Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches
Likas Bay, Kota Kinabalu · Under construction

The V by Jesselton

A 10-acre seafront joint venture with Yayasan Sabah, built by China State Construction — and every published layout sits under 1,100 sq ft.

Yayasan Sabah joint ventureChina State Construction18 published layouts, 425–1,090 sq ft100 m infinity poolGround broken 6 Oct 2025

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

3Suite towers, A B and C
18Published layouts
100 mInfinity pool, Level 6
Likas Bay seafront development artist impression at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah
The V at Likas Bay
Tower A artist impression at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah
Tower A
Answer block

The V by Jesselton at a glance

Two things on this table do most of the work. The first is that every published layout is between 425 and 1,090 sq ft — which, at the developer’s own indicated rate of RM650 per square foot, puts the entire development below RM1,000,000 a unit. That single arithmetic result is what decides the foreign-eligibility question further down this page. The second is the gross development value, which the developer itself restated from RM1.4 billion to RM1.5 billion between July and October 2025. Both of its own releases are still online.

Development
The V by JesseltonJesselton International Sdn Bhd 201001023716 (907488-P)
Structure
Joint venture with Yayasan SabahContractor: China State Construction
Site area
10 acresDeveloper’s own May 2025 figure
Components
Towers A, B and C, Corporate Suites, ShoppesFive components; the developer fact sheet also lists a Tower D
Published layouts
18, from 425 to 1,090 sq ftTower C tops out at 596 sq ft
Facility decks
Level 6, Level 9 and Level 4050 numbered items in total
Gross development value
RM1.4 billion, restated to RM1.5 billionDeveloper’s own July and October 2025 releases
Total units
Total not publishedDeveloper fact sheet, units per floor: Tower A 19, B 22, C 14, D 6
Height
Towers A–C 39 storeys, Tower D 40Developer fact sheet
Tenure
99-year leaseholdAbout 95 years remaining, per the developer fact sheet
Completion
54 months from SPADeveloper fact sheet; ground broken 6 October 2025
Which law protects you here

Everything this site says about KPKT does not apply to this project

Across the rest of this site, every development is checked against the National Housing Department register at teduh.kpkt.gov.my. This one is not in it, and never will be — not because anything is wrong, but because it is in Sabah.

WhereThe statuteWho administers it
Peninsular MalaysiaHousing Development (Control and Licensing) Act 1966 (Act 118)Ministry of Housing and Local Government (KPKT)
SabahHousing Development (Control and Licensing) Enactment 1978The Sabah state authority
SarawakHousing Development (Control and Licensing) Ordinance 2013The Sarawak state authority

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Housing is a state matter in Sabah and Sarawak under the terms on which they joined the Federation. The Sabah enactment is published by the State Attorney-General’s Chambers at sagc.sabah.gov.my.

What that changes for a buyer

The three things this site keeps pointing you at for a Peninsular project — the KPKT project code, the certified percentage complete, and the filed advertisement — have no equivalent you can look up online for a Sabah development. There is no TEDUH for Sabah.

So the checks have to be done by hand, and you should insist on them before any money moves:

  • Ask for the developer’s licence issued under the 1978 Enactment, and the advertising and sale permit issued with it. They exist; they are simply not published in a public portal.
  • Read which schedule your sale and purchase agreement uses. Sabah has its own prescribed contract. Do not assume the Peninsular Schedule G or H timelines or the 10% late-delivery formula carry over — check the clause, not the habit.
  • Ask which tribunal hears a dispute. The Peninsular Tribunal for Homebuyer Claims does not cover Sabah. Know the forum and its limit before you need it.

None of this makes a Sabah purchase worse. It makes it differently governed, and the difference is invisible until something goes wrong. A salesperson who cannot name the statute their own licence is issued under is telling you something.

Why this address

Six things that separate this from every other Kota Kinabalu launch

There are two names on the seafront in Kota Kinabalu this year with the word Jesselton in them, and they are unrelated companies on different bays. This is the Likas Bay one, and it is the one with a state foundation on the other side of the table.

