Coronade Twins as an Investment: Which Layout to Rent Out, and the Numbers That Decide It
An investor’s reading of Coronade Twins: who the tenants will be once the RTS Link opens, the rent each layout has to earn just to cover its loan, how much competing stock Johor already has, and which units will be easiest to sell later. No invented yields — every number is sourced or shown as arithmetic.

Quick answer: is Coronade Twins a good investment?
It is a location bet with a long runway. The tenant story is strong — a 210 m covered walk to a train that can carry 10,000 passengers an hour each way into Singapore — but Johor already has the largest stock of unsold completed serviced apartments in Malaysia (9,946 units at June 2026), and the developer has not published a completion date or maintenance fee.
If you invest, Type B (511 sq ft) and Type C (705 sq ft) are the units with the widest tenant and resale pool. Treat Type A1 as the riskiest: highest price per square foot, a single-person tenant market and no foreign buyers on resale.
- Investors who can hold 5+ years
- Buyers who will price rent against a large supply
- Those who want a tenant base tied to a rail line, not a highway
- Anyone counting on a quick flip
- Buyers who need rent to cover 100% of the instalment from day one
- Investors who need a known completion date for cash-flow planning
Who will rent here?
The core tenant is a Malaysian or foreign professional who works in Singapore and wants to stop driving across the Causeway. Singapore’s transport ministry puts RTS capacity at 10,000 passengers per hour in each direction; Malaysia’s transport ministry projects about 40,000 daily passengers in 2027. Every one of them needs to live within reach of Bukit Chagar, and Coronade Twins is a 210 m covered walk away.
The second tenant pool is the podium itself: staff and visiting specialists for KPJ’s medical suites, Bank Rakyat’s tower, the CapitaLand-managed mall and the Ascott hotel scheduled for the second half of 2029.
The supply you will be competing with
| NAPIC, H1 2026 (serviced apartments) | Johor | Malaysia |
|---|---|---|
| Completed and unsold | 9,946 units | 23,375 units |
| Under construction and unsold | 10,756 units | 50,112 units |
| Not yet built and unsold | 5,853 units | 14,618 units |
Johor holds about 42.5% of the country’s unsold completed serviced apartments. Most of that stock is not next to a station — but it still sets the ceiling for what a tenant will pay for a studio or one-bedder. The units that stand out in a crowded market are the ones a tenant cannot easily replace: a two-bathroom layout within a short covered walk of the train. That is Type C.
Which layout to rent out
| Layout | Likely tenant | Resale buyer pool | Investor view |
|---|---|---|---|
| A1 · 280 sq ft · from RM450k | One commuter | Locals only (below RM1m floor); few families | Highest psf, narrowest exit — the riskiest unit |
| B · 511 sq ft · from RM700k | A couple, or two sharers | Locals only | The “most lettable” unit; one bathroom limits sharers |
| C · 705 sq ft · from RM1m | Small family or two professionals | Locals and foreigners | Best balance of tenant pool and exit |
| D · 1,230 sq ft duplex · from RM1.7m | Expat family, executive | Locals and foreigners; small pool | Scarce; can take longer to let and sell |




The rent each layout must earn to cover its loan
This is the number that matters before any yield talk: the monthly instalment you have to fund. On a 90% loan over 35 years at 4.0%:
| Layout | Published from | Monthly instalment | Rent needed to cover the loan alone |
|---|---|---|---|
| A1 | RM450,000 | ≈ RM1,793 | ≈ RM1,800 + maintenance |
| B | RM700,000 | ≈ RM2,789 | ≈ RM2,800 + maintenance |
| C | RM1,000,000 | ≈ RM3,985 | ≈ RM4,000 + maintenance |
| D | RM1,700,000 | ≈ RM6,774 | ≈ RM6,800 + maintenance |

