19085-1 – 19085-7 · 2,325 licensed homes · Daerah Kuala Langat, not Daerah Klangtwentyfive7 @ Kota Kemuning — Telok Panglima Garang, Daerah Kuala Langat, Selangor: KPKT licence 19085, seven registered phases, 2,325 licensed homes, and the fact no portal prints — “twentyfive7” is the registered name of nothing
The township is licensed to GAMUDA LAND (KEMUNING) SDN. BHD., 200201030459 (598122-P) — a registration number taken from the filed brochures, because the KPKT TEDUH register carries no company-registration field for this developer. Seven schemes sit on licence 19085, carrying 2,325 licensed homes, and “twentyfive7” is the registered name of none of them: five of the seven are registered under the identical generic string Gamuda Kemuning, so a client searching the public register by name cannot tell Phase 1 from Lucent from Luxura from Levane — only the serial separates them, which is why this page prints the register code beside every phase name. All seven are filed on Schedule H and every permit from 19085-2 onward carries the -(S) strata tail: these landed houses are on strata title, which is unusual, which no marketing surface mentions, and which — unlike a freehold individual-title landed scheme — is exactly what admits a foreign buyer in Selangor. Open and selling now: THE CLOVE SIGNATURE, registered Gamuda Kemuning 25.7, project code 19085-7 — 300 homes, 13.23% – 49.58% built, filed statutory band RM1,922,800 – RM3,909,800, vacant possession 25 January 2029. Also still selling: QUAYSIDE PLAZA, 19085-6, 465 serviced-apartment units — and the register flags that scheme Lewat, late, at 73.54% built on 437 of its 465 units, with its permit expiring on 27 October 2026.
-(S) permit tail · 36 months = STRATA-titled landed5 completed phases, 5 delivered INSIDE the governing date — but 2 of them needed extensions2 phases (524 homes) took NO extension and beat their ORIGINAL dates19085-6 Quayside Plaza flagged Lewat at 73.54% while badged “Newly Launched”19085-6 permit expires 27 Oct 2026 — and the precinct is still sellingThe Clove Signature 19085-7 · 300 homes · register prints an (N) suffixLevane 19085-5 is COMPLETE — CCC 26 Jun 2026, handed over, not a launchResidential coverage 100% — walk and count agree, no dormant twin99-year leasehold — THREE lease expiries: 2116, 2122, 2124Selangor ZONE 2, not Zone 1 — foreign floor still RM2,000,000, by a different routeBroadleaf @ Kota Kemuning is a DIFFERENT developer (BCB, code 13053) — no figure of its is hereKota Kemuning proper is Hicom-Gamuda, code 6784 — a different licensee, kept off this pageSmart Township Malaysia 2025 GOLD — to the township; ZERO precinct-level awardsGreenRE: three PROVISIONAL rows on the residential tool, advertised by nobodymempunyaiKesalahan: null · 0 sick projects · 0 abandonedEvery figure on this page is traced to a named published source: the public KPKT TEDUH register developer and project records for 19085 and 19085-1 through 19085-7, the filed HIMS advertisement documents, the GreenRE certification register, the developer’s own pages, and named press. Where nothing is published, this page says so instead of filling the gap — and it carries no figure belonging to any other township, any other licensee or any other Gamuda development.
-(S) advertising and sales permit tail and a 36-month delivery period. Not one marketing surface says the word strata — and it is the whole foreign-buyer answerKeluasan Tanah is NOT PRINTED in any of the six filed brochures and the register’s keluasan is a built-up in m² on two records
19085-7) main render — published as the header image on the developer’s own The Clove Signature page, so the precinct is caption-published. The subject within the precinct is NOT established: the host publishes the alt text “Header image” and nothing more. This is the open landed launch only. It depicts none of the other six registered phases.
19085-5) main render — filename names the precinct, so the precinct is caption-published; its alt is also only “Header image”, so no subject is assignable. Levane is COMPLETE and handed over — CCC 26 June 2026, vacant possession 30 June 2026, 35 days inside its ORIGINAL date with no extension at all. It is not a launch and this page does not present it as one.
twentyfive7 at a glance — the filed particulars for all seven phases, and what is simply not published
This is one township page covering all seven registered phases of licence 19085, which is what lets it carry the finding no consumer source does: the delivery record of seven registered schemes under one licence. Every cell below is either printed in a filed advertisement document, printed in the public KPKT TEDUH register, printed on the developer’s own pages, or marked NOT PUBLISHED. Two corrections this page carries, because every marketing surface gets them wrong: this is NOT Kota Kemuning proper and NOT Daerah Klang — the filed plan-approval prefixes run MDKL/JKB— then MPKL/JKB—, i.e. Majlis Perbandaran Kuala Langat, Daerah Kuala Langat; and Broadleaf — Kota Kemuning is a separate development by a different developer, BCB Development Sdn Bhd (code 13053), at Home Tree in Daerah Klang — not one of its figures appears anywhere on this page.