🏛️

A state foundation is the joint venture partner

The developer states that The V is built in joint venture with Yayasan Sabah. In a state where land assembly is the hardest part of any coastal project, that is a materially different starting position from buying a parcel on the open market.

🏗️

China State Construction is the builder

Named by the developer at the 6 October 2025 groundbreaking. When a buyer asks me what most predicts on-time delivery, the honest answer is usually the contractor, not the brochure.

🌊

A wetland reserve is the reason the view holds

The developer claims permanent sea views. That claim is only worth something when something legally stops a building going up in front of you. Here the frontage is the bay itself, with the Kota Kinabalu Wetland Ramsar site two minutes away — a designation, not a promise from a sales office.

🏊

Fifty numbered facilities, on three decks

Towers A and B share a Level 6 podium of 28 items and a Level 40 Vibe and Vive Deck of four. Tower C has its own Level 9 deck of fifteen plus three at Level 40. The headline item is a 100-metre infinity pool, which the developer calls Borneo’s first.

📐

Every layout is published with a square footage

Eighteen codes, each with a built-up, a bedroom count and a bathroom count on the developer’s own tower pages. After a batch of Sabah projects that publish renders and nothing else, this is the exception — and it is the reason you can do real arithmetic further down this page.

⚠️

Tower C is not the family tower, whatever the copy says

The developer’s Tower C page promises wide frontages, panoramic views, perfect for multigenerational living. The schedule on that same page tops out at 596 sq ft with one bedroom. Both are official. Only one of them is a floor plan.

Project DNA

The whole development, decoded

Five sections, and they are not variations on a theme. Towers A and B share a facility podium and a layout schedule under alternate codes. Tower C is a separate proposition with its own deck at Level 9, its own areas, and not a single unit above one bedroom. The Corporate Suites and the Shoppes are commercial, which for a non-Malaysian is a different legal gate entirely.

10Acres, seafront site
18Published layouts
50Numbered facilities
1,090Sq ft, largest published

Three towers, two commercial components

Widest range

Tower A

The tower with the full spread, from a 425 sq ft studio to a 1,090 sq ft dual suite. It carries the Vibe Deck at Level 40 and shares the Level 6 podium with Tower B. Three separate 860 sq ft dual-suite codes sit here — D2, D3 and D5 — which almost always means the difference is orientation, not area.

9Layout codes
425Sq ft, smallest
1,090Sq ft, largest
A1 / A2 · 425 sq ft studioB1 · 525 sq ft single suiteC1 · 625 sq ft single suiteD2 / D3 / D5 · 860 sq ft dual suiteE1 / E2 · 1,090 sq ft dual suite
💬 Ask about Tower A
Serviced suites

Tower B

Marketed as lavish serviced suites, and it carries the Vive Deck at Level 40. The layout schedule is a subset of Tower A with the alternate code numbers — B2 instead of B1, C2 instead of C1, D1 instead of D2 — at identical square footages. If a stack in A is gone, its twin in B is the first place to look.

7Layout codes
1Dual suite code at 860 sq ft
40Level of the Vive Deck
A1 / A2 · 425 sq ft studioB2 · 525 sq ft single suiteC2 · 625 sq ft single suiteD1 · 860 sq ft dual suiteE1 / E2 · 1,090 sq ft dual suite
💬 Ask about Tower B
Smallest units

Tower C

A different building with a different rulebook. Every unit is a one-bedroom, and the largest is 596 sq ft. The type codes repeat the A, B and C letters used in the other towers but at different areas — A1 here is 447 sq ft, not 425. Its facility deck is at Level 9, not Level 6, and includes The Octo Park and a river view lounge that the other towers do not have.

6Layout codes
596Sq ft, largest in the tower
1Bedroom, every unit
A1 / A2 · 447 sq ft studioB1 / B2 · 579 sq ft single suiteC1 / C2 · 596 sq ft single suiteNo dual-key layout in this towerOwn facility deck at Level 9
💬 Ask about Tower C
Commercial

Corporate Suites

The office element of the scheme, given its own section on the project site. For a non-Malaysian this is the component with the hardest gate — Sabah commercial property is recorded as restricted to foreign companies incorporated in Malaysia. No floor areas or unit counts are published for it.

