Eco Horizon @ Batu Kawan, Penang
EcoWorld’s 300-acre freehold township beside IKEA Batu Kawan, with 3,384 homes on the government register and most of them already built. Two phases are selling now: Dawson, 262 terrace and garden homes at 32.02% built, and Beldon, 182 semi-detached houses. For foreign buyers, Dawson is decided unit by unit at the agreement price; Beldon’s permit band sits above the mainland floor.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation



Eco Horizon @ Batu Kawan, Penang at a glance
Every figure below comes from the developer’s own published material or the government register. Where neither has published something, it isn’t on this page.
- Development
- Eco HorizonA township by EcoWorld · licence held by Eco Horizon Sdn Bhd
- Where it is
- Bandar Cassia, Batu KawanSeberang Perai Selatan, mainland Penang · along Jalan Tun Abdullah Ahmad Badawi
- Tenure
- Freehold‘Hakmilik kekal’ on the developer’s pages and filed advertisements · the title needs state consent for dealings
- Township size
- 300 acres230 acres residential and 70 acres commercial, as reported by The Edge at the 2017 launch
- Homes on the register
- 3,384 in 11 phases2,082 landed homes and 1,302 Duduk Ceria serviced apartments · 3,010 already completed
- Selling now
- Dawson and BeldonDawson: 262 terrace and garden homes · Beldon: 182 semi-detached houses in two phases
- Sizes
- 1,682 to 2,671 sq ftDawson 1,682 and 1,749 sq ft · Beldon 2,540 to 2,671 sq ft
- Completion
- Dawson: October 2027Developer’s expected date · Beldon’s 112 homes July 2027 · Beldon’s other 70 are completed
- Government permit
- 19152-12/10-2027/0983(A)-(S)Dawson · valid 25 Oct 2024 to 24 Oct 2027 · Beldon: 19152-9/03-2027/0236(R)-(S)
- Foreign buyers
- Unit by unit at DawsonMainland floor for landed and landed-strata homes is RM1,000,000 · Dawson’s band straddles it, Beldon’s is above it
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Six things about Eco Horizon worth knowing before you enquire
Four are reasons a Penang buyer would shortlist the township. Two are things to settle first. All six come from EcoWorld’s own material, the government register or The Edge.
Freehold landed homes in Batu Kawan
EcoWorld states ‘hakmilik kekal’ — freehold — on its Eco Horizon pages and on the advertisements it filed with the housing register. Dawson and Beldon are two-storey houses, not apartments, so you are buying a house on a freehold township title in the part of the mainland where the factories and the Second Penang Bridge are.
Most of the township is already standing
Of the 3,384 homes on the register, 3,010 are in phases recorded as completed with their certificates — Ashton since January 2021, Camdon and the first Beldon houses in 2024, Duduk Ceria in September 2026. You can drive the streets and see how the earlier phases have aged before you buy the newest one.
The lake park and clubhouse exist, at the centre
EcoWorld’s 2017 release describes the Twin Flamingo Lakes, a 13.6-acre landscaped park with a flamingo-shaped water body at the centre of the township, and a clubhouse of about 3 acres with an Olympic-sized swimming pool, community hall, lounge and BBQ area. The clubhouse is 823 m from the sales gallery in a straight line, so walk both on your visit.
Work, shopping and the toll plaza within about 1.2 km
Straight-line from the township’s registered coordinates: IKEA Batu Kawan 755 m, Design Village Outlet Mall 891 m, UOW Malaysia KDU’s Batu Kawan campus 1.1 km, and both the Bandar Cassia toll plaza and Batu Kawan Industrial Park 1.2 km. That is the practical case for a household with jobs in the industrial park or on the island.
Check the delivery history phase by phase
The register shows approved extensions on three earlier phases — six months on Ashton, five months on the first Camdon townhouses and twelve months on Duduk Ceria — and one advertising permit, for 241 Brydon houses, recorded as cancelled. Everything else was delivered. Read the delivery and late-payment clauses of your own agreement, not the brochure date.
It is a strata scheme, and some basics are not published
Every phase is sold under Schedule H, the strata form of agreement, which means monthly charges for the guarded precinct and shared grounds. EcoWorld’s pages do not state those charges, the clubhouse membership terms or the unit count for each Dawson type, and the filed advertisements note the land is charged to a bank. I will get the answers in writing.
The whole development, decoded
Every number here is the developer’s own or the government register’s.