- Registered schemes and project codes
- Seven separate register records,
19085-1–19085-7FIVE of the seven are registered under the identical string Gamuda Kemuning —-1,-2,-3,-4and-5. The other two are Quayside Plaza (-6) and Gamuda Kemuning 25.7 (-7). The marketing names — The Clove Signature, Levane, Lucent, Luxura, The Amber Residence — appear in NO filing at all. - Licensed developer
- GAMUDA LAND (KEMUNING) SDN. BHD., 200201030459 (598122-P)Developer code 19085. The company registration number is printed in the filed brochures of
-2,-3,-4,-5,-6and-7— it is NOT in the TEDUH developer record, which carries no company-registration field here. Brand Gamuda Land, the property arm of Gamuda Berhad, 197601003632 (29579-T). This is a special-purpose vehicle: no joint venture, landowner or vendor is named in any filing, any register field or any press piece — so the JV question is unanswered, not answered negatively. - Developer licence
19085/07-2027/0599(A), valid 19 Jul 2022 – 18 Jul 2027 — currentThe previous licence recoverable from the brochures is19085/07-2022/0052(A), 19 Jul 2021 – 18 Jul 2022 — the new licence begins the day after the old one ends, so it was renewed forward, not lapsed. The19085-2and19085-3brochures still print the expired 2021–22 licence. Register:statusPemaju: Aktif,mempunyaiKesalahan: null, 0 sick projects, 0 abandoned,jumlahProjek: 7.- Licensed homes, and coverage
- 2,325 units across seven phases — 100% licensed279 (
-1) + 596 (-2) + 161 (-3) + 156 (-4) + 368 (-5) + 465 (-6) + 300 (-7). The serial walk runs-1through-7all live,19085-8returns a client error, andjumlahProjekagrees at 7 — walk and count agree. The component rows sum tobilanganUniton all seven records. No dormant twin, no cancelled-permit record. Credit the developer for that. - Filed contract schedule and delivery period
- Schedule H on all seven ·
tempohAsal36 months on all sevenUnusual for landed product, where the normal pattern is Schedule G and 24 months. Here the landed phases are strata title, so they take Schedule H and a 36-month delivery period, strata common property, a management corporation, a sinking fund and service charges.19085-1’s permit19085-1/07-2021/02640(P)carries a(P)suffix with no-(L)or-(S)tail, so on that one phase the free landed-versus-strata read is unavailable; its Schedule H is read from the register. - Open landed launch
- THE CLOVE SIGNATURE — registered Gamuda Kemuning 25.7,
19085-7, 300 homesFiledRumah Kluster2 and 3 storey plusRumah Berkembar2 storey. Permit19085-7/01-2029/0055(N)-(S), valid 21 Jan 2026 – 20 Jan 2029. 13.23% – 49.58% built. vacant possession 25 January 2029, and the filed brochure’s January 2029 agrees with the register — two sources, no contradiction, which this page credits. The register prints the permit suffix(N)on this, the licence’s only actively-selling residential phase — recorded exactly as printed, and flagged as a question to put to the developer, not as a defect. - Still selling, and flagged late
- QUAYSIDE PLAZA,
19085-6, 465 units — register overall statusLewatPangsapuri Perkhidmatan, 36 storeys. Component rows: 3 units at 94.17% built (Lancar), 25 units at 92.30% (Lancar) and 437 units at 73.54%, flaggedLewat. vacant possession falls due 31 January 2027 andpindaanTempohSerahKosong: Tidak— no approved extension sits on the record. Its permit19085-6/10-2026/1187(A)-(S)expires 27 October 2026. The filed brochure prints an expected completion of Oktober 2026, which matches neither. The developer badges this precinct “Newly Launched”. - Completed and handed over
- Five phases:
-1,-2,-3,-4,-5— 1,560 homesLevane Residences (19085-5, 368 homes) is COMPLETE — CCC 26 June 2026, vacant possession 30 June 2026, 35 days inside its ORIGINAL date with no extension. Luxura Residence (19085-4, 156 homes): CCC 9 June 2025, VP 9 September 2025, 165 days inside its ORIGINAL date with no extension. Phase 1 (-1) CCC 21 Sep 2020; The Amber Residence (-2) VP 10 Aug 2022; Lucent (-3, probable) VP 20 Jan 2023. This page treats these as completed stock, never as launches. - Tenure, and the three lease expiries
- 99-year leasehold — THREE different expiry dates19 April 2116 on