1Dedicated section on the site
0Floor areas published
0Unit counts published
Corporate office suitesCommercial classificationAreas not publishedForeign individuals restricted
💬 Ask about Corporate Suites
Commercial

Shoppes at The V

Curated retail at the base of the scheme. For a suite owner the relevant question is not what shops open — it is how the retail podium is apportioned into your maintenance charge. The developer fact sheet now gives the rates — shops RM0.36 + RM0.04 psf sinking fund, serviced suites RM0.45 + RM0.05, each plus 8% SST — but the apportionment formula itself is not published, and in mixed-use buildings it moves the monthly bill more than the headline rate does.

1Retail component
0Tenants announced
0Apportionment published
Ground-level curated retailTenant mix not announcedApportionment formula not publishedAsk before you sign
💬 Ask about Shoppes at The V

Fifty numbered items across three decks

Taken from the developer’s own numbered facility legends, tower by tower. The level allocation is read off those legends: Level 6 for the Towers A and B podium, Level 9 for Tower C, and Level 40 for the sky items in all three. It is worth having the level of each item confirmed in the sale and purchase agreement schedule rather than assumed from a web page — that is where facilities get value-engineered out.

Towers A and B · podium

Level 6 · 28 numbered items
  • Pickleball courts
  • Courtyard pavilion
  • Garden terrace
  • Outdoor parlour
  • Banquet gallery
  • Poolside lounge and bar
  • Entertainment lounge
  • Viewing deck
  • Aqua lounge
  • 100 m infinity pool
  • Sauna and steam room
  • Jacuzzi
  • Wading pool
  • Fitness centre
  • Poolside dining and alfresco
  • Swimming pool
  • Splash and play zone
  • Kids club
  • Sunken lounge
  • Wellness trail
  • Mail room
  • Nursing room
  • Vanity room
  • Concept dining
  • Guest reception hall
  • Conference room
  • Co-working lounge
  • Fitness studio

Towers A and B · sky deck

Level 40 · Vibe & Vive Deck
  • Sky gallery
  • Dining atelier
  • Sky bar
  • Zen garden

Tower C · own deck

Level 9 · 15 numbered items
  • Swimming pool
  • Wading pool
  • Garden pavilion
  • The Octo Park
  • River view lounge
  • Fitness centre
  • Pool terrace
  • Outdoor parlour
  • In-pool lounger
  • Locker room
  • Garden gallery
  • Garden terrace
  • Baby changing room
  • Jacuzzi
  • Viewing deck

Tower C · sky level

Level 40 · 3 items
  • Quiet lounge
  • Vanity room
  • Zen garden

Where the project is now

9 May 2025Project announced — 10-acre Likas Bay site, from RM650 psf
23 July 2025Private preview and unveiling — RM1.4 billion, from RM290,000
6 October 2025Groundbreaking — restated at RM1.5 billion, CSCEC named
27 November 2025Latest revision date on the published unit plans
2026Under construction — structural works reported by the developer
CompletionNot published by the developer
Layouts

All 18 The V by Jesselton floor plans

Eighteen layouts, and unlike most projects in this batch every single one is published with a built-up area, a bedroom count and a bathroom count. Use that. But read the tower letter, not just the type code: A1 is 425 sq ft in Towers A and B and 447 sq ft in Tower C; B1 is 525 in Tower A and 579 in Tower C; C1 is 625 in Tower A and 596 in Tower C. Three code collisions in one development is three chances to book the wrong unit.