Pick your phase

Dawson
The phase EcoWorld is launching now, filed on the register as Eco Horizon 3. Two two-storey layouts: the THA terrace on a 20 ft × 60 ft lot and the GHA garden home on a wider 24 ft × 56 ft lot. The register records four bedrooms and three bathrooms for all 262 homes and, on the day I read it, 179 sold and 83 not yet sold. The developer’s website gives October 2027 as the expected completion; the advertisement it filed with the register says September 2027.

Beldon · 112 semi-Ds
The SD6 semi-detached homes on 34 ft × 75 ft lots, in four variants from SD6A to SD6D. The developer’s brochure describes four bedrooms upstairs plus a guest room and a maid’s room on the ground floor, which is why the register counts five or six bedrooms and five bathrooms. On the day I read the register, 49 of the 112 were sold and 63 were not. The developer expects completion in July 2027.
Beldon · 70 completed semi-Ds
The SD3 and SD5 semi-detached homes on deeper lots of 34 ft × 80 ft and 34 ft × 85 ft. The register shows this phase 100% built, with the certificate of completion and compliance dated 7 October 2025 and vacant possession on 3 November 2025. When I read it, 50 of the 70 were sold and 20 were not, so this is the one part of Beldon where you can walk through the actual house before you sign.
Facilities
From EcoWorld’s news release of 2 December 2017 and its Eco Horizon website. The Edge’s launch report gave the clubhouse as 3.6 acres; EcoWorld’s own release says 3 acres.
Clubhouse
- Olympic-sized swimming pool
- Community hall
- Lounge
- BBQ area
Twin Flamingo Lakes
- Flamingo-shaped water body
- Landscaped park around the lakes
Township
- Gated-and-guarded residential precincts
- Described by EcoWorld as the first Green Building Index township development in Batu Kawan
- Ceria Square and Borealis shops inside the township
Where the project is now
All 4 Eco Horizon @ Batu Kawan, Penang floor plans
Four layouts are on sale across the two current phases. Sizes and lot dimensions are EcoWorld’s; bedroom and bathroom counts are the ones recorded on the government register. The drawings are taken from the advertisements the developer filed with the government register; for Beldon one variant of each lot size is shown.

Dawson THA terrace — 1,682 sq ft
Get this floor plan
Dawson GHA garden home — 1,749 sq ft
Get this floor plan
Beldon SD6 semi-detached — 2,540 sq ft
Get this floor plan
Beldon SD3 / SD5 semi-detached — 2,605 sq ft
Get this floor planInside Eco Horizon @ Batu Kawan, Penang

Where Eco Horizon @ Batu Kawan, Penang sits
Bandar Cassia, Batu Kawan, in Seberang Perai Selatan on mainland Penang — the pin is the township’s registered point beside the EcoWorld Gallery on Jalan Tun Abdullah Ahmad Badawi. Dawson is 627 m from it in a straight line, the Beldon homes under construction 1.4 km, and Duduk Ceria 387 m.
Pinned to the coordinates filed with the national housing register for the township’s first phases (project 19152-1), which sit beside the EcoWorld Gallery. Distances are straight-line from that point; each phase has its own coordinates on the register.
- IKEA Batu Kawan755 mstraight-line
- Eco Horizon Clubhouse823 mstraight-line
- Design Village Outlet Mall891 mstraight-line
- UOW Malaysia KDU Penang University College, Batu Kawan1.1 kmstraight-line
- Bandar Cassia toll plaza1.2 kmstraight-line
- Batu Kawan Industrial Park1.2 kmstraight-line
- KPJ Penang Specialist Hospital14.5 kmstraight-line
- Second Penang Bridge15.0 kmstraight-line
- Penang International Airport19.8 kmstraight-line
On the government register it is licensee 19152 — 3,384 homes, 3,010 of them completed
The housing developer’s licence is held by Eco Horizon Sdn Bhd (19152), the EcoWorld company for this township. It has 14 project records on the national register: twelve for Eco Horizon and two for Taman Eco Sun, 2.3 km away. The table shows the eight most recent Eco Horizon records; four older ones are described underneath.
