8 April 2021.

🔑

Dual-key and tri-key layouts for larger households

Tower A is sold as single-key or dual-key, Tower B as dual-key or tri-key, and every home has at least three bedrooms. That suits a three-generation household that wants separate front doors under one title, or an owner who lives in one part and lets the other. Ask to see how the keys split on the actual drawing before you assume the rental arithmetic.

♨️

Facilities built around water and wellness

The developer lists an indoor spring pool with onsen, jacuzzi and hydrotherapy spa, a lap pool reported by The Star as Olympic-length, a motion court for pickleball, badminton and sepak takraw, a glass gym and a glass event lounge. Both The Star and EdgeProp report that the project is designed to the GreenRE Gold standard.

⏳

Construction has not started — and the delivery period is 54 months

In October 2026 the register lists Mezon as ‘belum mula’ (not yet started) at 0% built. The developer’s advertisement gives May 2029 as the expected completion, but the register also records an approved 18-month extension to the standard 36-month delivery period. Under the first agreement, dated 26 September 2026, the latest handover date is therefore 26 March 2031. Plan your financing around the contract date, not the brochure date.

🔎

602 homes, and several basics still unpublished

Eight homes share each floor and 602 share one facilities deck. Aspen has not published the land area, the number of lifts, the car park allocation per unit or the monthly charges. The same developer’s Versa, 651 m away, will add 980 more apartments when it completes. When I read the register, 88 of the 602 units were recorded as sold. I will get the missing answers in writing.

Project DNA

The whole development, decoded

Every number here is the developer’s own or the government register’s.

602Units
2Towers
47Storeys each
862+Sq ft, smallest type

Pick your tower

The Purposeful Residence

Tower A

The developer’s name for Tower A is ‘The Purposeful Residence’, sold in single-key or dual-key form. Every type has three bedrooms and two bathrooms; the microsite gives the tower’s range as 862 to 1,410 sq ft, the top of that range belonging to the terrace variants. On the register this is the 301-unit component with the permit band RM694,000 to RM1,043,000 — and on the day I read it, 32 units were recorded as sold and 269 as not yet sold.

301Units
38Residential floors
3Bedrooms, every type
Types A and A1 · 862 sq ftType B · 1,002 sq ftType C1 · 1,055 sq ftType C · 1,056 sq ftTerrace types · up to 1,410 sq ft
💬 Ask about Tower A
The Evolving Residence

Tower B

Tower B, ‘The Evolving Residence’, is the dual-key and tri-key tower and the only one with four-bedroom, three-bathroom homes. The microsite gives its range as 894 to 1,335 sq ft. On the register it is the second 301-unit component, with three or four bedrooms and the permit band RM720,000 to RM1,067,000. When I read the unit list, 56 units were recorded as sold and 245 as not yet sold — the faster-moving tower of the two so far.

301Units
38Residential floors
3–4Bedrooms
Type D · 894 sq ftType B1 · 991 sq ftType E1 · 1,131 sq ft · 4 bedType E · 1,163 sq ft · 4 bedTerrace types · up to 1,335 sq ft
💬 Ask about Tower B

Facilities

From Aspen’s Mezon microsite and the newspaper reports of the show-unit opening. The advertisement filed with the register places the community facilities floor on Level 9; the developer has not published a level-by-level plan, and The Star’s report speaks of more than 50 facilities in all.

Water and wellness

Developer’s list
  • Indoor spring pool
  • Onsen
  • Jacuzzi
  • Hydrotherapy spa
  • Olympic-length lap pool

Sport and social

Developer’s list
  • Motion court — pickleball, badminton, sepak takraw
  • Glass gym
  • Glass event lounge
  • Communal lounge
  • Reading lounge
  • Zen-style gardens with tatami elements

Podium and green features

Ground floor to Level 8
  • 28 shop units on the ground floor and Level 1
  • Car park on Levels 2 to 8
  • EV charging stations
  • Solar panels
  • Rainwater harvesting
  • Pneumatic waste collection

Where the project is now

26 Mar 2026Show units unveiled at Aspen Vision City, as reported by EdgeProp and The Star
2 Sep 2026Advertising permit issued · valid to 1 Sep 2029
26 Sep 2026Date of the first sale and purchase agreement as recorded on the register
Oct 2026Register shows 0% built, ‘not yet started’ · 88 of 602 units recorded as sold
May 2029Expected completion stated on the developer’s advertisement
26 Mar 2031Latest delivery date under the first agreement — 54 months, Schedule H with an approved extension
Layouts

All 8 Mezon @ Park Enclave, Batu Kawan floor plans

Nine type codes have a drawing on the advertisement the developer filed with the register: A, A1, B, C and C1 in Tower A, and D, B1, E and E1 in Tower B, from 862 to 1,163 sq ft. Type A1 is printed at the same 862 sq ft as Type A, with three bedrooms and two bathrooms. The floor key plan on that advertisement also marks a D1 position in Tower B without a drawing of its own, and the microsite shows a set of terrace types, which take the range up to 1,410 sq ft in Tower A and 1,335 sq ft in Tower B; the individual sizes of D1 and the terrace types are not listed in text, so ask me for the sheet.