Type A1 layout plan, 425 sq ft studio in Towers A and B at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type A1 · 425 sq ft · Towers A and B

Studio · 1 ensuite · 1 bathroom · Towers A and B

🛏 Studio🛁 1 Bath📐 425 sq ft
Get this floor plan
Type A2 layout plan, 425 sq ft studio in Towers A and B at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type A2 · 425 sq ft · Towers A and B

Studio · 1 ensuite · 1 bathroom · same area as A1

🛏 Studio🛁 1 Bath📐 425 sq ft
Get this floor plan
Type B1 layout plan, 525 sq ft single suite in Tower A at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type B1 · 525 sq ft · Tower A

Single suite · 1 ensuite · 1 bathroom · Tower A only

🛏 1 Bed🛁 1 Bath📐 525 sq ft
Get this floor plan
Type B2 layout plan, 525 sq ft single suite in Tower B at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type B2 · 525 sq ft · Tower B

Single suite · 1 ensuite · 1 bathroom · Tower B only

🛏 1 Bed🛁 1 Bath📐 525 sq ft
Get this floor plan
Type C1 layout plan, 625 sq ft single suite in Tower A at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type C1 · 625 sq ft · Tower A

Single suite · 1 ensuite · 1 bathroom · Tower A only

🛏 1 Bed🛁 1 Bath📐 625 sq ft
Get this floor plan
Type C2 layout plan, 625 sq ft single suite in Tower B at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type C2 · 625 sq ft · Tower B

Single suite · 1 ensuite · 1 bathroom · Tower B only

🛏 1 Bed🛁 1 Bath📐 625 sq ft
Get this floor plan
Type D1 layout plan, 860 sq ft dual suite in Tower B at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type D1 · 860 sq ft dual suite · Tower B

Dual suite · 2 ensuite · 2 bathrooms · Tower B only

🔑 Dual suite🛏 2 Bed📐 860 sq ft
Get this floor plan
Type D2 layout plan, 860 sq ft dual suite in Tower A at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type D2 · 860 sq ft dual suite · Tower A

Dual suite · 2 ensuite · 2 bathrooms · Tower A

🔑 Dual suite🛏 2 Bed📐 860 sq ft
Get this floor plan
Type D3 layout plan, 860 sq ft dual suite in Tower A at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type D3 · 860 sq ft dual suite · Tower A

Dual suite · 2 ensuite · 2 bathrooms · Tower A

🔑 Dual suite🛏 2 Bed📐 860 sq ft
Get this floor plan
Type D5 layout plan, 860 sq ft dual suite in Tower A at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type D5 · 860 sq ft dual suite · Tower A

Dual suite · 2 ensuite · 2 bathrooms · Tower A

🔑 Dual suite🛏 2 Bed📐 860 sq ft
Get this floor plan
Type E1 layout plan, 1,090 sq ft dual suite at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type E1 · 1,090 sq ft dual suite · Towers A and B

Dual suite · 2 ensuite · 2 bathrooms · largest published layout

🔑 Dual suite🛏 2 Bed📐 1,090 sq ft
Get this floor plan
Type E2 layout plan, 1,090 sq ft dual suite at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Type E2 · 1,090 sq ft dual suite · Towers A and B

Dual suite · 2 ensuite · 2 bathrooms · same area as E1

🔑 Dual suite🛏 2 Bed📐 1,090 sq ft
Get this floor plan
Tower C Type A1 layout plan, 447 sq ft studio in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type A1 · 447 sq ft

Studio · 1 ensuite · 1 bathroom · Tower C

🛏 Studio🛁 1 Bath📐 447 sq ft
Get this floor plan
Tower C Type A2 layout plan, 447 sq ft studio in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type A2 · 447 sq ft

Studio · 1 ensuite · 1 bathroom · Tower C

🛏 Studio🛁 1 Bath📐 447 sq ft
Get this floor plan
Tower C Type B1 layout plan, 579 sq ft single suite in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type B1 · 579 sq ft

Single suite · 1 ensuite · 1 bathroom · Tower C

🛏 1 Bed🛁 1 Bath📐 579 sq ft
Get this floor plan
Tower C Type B2 layout plan, 579 sq ft single suite in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type B2 · 579 sq ft

Single suite · 1 ensuite · 1 bathroom · Tower C

🛏 1 Bed🛁 1 Bath📐 579 sq ft
Get this floor plan
Tower C Type C1 layout plan, 596 sq ft single suite in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type C1 · 596 sq ft