| Project code | Registered name | Advertising permit | Permit expires | Units | Bed / bath | Status |
|---|---|---|---|---|---|---|
| 19152-12 | Dawson (filed as Eco Horizon 3) — two-storey terrace houses | 19152-12/10-2027/0983(A)-(S) | 24 Oct 2027 | 262 | 4 / 3 | 32.02% built · on track |
| 19152-9 | Beldon (filed as Eco Horizon 1) — two-storey semi-detached | 19152-9/03-2027/0236(R)-(S) | 21 Mar 2027 | 112 | 5–6 / 5 | 61.61% built · on track |
| 19152-10 | Beldon (filed as Eco Horizon 1) — two-storey semi-detached | 19152-10/03-2026/0306(A)-(S) | 21 Mar 2026 | 70 | 5–6 / 5 | Completed · certificate 7 Oct 2025 |
| 19152-11 | Duduk Ceria — serviced apartments, 31 storeys, two components of 651 | 19152-11/08-2026/0981(A)-(S) | 29 Aug 2026 | 1,302 | 2–3 / 2–3 | Completed · certificate 1 Sep 2026 |
| 19152-8 | Eco Horizon — two-storey terrace houses (no phase name filed) | 19152-8/11-2025/0287(A)-(S) | 1 Nov 2025 | 114 | — | Completed · certificate 1 Oct 2024 |
| 19152-7 | Eco Horizon 2, Camdon Fasa 6 — two-storey townhouses | 19152-7/06-2025/0043(A)-(S) | 6 Jun 2025 | 235 | — | Completed · certificate 1 Nov 2024 |
| 19152-6 | Eco Horizon 2, Fasa 4 — two-storey terrace houses | 19152-6/01-2024/35(A)-(S) | 12 Jan 2024 | 180 | — | Completed · certificate 17 Jan 2024 |
| 19152-5 | Beldon Fasa 8 & 9 — 134 semi-detached and 47 detached houses | 19152-5/10-2024/1482(A)-(S) | 22 Oct 2024 | 181 | 5–6 / 5 (semi-detached) | Completed · certificate 30 May 2024 |
| Total | 2,456 | Licensed developer: Eco Horizon Sdn Bhd (19152) | ||||
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 2 October 2026. Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=19152-12
How 3,384 homes add up — and the four records not in the table
The eight records above total 2,456 homes. Three older completed records add 928: Ashton in two filings of 280 and 424 terrace houses (19152-1 and 19152-2, together the 704 homes The Edge reported at launch) and 224 Camdon townhouses (19152-4). That makes 3,384 homes in eleven phases, 2,082 of them landed. A twelfth record, 19152-3 for Brydon (226 semi-detached and 15 detached houses), is marked ‘Permit Telah Dibatalkan’ — permit cancelled — at 0% built, so I have not counted it. On the day I read the unit lists, Dawson showed 179 sold and 83 not sold, Beldon’s 112 homes 49 and 63, Beldon’s completed 70 homes 50 and 20, and Duduk Ceria all 1,302 sold.
What the permit bands mean for foreign buyers
Dawson’s advertising permit records RM993,370 to RM1,359,070; Beldon’s records RM1,655,360 to RM2,120,160 for the 112 homes under construction and RM1,700,160 to RM2,237,760 for the 70 completed ones. Each is the band on the advertising permit, not the price of any unit. Seberang Perai’s floor for a foreign buyer of a landed or landed-strata home is RM1,000,000, so Dawson’s band straddles it and eligibility is decided unit by unit at the agreement price, while both Beldon bands sit above it. Duduk Ceria’s band was RM510,370 to RM585,925, above the RM500,000 strata floor for foreign individuals, but the register shows it fully sold. State consent, the 3% levy and the flat 8% stamp duty for non-citizens apply in every case.
Schedule H, 36 months — and the extensions on record
Every Eco Horizon phase is filed under Schedule H, the strata form of agreement, with a 36-month delivery period. Dawson’s first agreement is dated 20 March 2025, which puts the latest delivery under that agreement at 20 March 2028; for Beldon’s 112 homes the dates are 20 July 2024 and 20 July 2027. Neither has an extension on record. Earlier phases do: six months on Ashton, five months on the first Camdon townhouses, and twelve months on Duduk Ceria, whose delivery date under the first agreement moved from 23 September 2026 to 23 September 2027. Your own clock runs from the date of your agreement.
32.02% and 61.61% built
The latest 7(f) returns report Dawson at 32.02% and Beldon’s 112 homes at 61.61%, both ‘lancar’ (on track). Beldon’s other 70 homes are 100% built with the certificate of completion and compliance dated 7 October 2025. For Duduk Ceria the register records 100% and a certificate dated 1 September 2026, while EcoWorld’s web page still shows October 2027 as the expected completion; if you are buying a resale unit there, ask me for the actual handover status.