Catalysts and their dates
| When | What | Source |
|---|---|---|
| 25 Apr 2024 | MOU with MRT Corp for the 210 m bridge to the RTS station | Developer |
| Nov 2025 | CapitaLand Investment appointed to manage Coronation Square Mall | Developer |
| May 2026 | Coronation Square Mall breaks ground | Developer |
| Feb 2027 | RTS Link passenger service targeted | LTA / MOT Malaysia |
| 2H 2029 | Ascott Coronation Square (207 rooms) scheduled to open in Tower 1 | Developer |
| Not published | Coronade Twins completion date | Ask for the APDL |
The RTS opens years before Coronade Twins is likely to be finished, so the rental market around Bukit Chagar will already have settled by the time you hold the keys. Use that: by 2027–2028 you will be able to see real RTS-area rents before your progress payments get large.
Selling later: RPGT and the buyer pool
Real Property Gains Tax for Malaysian citizens is 30% on a disposal within three years, 20% in year four, 15% in year five and 0% from year six. Non-citizens pay 30% within five years and 10% from year six (LHDN). For a new launch, the holding period runs from the date of the SPA, so the construction years count.
The bigger exit issue is who can buy from you. A1 and B sit below Johor’s RM1,000,000 foreign-buyer floor, so their resale buyer is almost always a Malaysian — and Malaysian families rarely buy 280 sq ft. Types C and D can be sold to both Malaysians and foreigners.
Risks to price in
What protects you
- A 210 m covered walk to the RTS that rivals cannot copy
- Institutional neighbours already committed (Bank Rakyat, KPJ, CapitaLand, Ascott)
- Progress payments: you pay as it is built
What could hurt
- Johor’s large serviced-apartment overhang caps small-unit rents
- Completion date and maintenance fee not yet published
- Years of IIBD construction nearby
- A1/B resale limited to local buyers
Frequently asked questions
Is Coronade Twins a good investment?
It is a long-term location investment: a 210 m covered walk to the RTS Link, which can carry 10,000 passengers per hour each way, inside a development anchored by Bank Rakyat, KPJ, CapitaLand and Ascott. The risks are Johor’s large serviced-apartment overhang (9,946 completed unsold units at June 2026) and the unpublished completion date and maintenance fee.
What rental yield can I expect at Coronade Twins?
No honest yield exists yet, because the building has no rent history. As a guide, a Type C at RM1 million needs about RM4,000 a month plus maintenance to cover a 90% loan over 35 years at 4.0%. Completed city-centre towers list asking rents of roughly RM1,300 to RM5,000.
Which Coronade Twins layout is best for rental?
Type C (705 sq ft, 2+1 bedrooms, 2 bathrooms) has the widest tenant pool and can be resold to both Malaysians and foreigners. Type B (511 sq ft) is the easiest to let but resells only to locals. Type A1 is the riskiest.
Can I do Airbnb at Coronade Twins?
The developer has not published the strata rules. Short-stay letting depends on the deed of mutual covenant and the management corporation’s by-laws, so ask for them before you buy if short stays are your plan.
How much RPGT will I pay if I sell?
Malaysian citizens pay 30% within three years, 20% in year four, 15% in year five and nothing from year six. Non-citizens pay 30% within five years and 10% from year six. The holding period for a new launch counts from the SPA date.
Sources and method
Prices and layouts are the developer’s published figures. Supply figures are NAPIC’s H1 2026 report. RTS capacity and ridership figures come from the Singapore and Malaysian transport ministries. Asking-rent ranges are from our own pages on completed city-centre buildings and are asking, not achieved, rents. Instalments assume a 90% loan over 35 years at 4.0% a year. I do not publish a rental yield for Coronade Twins because there is no rent history for a building that does not exist yet.
- malaysiaproperty4u.com — Coronade Twins project page (developer figures, checked against the developer’s site)
- NAPIC (JPPH), Property Market Status Report H1 2026 — serviced apartment overhang by state
- Ministry of Transport Singapore, 4 Nov 2026 — RTS Link capacity of 10,000 passengers per hour per direction
- The Business Times, 8 Oct 2026 — RTS Link passenger services expected Feb 2027; ~40,000 daily passengers projected for 2027
- LTA & Ministry of Transport Malaysia joint release, 2 Oct 2026 — RTS Link service targeted for February 2027
- LHDN (Inland Revenue Board of Malaysia) — Real Property Gains Tax rates
- malaysiaproperty4u.com — Setia Sky 88 (asking rents)
- malaysiaproperty4u.com — Space Residency (asking rents)
Keep reading
Want the current price list for Coronade Twins?
WhatsApp me for the latest price list, available units, floor plans and the developer’s disclosure documents. Typical reply within 15 minutes, 9am–10pm.
Published 24 Nov 2026 · Last checked 24 Nov 2026 · Prices and rules change; confirm before you book.
New launch projects worth a look
- Kingfisher Putatan · Putatan
- Emerald Residence @ Teluk Kumbar, Penang · Teluk Kumbar
- Vi Residence @ Batu Kawan, Penang · Batu Kawan
- Sari Alamanda 4 @ Taman Bukit Teratai, Serendah, Rawang, Selangor · Rawang
- Sky Curve @ Taman Perling · Perling
- Residensi Bayu Damai · Kota Kinabalu