Single suite · 1 ensuite · 1 bathroom · largest in Tower C

🛏 1 Bed🛁 1 Bath📐 596 sq ft
Get this floor plan
Tower C Type C2 layout plan, 596 sq ft single suite in Tower C at The V by Jesselton, Likas Bay, Kota Kinabalu, Sabah

Tower C Type C2 · 596 sq ft

Single suite · 1 ensuite · 1 bathroom · Tower C

🛏 1 Bed🛁 1 Bath📐 596 sq ft
Get this floor plan
Location & connectivity

Where The V by Jesselton sits

Likas Bay, off Jalan Tun Fuad Stephens, Kota Kinabalu — the bay north of the city centre, along the 7 km cycling and pedestrian promenade, with the Sabah International Convention Centre and Likas Sports Complex as the nearest civic anchors.

Open in Google Maps →
📍 Likas Bay, off Jalan Tun Fuad Stephens88400 Kota Kinabalu

The developer publishes a location diagram but no coordinate and no lot number, so the map above is set to Likas Bay on Jalan Tun Fuad Stephens rather than to a pin I would have to guess at. The sales gallery is at a different address entirely — Jalan Bersatu, Damai, 88300 Kota Kinabalu — so do not navigate to the gallery expecting to see the site.

Likas Bay is not the city centre, and that is the point. The developer’s own tiering puts the Kota Kinabalu central business district, the ferry terminal and the duty free at five minutes by car, while the convention centre, the beach park, the sports complex and the Kota Kinabalu Wetland Ramsar site are at two. If your buying case is walk-to-work in the CBD, this is not that address. If your buying case is a permanent water frontage with a protected wetland and a 7 km promenade next door, it is difficult to replicate in this city.
💬 Ask me about the real drive times
  • 7 km Likas Bay cycling and pedestrian promenadeDirectdeveloper’s tier one
  • Sabah Hakka Association banquet hallDirectdeveloper’s tier one
  • KPD Fresh MartDirectdeveloper’s tier one
  • Sabah International Convention Centre2 minby car, developer’s figure
  • Likas Bay Beach Park and Likas Sports Complex2 minby car, developer’s figure
  • Kota Kinabalu Wetland Ramsar site2 minby car, developer’s figure
  • Kota Kinabalu central business district5 minby car, developer’s figure
  • Jesselton Ferry Terminal and duty free5 minby car, developer’s figure
  • Kota Kinabalu Floating Mosque5 minby car, developer’s figure
  • Universiti Malaysia Sabah10 minby car, developer’s figure
  • Menara Kinabalu and Menara Tun Mustapha10 minby car, developer’s figure
The government record

This project is not in the federal housing register — and the reason is jurisdictional, not a red flag

Every other project page on this website carries a table read from teduh.kpkt.gov.my, the housing register kept by the federal Ministry of Housing and Local Government: permit number, licensed developer, unit count, permitted price band, certified construction percentage, project status.

There is no such table here, and I would rather explain why than leave a gap you might misread.

What I searched, and what came back

I searched the federal register nationally for “Jesselton”. Zero results — not one record anywhere in the database.

That is not evidence about this development. It is evidence about where the register’s coverage stops.

Sabah is not covered by the federal register

Housing development licensing in Sabah is governed by Sabah’s own state legislation and administered by the state, not by the federal ministry. The Housing Development (Control and Licensing) Act 1966 — the law that produces the advertising permits, the statutory sale and purchase agreement and the certified progress returns this website reads for every peninsular project — applies to Peninsular Malaysia. Sabah has its own enactment and its own controller of housing.

The federal register therefore contains no Sabah projects by design. Searching it for a Kota Kinabalu development and finding nothing tells you exactly as much as searching a Selangor directory for a Johor address.

What this means for you in practice

You are not less protected. You are protected under a different statute, by a different authority, and you have to ask a different office.

Ask the developer, in writing, for its Sabah developer’s licence number and its Sabah advertising permit number. These exist and they are required. They should appear on the brochure and in the sale and purchase agreement.

Verify them with the Sabah state housing authority, not the federal ministry. The federal ministry cannot confirm a Sabah licence, and will say so.