-2,-3,-4and-6(about 89.5 years left) · 30 July 2122 on-5(about 95.8 years) · 26 November 2124 on-7(about 98.1 years). So a buyer’s remaining term varies by up to 8.6 years depending on which precinct they buy, and no source anywhere tabulates it. It bears on resale and on financing tenor.19085-1: NOT PRINTED — no filed advertisement has ever existed for it, so its lease expiry is UNKNOWN for 279 homes. Ask for a title search. - Foreign buyers — title
- Permitted on title, which is the unusual part — these are landed homes on strata titleSelangor permits foreign purchase of strata and landed-strata only, and standard individual-title landed is not permitted (
propcashflow.myciting Pekeliling PTG Selangor Bil. 1/2014; iProperty; and IQI’s own land guide atiqiglobal.com/blog/buying-land-in-malaysia-for-foreigners/). All seven phases here are Jadual H with-(S)permit tails, so on title they sit on the permitted side of the line — the opposite of a freehold individual-title landed scheme, where a foreign buyer is barred outright. But a Sekatan Kepentingan is filed on all six filings, so State Authority consent is a separate condition on top. - Foreign buyers — zone and price floor
- Daerah Kuala Langat is Selangor ZONE 2 — floor RM2,000,000A correction worth having: the zone is 2, not 1. Zone 1 (Petaling, Gombak, Hulu Langat, Sepang, Klang) and Zone 2 (Kuala Selangor, Kuala Langat) both carry RM2,000,000; Zone 3 (Hulu Selangor, Sabak Bernam) is RM1,000,000. So the figure is the same but the route is different, and a client told “Zone 1” will not find Kuala Langat in that list. It is still double the Kuala Lumpur / Federal Territory figure of RM1,000,000 with EPU consent. PTG Selangor publishes no reachable circular — confirm with PTGS before committing.
- Against the RM2,000,000 floor, by phase
- The Clove Signature: 252 of 300 clear · 48 do notThe 48 are types B1 and B1(M), 24 units each, at a flat RM1,922,800 — 96.1% of the floor. Quayside Plaza 3 of 465 clear (the Jenis A row at RM2,126,800 flat); Luxura all 156 straddle; Lucent all 161 straddle; Levane 17 of 368 clear, 220 sit entirely below and 131 straddle; The Amber Residence 0 of 596 — its dearest filed unit is 48.8% of the floor; Phase 1 86 of 279 clear. 604 of the 2,325 licensed units straddle the floor and cannot be resolved from any public document, because no per-UNIT price is filed anywhere — only per-type minima and maxima. That number is undeterminable and this page says so rather than estimating it.
- Filed statutory price bands
- RM232,500 – RM3,909,800 across the licence — filed and registry figures, not a price listBy phase:
-1RM1,021,800–3,389,970 (registry) ·-2RM232,500–950,040 (registry) / RM250,000–976,040 (filed) ·-3RM1,384,416–3,178,560 (registry) ·-4RM1,551,800–2,913,800 ·-5RM930,800–2,736,800 ·-6RM250,000–2,126,800 ·-7RM1,922,800–3,909,800. These are the legally filed statutory Unit Selling Price ranges and the public government registry bands. They are not a price list, not a quotation and not an offer. - Band integrity, checked row by row
- 31 of 31 rows across four phases match the register to the sen — and two phases do notClean:
-714 of 14,-510 of 10,-44 of 4,-63 of 3 — no splice, no orphan figure, no stale minimum, and the unit counts reconcile too. That deserves saying. But19085-3’s register band matches NEITHER filed figure on all four of its rows, including an orphan carrying sen (RM1,717,018.08) that appears in no filed document; and19085-2’s register minimum (RM232,500) sits BELOW its filed minimum (RM250,000) — the reverse of the usual direction. Read every row; do not generalise from the clean four. - Licensed GDV, summed from the filed and registry figures
- RM2.47 billion – RM3.90 billionSum of the per-type minima RM2,467,703,958.40; sum of the maxima RM3,903,539,100, over 2,325 units. These are this page’s own sums of the statutory and registry per-type figures, labelled as such — no township GDV is published by anybody, not by the developer, not in The Edge’s 2017 launch piece, not in any portal record. And the figure covers the licensed residential content only: the mall, the two commercial precincts and the retail podiums are not licensed and are not in it.