About EcoWorld
EcoWorld is the brand of Eco World Development Group Berhad, a developer listed on Bursa Malaysia. In Batu Kawan its website lists two townships, Eco Horizon and the newer Eco Sun, and both are licensed to the same company, Eco Horizon Sdn Bhd, with Eco World Project Management as project manager.
The Edge reported on 29 September 2017 that Eco Horizon covers 300 acres — 230 for homes and 70 for commercial use — with a gross development value of RM7 billion over ten years. The first phase, Ashton, was 704 two-storey terrace, superlink and garden homes with built-ups of 2,290 to 2,601 sq ft. EcoWorld’s general manager for the northern region was quoted calling the lake park the first of that scale on the mainland.
Since then the developer’s site shows Ashton, Camdon, Duduk Ceria, Ceria Square and both Borealis shop phases as sold out, with Beldon and Dawson as the phases still selling. The register supports the picture: nine of the eleven live records are completed with certificates, and the two under construction are reported on track.
One honest note on track record: three earlier phases needed approved extensions of five to twelve months, and the Brydon permit of 2019 was cancelled before construction. None of that is unusual for a township built across a pandemic, but it is the reason to treat the developer’s expected dates as targets and the agreement date as the promise.
Frequently asked questions
How many homes are there in Eco Horizon?
The government register lists 3,384 homes in eleven phases under licensee 19152: 2,082 landed homes — terrace houses, townhouses, semi-detached and detached houses — and 1,302 Duduk Ceria serviced apartments. 3,010 of them are in completed phases.
The two phases selling now are much smaller: Dawson with 262 terrace and garden homes, and Beldon with 182 semi-detached houses split into 112 under construction and 70 completed.
Is Eco Horizon freehold?
Yes, according to the developer: its Eco Horizon pages and the advertisements filed with the housing register state ‘hakmilik kekal’ or ‘pegangan kekal’, both meaning freehold.
The filed advertisements also carry a restriction in interest — dealings need the written consent of the State Authority — and note that the land is charged to a bank as project financing. Your solicitor’s title search at signing is the final word.
What sizes and layouts are on sale now?
Dawson has two two-storey layouts: the THA terrace at 1,682 sq ft on a 20 ft × 60 ft lot and the GHA garden home at 1,749 sq ft on a 24 ft × 56 ft lot. The register records four bedrooms and three bathrooms.
Beldon’s semi-detached homes run from 2,540 to 2,671 sq ft on lots of 34 ft × 75 ft, 34 ft × 80 ft and 34 ft × 85 ft. The brochure shows four bedrooms upstairs plus a guest room and a maid’s room downstairs; the register counts five or six bedrooms and five bathrooms.
Can foreigners buy at Eco Horizon?
It depends on the phase. On the mainland the floor for a foreign buyer of a landed or landed-strata home is RM1,000,000. Dawson’s permit band runs from RM993,370 to RM1,359,070, so it straddles the floor and eligibility is decided unit by unit at the agreement price. Beldon’s bands start at RM1,655,360, above the floor.
A foreign purchase needs state consent, carries a 3% state levy on approval and the flat 8% stamp duty for non-citizens, and cannot be resold for three years. Bumiputera-quota units are closed to foreigners. Tell me the phase you like and I will check the specific unit.
When will Dawson and Beldon be completed?
Dawson: EcoWorld’s website gives October 2027 and its filed advertisement September 2027; the register shows 32.02% built. Beldon’s 112 homes: July 2027 on the developer’s site, 61.61% built. Beldon’s other 70 homes are completed, with vacant possession on 3 November 2025.
Contractually, delivery is 36 months from your own agreement under Schedule H. Under the first agreements on the register the latest dates are 20 March 2028 for Dawson and 20 July 2027 for Beldon’s 112 homes.
Which phase should I pick — Dawson or Beldon?
Dawson is the terrace product: 1,682 or 1,749 sq ft, four bedrooms, and a wait until about October 2027. Choose the GHA garden home if you want the wider 24 ft frontage, the THA if you prefer the deeper 60 ft lot.
Beldon is the semi-detached product at roughly one and a half times the built-up. If you want to move in soon, the 70 completed homes on the deeper 80 ft and 85 ft lots can be inspected today; the register showed 20 of them unsold. The 112 homes on 75 ft lots are due in July 2027 with more units to choose from.