Read the sale and purchase agreement rather than assuming it mirrors the peninsular one. The statutory schedules, delivery period and late-delivery compensation are set by Sabah’s own subsidiary legislation. Do not assume the figures published for peninsular projects — including elsewhere on this website — apply here. Have your own lawyer confirm what your agreement says about the completion date and what happens if it slips.

Foreign buyers: assume nothing carries over

Everything this website publishes about non-citizen purchase thresholds, state consent and exempt zones is state-specific. Johor is not Selangor, Selangor is not Penang, and none of them is Sabah.

Sabah sets its own minimum purchase price for non-citizens and runs its own consent process, and it has land categories with restrictions that have no peninsular equivalent. Get the current Sabah position from a Sabah-qualified lawyer before committing to anything, and do not rely on a peninsular figure — including any figure elsewhere on this site.

Why I am publishing an absence

Because the alternative is worse. If this page simply had no register section, a careful reader would notice the gap and wonder what I had failed to find. And a reader who searched the federal register themselves would get zero results and could easily read that as a warning.

It is not a warning. It is a jurisdictional boundary — and now you know where it sits and what to ask for instead.

Federal register searched at teduh.kpkt.gov.my on 27 August 2026. Search term “Jesselton”, national scope, zero results.

Track record

About Jesselton International Sdn Bhd

Jesselton International Sdn Bhd, company number 201001023716 (907488-P), is a Kota Kinabalu developer formerly known as Jesselton Group. Its executive chairman is Tan Sri David Chu. The delivery record it points to is local and checkable: Jesselton Residences, Jesselton Mall and the Jesselton Twin Towers — completed buildings in this city, not a pipeline.

The awards it publishes are third-party and dated. Star Property Awards 2019, The Borneo Star, for Jesselton Twin Towers. Star Property Awards 2019, The Poseidon Award for best waterfront development, for Jesselton Residences. PAM Sabah Awards 2024, Silver in commercial mixed development, for Jesselton Residences. The Edge Malaysia 2024 Best Managed and Sustainable Property Awards, bronze, for Jesselton Residences and Jesselton Mall. An architecture institute award and a building-management award are different things, and this developer has one of each — that combination is rarer than it sounds.

The V is a joint venture with Yayasan Sabah, the Sabah Foundation, announced by the developer itself. That matters in two directions. It is a strong signal on land assembly and on approvals, because the state foundation is not an ordinary counterparty. It also means the land history is worth asking about specifically: ask which entity holds the title, whether it is a Country Lease or Town Lease under the Sabah Land Ordinance, what the unexpired term is, and whether any restriction in interest sits on it. A joint venture structure does not answer any of those on its own.

The main contractor is China State Construction (CSCEC), named by the developer at the groundbreaking. For a buyer, the contractor is often more predictive of delivery than the developer’s balance sheet, and CSCEC is one of the largest builders in the world.

Now the number that moved. The developer’s own unveiling release of 23 July 2025 describes The V as a RM1.4 billion integrated waterfront development. Its own groundbreaking release of 6 October 2025 describes the same project as RM1.5 billion. Both are on the developer’s website today. A gross development value can legitimately be restated as a scheme is finalised, and RM100 million on RM1.4 billion is seven per cent. I point it out because it is exactly the kind of drift that ends up quoted as a fact for years, and because it tells you the scheme was still being sized between July and October 2025.

The same pattern shows up on the site area: 10 acres in the developer’s own May 2025 announcement, 10.04 acres in some later third-party write-ups. Use 10 acres, and get the exact area from the title.

One more disclosure gap to close before you book. The developer publishes no developer’s licence number and no advertising and sale permit number online for this project, and its own site progress module returned nothing for the period I checked despite construction having started. Ask for the licence number, the permit number and the current progress claim schedule in writing.

I searched for abandonment, winding-up and delay litigation involving Jesselton International and found nothing adverse. That is no adverse record found, which is not the same as a clean record.

Straight answers

Frequently asked questions

Can a foreigner buy at The V?