- Density
- NOT COMPUTABLE FOR ANY PHASE — and this page prints no density figure
Keluasan Tanahis NOT PRINTED in any of the six filed brochures. The register’skeluasanreads0 mpson-4,-5,-6and-7, and on-1and-2it is a BUILT-UP in square metres, not a land area (-1reads 197–341 mps, exactly echoing its own component rows;-2reads 61 mps, about 657 sq ft, matching a portal’s Type C built-up). The 257-acre township figure is well corroborated on two independent surfaces nine years apart, but it cannot be cross-checked to any phase and it is the trap on a township page — dividing 2,325 homes by 257 acres is meaningless twice over, so this page refuses it. - Green certification
- Three GreenRE rows, all PROVISIONAL, all on the residential tool — and the developer advertises none of itQuayside Plaza, TwentyFive7 — SILVER, provisional, 22 July 2024,
RES v3.3· The Clove Signature — BRONZE, provisional, 30 July 2025 · Levane Residences (Phase 3B) — BRONZE, provisional, 4 June 2025, all to Gamuda Land (Kemuning) Sdn Bhd. All three areRES, the RESIDENTIAL tool, so the ratings attach to homes — unlike a non-residential community-complex rating, which would say nothing about any house. “Provisional” every time; none is a final certification. Andgamudaland.com.myadvertises nothing green on the township page or any precinct page — a real, unadvertised rating, which this page credits. - Awards
- ONE award, and it is the township’s — Smart Township Malaysia 2025, GOLD, awarded to “twentyfive7”ZERO awards at precinct level. Nothing has been awarded to The Clove Signature, Levane, Lucent, Luxura, The Amber Residence, Quayside Plaza, Quayside Square or Quayside Mall. The awarding body is not named on the developer’s own accolades page, so this page does not name one — the image filenames suggest a planning body, which is an inference and is not stated as fact. The page has a “Load More” button, so the list may not be complete. No QLASSIC score was found for any phase.
- Affordable-housing component
- TESTED, AND THE ANSWER IS NO
19085-6’s 437-unit row runs from RM250,000 and19085-2’s 321-unit block from RM232,500, which is exactly the signature of an affordable allocation. But there is NO-RMM,-AH,-NPTor-OMUtype-code pair in either filing, no duplicated built-up at two prices, no register flag for Rumah Selangorku, and no source — not the filings, not The Edge, not StarProperty — mentions affordable housing at all. So no filed affordable allocation is identifiable on this licence. What remains unexplained is the RM250,000 entry against a 550 sq ft filed built-up, about RM455 per sq ft, against RM1,037,800 at the top of the same row. The anomaly is recorded, not explained. - The Bumiputera allocation field in the filings
- The field EXISTS. Its value is NOT PUBLISHED ON THIS PAGE, under this agency’s absolute compliance instructionThe filed advertisement particulars for this licence carry such a field, under the Malay heading
Diskaun. This page records only that the field exists and that it carries a value, and publishes no value for it. See “what this page does not publish, and why” in the register section below, which names this cell as the one deliberate exception and names every place the term appears. - Location, as filed
- Lot 43495, Persiaran Oleander, 42500 Telok Panglima Garang, Daerah Kuala Langat, SelangorNot Kota Kemuning proper and not Daerah Klang. Filed plan-approval prefixes:
MDKL/JKB/2/4/1242(12)andMDKL/JKB.2/4/1296and/1297(Majlis Daerah Kuala Langat), thenMPKL/JKB/8/4/43/2022(15),MPKL/JKB/8/4/48/2022(20),MPKL/JKB/8/4/23/2023(14)andMPKL/JKB/8/4/5/2025(A)(14)(Majlis Perbandaran Kuala Langat) — the council was upgraded from district to municipal between the 2021 and 2022 filings, and the change is visible in the prefix on this one licence. District reads Kuala Langat on all seven records. No mukim is filed on any of them. The developer agrees it is outside Kota Kemuning: its own pages say “South of Kota Kemuning” and its COO told The Edge the township is “located next to Kota Kemuning”.