Mezon @ Park Enclave Tower A · Type A floor plan published by the developer, Batu Kawan, Penang

Tower A · Type A — 862 sq ft

About 80 sqm · three bedrooms, two bathrooms · the smallest layout in the project · drawing from the developer’s microsite

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower A · Type B floor plan from the developer's advertisement filed with the government register, Batu Kawan, Penang

Tower A · Type B — 1,002 sq ft

About 93 sqm · three bedrooms, two bathrooms · size and drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower A · Type C1 floor plan from the developer's advertisement filed with the government register, Batu Kawan, Penang

Tower A · Type C1 — 1,055 sq ft

About 98 sqm · three bedrooms, two bathrooms · a variant of Type C · drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower A · Type C floor plan published by the developer, Batu Kawan, Penang

Tower A · Type C — 1,056 sq ft

About 98 sqm · three bedrooms, two bathrooms · the largest standard Tower A type · drawing from the developer’s microsite

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower B · Type D floor plan from the developer's advertisement filed with the government register, Batu Kawan, Penang

Tower B · Type D — 894 sq ft

About 83 sqm · three bedrooms, two bathrooms · the smallest Tower B layout · drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower B · Type B1 floor plan from the developer's advertisement filed with the government register, Batu Kawan, Penang

Tower B · Type B1 — 991 sq ft

About 92 sqm · three bedrooms, two bathrooms · shown under Tower B on the developer’s microsite · drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower B · Type E1 floor plan from the developer's advertisement filed with the government register, Batu Kawan, Penang

Tower B · Type E1 — 1,131 sq ft

About 105 sqm · four bedrooms, three bathrooms · a variant of Type E · drawing from the developer’s advertisement filed with the government register

🛏 4 Bed🛁 3 BathOfficial drawing
Get this floor plan
Mezon @ Park Enclave Tower B · Type E floor plan published by the developer, Batu Kawan, Penang

Tower B · Type E — 1,163 sq ft

About 108 sqm · four bedrooms, three bathrooms · the largest standard type on the filed advertisement · drawing from the developer’s microsite

🛏 4 Bed🛁 3 BathOfficial drawing
Get this floor plan
Location & connectivity

Where Mezon @ Park Enclave, Batu Kawan sits

Persiaran Cassia Barat 8, inside Aspen Vision City in Bandar Cassia, Batu Kawan — Seberang Perai Selatan, on the mainland side of the Second Penang Bridge. The site faces the township’s Central Park and is 231 m in a straight line from Klippa Shopping Centre and IKEA Batu Kawan.

Open in Google Maps →
📍 5.234657, 100.43885414110 Batu Kawan

The national housing register has no coordinates on file for project 14588-6, so the map is pinned to the project’s own map listing at Persiaran Cassia Barat 8, beside Central Park. Distances are straight-line from that point.

What the map does not tell you. My figures are straight-line from the project’s map pin; the developer’s own list quotes longer travel distances for the same places, so use mine for orientation and theirs for the drive. Batu Kawan is a driving township: the island is reached over the Second Penang Bridge, whose Bandar Cassia toll plaza is 1.6 km away, and the airport is 19.4 km in a straight line across the water. If you work on the island, drive the bridge at your real commuting hour before you decide.
  • Aspen Vision City Central Park179 mstraight-line
  • Klippa Shopping Centre and IKEA Batu Kawan231 mstraight-line
  • Columbia Asia Hospital Batu Kawan592 mstraight-line
  • UOW Malaysia KDU Penang University College, Batu Kawan campus771 mstraight-line
  • Batu Kawan Industrial Park964 mstraight-line
  • Design Village Outlet Mall1.0 kmstraight-line
  • Bandar Cassia toll plaza, Second Penang Bridge1.6 kmstraight-line
  • SJK(C) Keng Koon4.4 kmstraight-line
  • Penang International Airport19.4 kmstraight-line
The government record

On the government register it is project 14588-6 — 602 units, not yet started

The housing developer’s licence is held by Aspen Vision City Sdn Bhd (14588), the township company. It has six projects on the national register: Vertu Resort (14588-1), two phases of Taman Viluxe (14588-2 and 14588-5), Vivo (14588-3), Versa (14588-4) and Mezon, filed as Pangsapuri Perkhidmatan Mezon (14588-6).