Do the arithmetic before you do anything else. The developer published an estimated selling price from RM650 per square foot in May 2025 and a starting price from RM290,000 in July 2025. Its largest published layout is 1,090 sq ft. At the developer’s own indicated rate, that top layout works out at roughly RM708,500 — which is below RM1,000,000.

That matters because of a contradiction I am not going to resolve for you. The Bar Council Conveyancing Practice Committee’s state table records Sabah’s minimum purchase price for residential property acquired by a non-citizen as RM1,000,000. A separate figure of RM600,000 for high-rise strata circulates widely, attributed to a state circular I have not been able to read in text form. Under the first figure, essentially nothing in this development would be transactable to a foreigner. Under the second, most of it would be.

Separately, the Corporate Suites are a different question again. Sabah commercial property is recorded as restricted to foreign companies incorporated in Malaysia, including property intended for tourism use — so an individual foreign buyer is likely out of that component entirely, at any price.

If you hold a Malaysian passport, none of this applies and the whole schedule is open to you. If you do not — and Malaysian permanent residents are treated as foreign interest here — get a written ruling from the Sabah Lands and Surveys Department, through a Sabah conveyancing solicitor, for your specific unit and price, before you pay a booking fee.

Is the RM1.4 billion figure or the RM1.5 billion figure correct?

Both come from the developer, three months apart, and both are still on its website. The unveiling release dated 23 July 2025 says RM1.4 billion. The groundbreaking release dated 6 October 2025 says RM1.5 billion.

The later figure is the one to use, because it is the later figure — but the honest reading is that the scheme was still being sized between those two dates. Gross development value is a developer’s planning number, not a price you pay, so it should not change your decision. It should change how much weight you put on any other number published in that same window.

How many units are there and how tall are the towers?

The total unit count is still not published as a single number, but the developer fact sheet now sets the building out tower by tower.

Height: Towers A, B and C are 39 storeys; Tower D is 40 storeys. The development has five components in all. The facility legends place a deck at Level 40 in Towers A, B and C, which on a 39-storey tower is most likely the roof deck — confirm the floor numbering on the plans.

Units per floor: Tower A 19, Tower B 22, Tower C 14, Tower D 6, and the fact sheet lists 5 lifts. Multiplying units per floor by storeys does not give a reliable total, because podium, facility and commercial floors carry no suites.

The exact unit count per tower appears on the advertising and sale permit. Ask for the permit, not for a brochure.

What does a joint venture with Yayasan Sabah mean for me as a buyer?

Practically, it usually means the land and the approvals were never the bottleneck. Yayasan Sabah is the state foundation, and a coastal parcel of this size in Kota Kinabalu does not come onto the open market often.

Legally, it means you should ask a very specific question rather than assuming comfort: which entity is the registered proprietor of the title, is it a Country Lease or a Town Lease under the Sabah Land Ordinance, what is the unexpired term, and is there a restriction in interest endorsed on it? A restriction in interest is the line that determines whether a transfer to a non-citizen can be registered at all.

Ask also whether the units are being sold under a sale and purchase agreement with the developer directly, and who signs as vendor. In joint venture structures those are not always the same party.

Which tower should I be looking at?

Decide by unit size first, because the towers do not overlap the way the marketing implies.

Tower A has the full range, 425 to 1,090 sq ft, and three of the four 860 sq ft dual-suite codes. Tower B is a serviced-suite tower with the same areas under alternate codes — B2 for B1, C2 for C1, D1 for D2 — so it is where you look when a Tower A stack has gone. Tower C is a different animal: six codes, every one a one-bedroom, the largest 596 sq ft, with its own facility deck at Level 9 rather than the shared Level 6 podium.

There is a real trap here. The same type codes appear in more than one tower at different areas. A1 is 425 sq ft in Towers A and B but 447 sq ft in Tower C. B1 is 525 in Tower A and 579 in Tower C. C1 is 625 in Tower A and 596 in Tower C. Check the tower letter on the booking form, every time.

Are the sea views really permanent?

The developer lists permanent sea views as a headline feature. Treat that as a design statement, then test it.