Explore related topics
The register code, the filed contract schedule and the title type decide what a buyer actually gets here — so those are the words to start from.
Six things about twentyfive7 that are true, filed, and published nowhere else
Each card below is a finding from the public register or the filed advertisement documents, not a selling point. Two of the six run against the developer’s own marketing, and two run in the buyer’s favour. All four are printed here the same way.
The name a client searches does not exist
“twentyfive7” is the registered name of nothing. The nearest is Gamuda Kemuning 25.7 on 19085-7. The string appears in the filings only as the name of the sales gallery, and once in the GreenRE register as Quayside Plaza, TwentyFive7. Five of the seven schemes are registered under the identical generic string Gamuda Kemuning, so only the serial separates them — which is why every phase name on this page carries its register code.
Landed houses, strata title — and that is the foreign-buyer answer
All seven phases are filed Schedule H and every permit from 19085-2 onward ends -(S). So 1,264 landed homes here are on strata title, not individual title. Selangor permits foreign purchase of strata and landed-strata only. Where a freehold individual-title landed scheme bars a foreign buyer outright, this township admits one — subject to the RM2,000,000 floor and to the Sekatan Kepentingan filed on every one of the six filings.
The delivery record, both halves of it
Five phases are complete and all five landed inside their governing date. Two of them — Luxura 156 homes and Levane 368 homes, 524 in all — took no extension at all and beat their ORIGINAL dates by 165 and 35 days. But two others, The Amber Residence (596) and Lucent (161), consumed +15 and +11 months and so landed 13.6 and 7.5 months past their originals. That is a MIXED record, it is not another township’s record, and no consumer source publishes either half.
A phase badged new, flagged late
Quayside Plaza, 19085-6, is flagged Lewat — late — by the national register, at 73.54% built on 437 of its 465 units, with vacant possession due 31 January 2027 and no approved extension on the record. Its advertising and sales permit expires on 27 October 2026 and it is still selling. The developer badges the same precinct “Newly Launched”. All of that is stated plainly and nothing is predicted from it.
Every home is inside the Act. The gap is entirely commercial
2,325 of 2,325 homes are inside a registered scheme with a licence, a permit and a statutory contract. What is NOT registered is commercial: Quayside Mall, Quayside Square, 22 shop units plus 10 business-space units at Quayside Plaza, and 34 double-storey shop lots under The Amber Residence — no KPKT registration, no licence, no permit and no filed advertisement for any of them. A buyer of one of those gets no Schedule G or H, no statutory late-delivery formula, no Housing Development Account, no statutory defect liability period and no Tribunal for Homebuyer Claims.
Searching by brand is not a finished search
q=GAMUDA on the developer register returns six licensees and this one is among them — but a non-empty brand result is not a finished search. q=TWENTYFIVE returns zero and q=BROADLEAF returns zero (control q=EXSIM returned 16 in the same session). And q=KEMUNING returns four licensees of which only this one is this township. Kota Kemuning proper belongs to Hicom-Gamuda Development Sdn Bhd, code 6784, 61 projects — a different licensee, 7 km away, and not one of its figures is on this page.
Seven registered phases on one licence — what each one is, what it delivered, and what it did not file
Printed phase by phase, with the register code beside every name, because the registered names do not distinguish them. Percentages built, statuses and dates are the register’s own as read on 13 October 2026; built-ups, lot sizes and price bands are from the filed advertisement documents except where marked registry. Where a schedule was not filed, the panel says NOT FILED rather than borrowing a marketing figure.
19085Lewat by the registerPhase by phase, with the register code
The marketing names below appear in NO filing. The mapping from marketing name to register code is this page’s own, built from unit counts, building types, filed dates and GreenRE entries — and one of the seven is labelled PROBABLE because it does not close.