What is the price and the monthly fee?
The only public price information is the government permit band: RM993,370 to RM1,359,070 for Dawson, and RM1,655,360 to RM2,120,160 and RM1,700,160 to RM2,237,760 for the two Beldon phases — the band on the advertising permit, not the price of any unit. I will not repeat figures from property portals.
EcoWorld has not published the monthly maintenance charge, sinking fund or clubhouse terms on its pages. Message me and I will send the current price list, the remaining units and the charges in writing.
How does Eco Horizon compare with Eco Sun?
Same licensee, 2.3 km apart in a straight line. Eco Horizon is the established township with its lake park, clubhouse and 3,010 completed homes. Taman Eco Sun’s current phase on the register is 264 two-storey terrace houses with four bedrooms and three bathrooms, 5% built in October 2026, so it is at the very start.
If you want neighbours, mature landscaping and facilities you can use from day one, Eco Horizon is the safer read. If you want the newest product and the longest runway, look at Eco Sun and compare the two agreements side by side.
Is Batu Kawan practical for daily life or for renting out?
For daily life: IKEA Batu Kawan is 755 m away in a straight line, Design Village Outlet Mall 891 m, UOW Malaysia KDU’s campus 1.1 km and the Bandar Cassia toll plaza 1.2 km. KPJ Penang Specialist Hospital is 14.5 km away, so specialist care means a drive.
For renting: tenant demand here comes from people working in Batu Kawan Industrial Park, 1.2 km away, and from students and staff of the campuses. I do not quote rental figures. A whole house in a guarded strata precinct suits a family or a company lease more than room-by-room letting, so ask the management about house rules first.
Get the current price list and unit availability
Developer pricing moves, and the good stacks go first. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit, not a generic brochure.
No agent fee payable by the buyer on new developer launches
Louis Koh
11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文
I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.
Published 2026-10-02 · Last verified 2026-10-07 against EcoWorld’s Eco Horizon website and e-brochures, the developer’s advertisements filed with the housing register, The Edge (29 September 2017), and the KPKT housing register. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: EcoWorld (7 developments on this site)
Where it is: Batu Kawan, Penang
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
19152-12 · ECO HORIZON 3
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 2 storeys Lancar | 4 / 3 | — | 262 | RM993,370.00 – RM1,359,070.00 | 32.02% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-12. Re-read weekly.
19152-9 · ECO HORIZON 1
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Berkembar 2 storeys Lancar | 5, 6 / 5 | — | 112 | RM1,655,360.00 – RM2,120,160.00 | 61.61% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-9. Re-read weekly.
19152-10 · ECO HORIZON 1
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Berkembar 2 storeys Siap Dengan CCC | 5, 6 / 5 | — | 70 | RM1,700,160.00 – RM2,237,760.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-10. Re-read weekly.
19152-11 · PANGSAPURI PERKHIDMATAN CERIA
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 31 storeys Siap Dengan CCC | 3 / 2, 3 | — | 651 | RM510,370.00 – RM585,925.00 | 100.00% |
| Pangsapuri Servis 31 storeys Siap Dengan CCC | 2, 3 / 2, 3 | — | 651 | RM510,370.00 – RM585,925.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-11. Re-read weekly.
19152-8 · ECO HORIZON
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 2 storeys Siap Dengan CCC | — | — | 114 | RM1,051,200.00 – RM1,410,000.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-8. Re-read weekly.
19152-7 · ECO HORIZON 2
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Bandar 2 storeys Siap Dengan CCC | — | — | 235 | RM581,100.00 – RM1,084,200.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-7. Re-read weekly.
19152-6 · ECO HORIZON 2
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 2 storeys Siap Dengan CCC | — | — | 180 | RM885,600.00 – RM1,263,600.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-6. Re-read weekly.
19152-5 · ECO HORIZON
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Berkembar 2 storeys Siap Dengan CCC | 6 / 5 | 0 – 229 m² | 58 | RM1,545,600.00 – RM1,965,600.00 | 100.00% |
| Rumah Sesebuah 2 storeys Siap Dengan CCC | — | 0 – 297 m² | 47 | RM2,361,600.00 – RM3,237,600.00 | 100.00% |
| Rumah Berkembar 2 storeys Siap Dengan CCC | 5 / 5 | 0 – 229 m² | 76 | RM1,641,600.00 – RM2,085,600.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-08, project code 19152-5. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.
How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.