Project codeRegistered nameAdvertising permitPermit expiresUnitsBed / bathStatus
14588-6Tower A — serviced apartments, 38 residential storeys14588-6/09-2029/0657(N)-(S)1 Sep 20293013 / 20% built · not yet started
14588-6Tower B — serviced apartments, 38 residential storeys14588-6/09-2029/0657(N)-(S)1 Sep 20293013–4 / 2–30% built · not yet started
Total602Licensed developer: Aspen Vision City Sdn Bhd (14588)

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Read from teduh.kpkt.gov.my on 2 October 2026. Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=14588-6

602 units on the register, 602 in the developer’s material

The register files Mezon as two components of 301 serviced apartments each — one per tower — and the developer’s advertisement and the newspaper reports give the same 602. The unit list runs from Level 9 to Level 46 in each tower: 8 homes on each of 35 floors and 7 on each of the top three, which adds up to 301. The register counts 38 residential storeys; the developer’s 47-storey figure adds the 9-storey podium. On the day I read it, 88 units were recorded as sold (32 in Tower A, 56 in Tower B) and 514 as not yet sold.

What the permit band tells you — and where foreigners stand

The advertising permit records RM694,000 to RM1,043,000 for the Tower A component and RM720,000 to RM1,067,000 for Tower B. That is the band on the advertising permit, not the price of any unit. Seberang Perai’s floor for a foreign individual buying strata property is RM500,000, so the whole band is above it and every unit is open on price, subject to state consent and the state levy. For a foreign company the floor is RM1,000,000, which the band straddles — eligibility is then decided unit by unit at the price in the agreement.

Schedule H — 36 months plus an approved 18-month extension

The sale and purchase agreement is Schedule H (strata). The register shows the standard 36-month delivery period with an additional 18 months already approved, giving 54 months in all. The first agreement is dated 26 September 2026: the original handover date would have been 26 September 2029, and the date with the extension is 26 March 2031. Your own clock runs from the date of your agreement, on the period written into it.

0% built in October 2026

The register’s status for both towers is ‘belum mula’ — not yet started — at 0% complete, with no certificate of completion and compliance and no vacant possession recorded. The developer’s advertisement gives May 2029 as the expected completion date. That is a target, about 32 months after the first agreement, for two 47-storey towers; the contractual period is the 54 months above.

Track record

About Aspen Group

Mezon is licensed to Aspen Vision City Sdn Bhd, the company behind the Aspen Vision City township in Batu Kawan; EdgeProp’s report of the unveiling names the developer as Aspen (Group) Holdings Ltd, whose head office is Aspen House on Jalan Macalister in George Town. EdgeProp describes the township as a 247-acre freehold development, and its retail anchor is IKEA Batu Kawan — the IKEA mark sits beside Aspen’s on the Mezon microsite.

The register shows what the same licence has delivered so far. Vertu Resort, 571 m from the Mezon pin, is 1,246 units in five blocks of 20 to 36 storeys, completed with its certificate of completion and compliance on 8 April 2021. Vivo (1,530 units in three blocks) and the first phase of Viluxe (174 terrace homes) are also filed as completed, with certificates dated 27 November 2024 and 24 May 2024. Versa — 980 units in two 31-storey blocks — is filed as on track at 70.71% and 68.88% built, and a second Viluxe phase is under way.

The developer describes Mezon as Japanese-inspired living: an onsen and indoor spring pool, tatami and Zen garden elements, and green features such as solar panels, rainwater harvesting and pneumatic waste collection. The filed advertisement also notes that the land is charged to Maybank Islamic Berhad, which is ordinary project financing; your solicitor deals with the redemption statement at signing.

One honest note on timing. Vertu Resort’s delivery period was extended, with approval, from 36 to 46 months, and Versa’s from 36 to 48. Mezon starts with an 18-month extension already on the record before construction has begun. Aspen has finished what it started in this township, but each tower project here has taken longer than the standard 36 months — read the delivery and late-delivery clauses in your agreement instead of relying on the May 2029 date.

Straight answers

Frequently asked questions

How many units are there at Mezon @ Park Enclave?

602 serviced apartments in two towers, 301 in each. The developer’s advertisement, the newspaper reports and the government register give the same total.

Each tower has 38 residential floors from Level 9 to Level 46 — eight homes on each of 35 floors and seven on each of the top three — above a 9-storey podium that holds 28 shop units and the car park.

Is Mezon @ Park Enclave freehold?

Yes, according to the developer: the advertisement filed with the housing register gives the tenure as ‘Kekal’, which is freehold, and The Star and EdgeProp both describe the project and the township as freehold.

The same advertisement notes the land is charged to Maybank Islamic Berhad as project financing. Your solicitor’s title search at signing is the final word on both points, including the land-use category behind a serviced-apartment title.

What are the unit sizes and layouts at Mezon?