What supports it: the site fronts Likas Bay directly, and the Kota Kinabalu Wetland nearby is a Ramsar-designated site, which is a legal conservation status rather than a marketing promise. Along a 7 km promenade with a protected wetland behind it, the odds of a tower rising directly in front of a bay-facing unit are genuinely lower than in the city centre.

What does not support it: no developer controls land it does not own. If your purchase decision rests entirely on the view, ask which stacks face the water squarely, ask what is zoned on the parcels immediately in front, and put the unit number and orientation in writing on the booking form.

What is the completion date and the price list?

The developer fact sheet gives completion as 54 months from the date of the sale and purchase agreement. Ground was broken on 6 October 2025 with China State Construction as contractor, and the developer describes structural works as progressing through 2026. Because the clock starts on your own SPA date, a buyer who signs in October 2026 is looking at around April 2031 — work out your date before you sign, and check that the agreement itself states the same 54 months, because that clause is the only completion date that binds anyone.

On price, what exists publicly is an estimated RM650 per square foot from May 2025 and a from-RM290,000 headline from July 2025. Neither is a price list, and both are more than a year old. I get the live schedule and the current stack availability from the developer. Message me and I will send this week’s version, tower by tower.

Is this suitable for short-stay letting?

The developer designs for it — short-stay ready is one of its eight headline features, and the location tiering leans on the convention centre, the beach park and the wetland reserve rather than on an office district.

Two cautions. First, no operator is named for The V, unlike some other Kota Kinabalu projects where an in-house hospitality arm is contracted from day one. Design intent is not an operating agreement — if you are relying on managed letting, ask who will run it and on what terms.

Second, short-stay letting in a strata building is governed by the building’s house rules and by local authority policy, both of which can change after you buy. Ask whether the management corporation by-laws being drafted will permit nightly letting, and get the answer in writing rather than from a sales conversation.

What taxes and costs does a non-Malaysian face?

Stamp duty on transfer: a flat 8% has applied to non-citizens on residential property since 1 January 2026, and the legislation names service apartments and SOHO expressly. On a RM700,000 suite that is RM56,000 on top of the price.

Real property gains tax on exit: 30% for a disposal in years one to five, 10% from year six onwards, with no zero band at any holding period. The Bar Council circular records a retention sum of 7% of the disposal price held at the point of sale.

Financing and consent: foreign buyers in Malaysia typically obtain 60% to 70% margin. Add state consent costs, legal fees on the consent application, and the cost of the written eligibility ruling you should be getting before you book. Budget those as a block, not as an afterthought.

Does a unit come with a car park bay?

No. The developer fact sheet states that units come without a car park bay. Parking is by season pass, which the fact sheet estimates at around RM150 per month — an estimate, not a fixed rate.

If you need a car, budget that as a running cost alongside the service charge, and if you plan to rent the unit out, remember your tenant faces the same cost. Ask whether season parking is assured for owners or first-come, and who sets the rate.

What are the service charge and sinking fund?

The developer fact sheet gives these rates per square foot:

  • Serviced suites: RM0.45 service charge + RM0.05 sinking fund
  • Office: RM0.30 + RM0.03
  • Shops: RM0.36 + RM0.04

Each is subject to 8% SST on top. For a 600 sq ft suite that works out to RM300 a month before tax, about RM324 with SST.

These are the developer’s initial figures; the actual charge is set by the management body after handover and can change. The formula that apportions shared costs between suites, offices and shops is still not published — ask for it.

Get the unit count, the tenure and a written eligibility ruling

Those three are the gaps on this project, and all three are answerable — the first two from the advertising and sale permit, the third from the Sabah Lands and Surveys Department through a Sabah solicitor. Tell me your passport, your budget and whether you want a bay-facing stack, and I will come back with the live price list for the tower that actually fits.

No agent fee payable by the buyer on new developer launches · Foreign eligibility in Sabah must be confirmed in writing before any booking fee

Louis Koh

11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文

I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.

💬 Message Louis

Published 2026-08-12 · Last verified 2026-08-12 against Jesselton International Sdn Bhd's published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

The V by JesseltonLikas Bay · 425–1,090 sq ft · 18 layouts · Yayasan Sabah joint venture
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.