Tower A: three bedrooms and two bathrooms throughout — Types A and A1 at 862 sq ft, Type B at 1,002 sq ft, Type C1 at 1,055 sq ft and Type C at 1,056 sq ft, with terrace variants taking the tower’s range to 1,410 sq ft. Tower B: Type D at 894 sq ft and Type B1 at 991 sq ft with three bedrooms, and Types E1 and E at 1,131 and 1,163 sq ft with four bedrooms and three bathrooms; its range runs to 1,335 sq ft.

Tower A is sold as single-key or dual-key and Tower B as dual-key or tri-key. The developer does not list in text which type carries which key arrangement; the drawings above show the rooms, and I will mark up the key split for you.

Can foreigners buy at Mezon @ Park Enclave?

On price, yes. The lowest figure on the permit band is RM694,000, above Seberang Perai’s RM500,000 floor for a foreign individual buying strata property. A purchase still needs state consent, a 3% state levy applies on approval, and the unit cannot be resold for three years. Units reserved under the Bumiputera quota are closed to foreigners.

A foreign company faces a RM1,000,000 floor, so only units priced at or above that in the agreement qualify. Non-citizens also pay a flat 8% stamp duty on residential property; your solicitor will confirm how it is applied to a serviced-apartment title. I can walk you through the consent paperwork.

When will Mezon be completed?

The developer’s advertisement gives May 2029 as the expected completion date. In October 2026 the register shows construction not yet started.

Contractually, the register records a 54-month delivery period — the standard 36 months under Schedule H plus an approved 18-month extension. Under the first agreement, dated 26 September 2026, the latest handover date is 26 March 2031.

Which tower and which type should I choose?

Start with the household. Tower A is the three-bedroom tower, in single- or dual-key form, and its smallest type is 862 sq ft. Tower B is the one with four-bedroom homes and tri-key layouts, which suits three generations or an owner who wants to let part of the home.

Then look at position: ask for the floor plate to see which of the eight homes on a floor face Central Park and which face the neighbouring blocks, and note that the top three floors have seven homes instead of eight. The register showed Tower B selling faster — 56 units against 32 — so the choice there will narrow first.

What is the price and the maintenance fee?

The only public price information I will quote is the government permit band: RM694,000 to RM1,043,000 for Tower A and RM720,000 to RM1,067,000 for Tower B — the band on the advertising permit, not the price of any unit. I do not repeat figures from property portals.

The developer has not published the monthly maintenance charge or sinking fund. Message me and I will send the current price list, the remaining units and the charges in writing.

How does Mezon compare with Vertu Resort in the same township?

Same licensee, 571 m apart. Vertu Resort is 1,246 units in five blocks of 20 to 36 storeys and has been complete since April 2021, so you can walk through it, see how it is kept and talk to people who live there. Mezon is 602 units in two 47-storey towers that have not yet started on site.

Mezon is the newer product — dual- and tri-key layouts, the onsen and spring pool, the park frontage — but you are buying off the plan with a 54-month delivery period. If you need a home within the next two years, look at the completed blocks; if you can wait for the design, this is the one.

Is Batu Kawan practical for daily life or for renting out?

For daily life, the basics are within a few hundred metres in a straight line: Central Park 179 m, Klippa Shopping Centre and IKEA 231 m, Columbia Asia Hospital 592 m, the UOW Malaysia KDU campus 771 m and Design Village Outlet Mall 1.0 km. The nearest Chinese primary school I measured, SJK(C) Keng Koon, is 4.4 km away.

For renting, the demand in Batu Kawan comes from the industrial park, whose reference point is 964 m away, and from the university campus. I do not quote rental figures. Remember that this township will also receive Versa’s 980 apartments, so judge the rental case on your own unit’s layout and position, not on the area’s name alone.

Get the current price list and unit availability

Developer pricing moves, and the good stacks go first. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit, not a generic brochure.

No agent fee payable by the buyer on new developer launches

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文

I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-02 · Last verified 2026-10-07 against Aspen’s Mezon microsite, the developer’s advertisement filed with the housing register, reports in The Star and EdgeProp (March–April 2026), and the KPKT housing register. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Mezon @ Park Enclave, Batu KawanFreehold · 862–1,410 sq ft · Batu Kawan
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: Aspen Group (4 developments on this site)

Where it is: Batu Kawan, Penang

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

14588-6 · PANGSAPURI PERKHIDMATAN MEZON

Overall status: Belum Mula — not started

Certified completion by componentPangsapuri Servis – 301 units0.00%Pangsapuri Servis – 301 units0.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Pangsapuri Servis
38 storeys
–
3 / 2—301RM694,000.00
– RM1,043,000.00
0.00%
Pangsapuri Servis
38 storeys
–
3, 4 / 2, 3—301RM720,000.00
– RM1,067,000.00
0.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 14588-6. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.