Phase 1 — 19085-1
- Registered Gamuda Kemuning
- Filed type:
Rumah Berkembar(98 semi-D) +Rumah Teres iklan: []—NO filed advertisement has ever existed- So tenure, lease expiry, plan reference, car park,
Sekatan Kepentinganstatus and built-ups are UNAVAILABLE for 279 homes - Permit
19085-1/07-2021/02640(P), 19 Jul 2020 – 18 Jul 2021, lapsed - Registry band RM1,021,800 – RM3,389,970
- Original VP 26 Jul 2020 · CCC 21 Sep 2020 · VP not recorded (the register prints
-on all eight rows) pindaanTempohSerahKosong: Tidak- Press (The Edge, Apr 2017) gives built-ups 2,120 – 3,653 sq ft — a marketing figure for a scheme with no filing
The Amber Residence — 19085-2
- Registered Gamuda Kemuning; the brochure is headed Quayside Tower
Pangsapuri Servis/ filedPangsapuri Perkhidmatan- Filed built-up range 552 – 1,000 sq ft; per-type mapping NOT FILED
- Two towers: Block A 275 (A1 46, B 46, C 183), Block B 321 (A2 23, B 92, C 115, D 90, D1 1)
- Register says 23 storeys; PropertyGuru says 31 per tower — unresolved, both printed
- Filed band RM250,000 – RM976,040; registry band RM232,500 – RM950,040 —lower at BOTH ends
- Extension +15 months (36 – 51). Original VP 21 Jun 2021, revised 21 Sep 2022, CCC 1 Aug 2022, VP 10 Aug 2022
- Inside the revised date by 42 days —but 415 days, 13.6 months, past the ORIGINAL
pindaanTempohSerahKosong: Ya- Its filed PDF contains THREE generations of one statutory block, giving completion as May 2021, June 2023 and a placeholder —and June 2023 matches neither contractual date
- Lease expiry 19 Apr 2116 · charged to Public Bank Berhad
- A portal calls this scheme commercial-titled. It is wrong: the filing registers it under the Housing Development Act with a licence, a permit and Jadual H
Lucent Residence — 19085-3 (PROBABLE)
- Registered Gamuda Kemuning
- This mapping is PROBABLE, not proven. Lucent is marketed as 2 and 3 storey superlink AND semi-D, with ten type names — but
19085-3is 161 units ofRumah Teresonly, 30 at three storeys and 131 at two, with no semi-detached row at all - So either Lucent’s semi-Ds sit inside
19085-1, or Lucent spans two registrations, or the mapping is wrong. No document anywhere links any marketing precinct name to any register code - Register band matches NEITHER filed figure on all four rows: filed RM2,006,800 – 3,435,360 and RM1,488,800 – 2,805,360; registry RM1,717,018.08 – 3,178,560 and RM1,384,416 – 2,152,560
- The orphan RM1,717,018.08 carries sen that appear in no filed document
- Cause: the only brochure HIMS serves for this record is a full generation behind the record’s own permit — it prints licence
19085/07-2022/0052(A)and permit19085-3/05-2022/01614(P), both expired in 2022, while the register’s permit is19085-3/05-2023/0067(A)-(S). No current-generation filed advertisement is reachable - Extension +11 months (36 – 47). Original VP 7 Jun 2022, revised 7 May 2023, CCC 23 Dec 2022, VP 20 Jan 2023
- Inside the revised date by 107 days —but 227 days, 7.5 months, past the ORIGINAL
- The brochure’s own date (May 2023) tracks the REVISED date, so the extension was disclosed. Credit that
pindaanTempohSerahKosong: Ya· lease expiry 19 Apr 2116 · charged to Public Bank Berhad
Luxura Residence — 19085-4
- Registered Gamuda Kemuning ·
Rumah Teres 2 Tingkat - The most complete schedule on the licence —the only phase with filed lot DIMENSIONS
- Type A (ASTRID), edge and middle, lot 32ft x 75ft, 2,960 sq ft built-up, 26 units, RM1,951,800 – 2,913,800
- Type B (BEATRICE), lot 32ft x 70ft, 2,885 sq ft edge / 2,853 middle, 27 units, RM1,833,800 – 2,710,800
- Type C (CLAIRE), lot 28ft x 70ft, 2,938 sq ft edge / 2,885 middle, 39 units, RM1,972,800 – 2,471,800
- Type D (DIANE), lot 26ft x 70ft, 2,766 sq ft edge / 2,713 middle, 64 units, RM1,551,800 – 2,447,800
- The type-to-plan mapping above follows the document’s A – D order and is INFERRED: the plan blocks are not labelled by type in the filing
- Register matches the filing on 4 of 4 rows, to the sen
- NO extension. Original VP 21 Feb 2026 · CCC 9 Jun 2025 · VP 9 Sep 2025 —165 days INSIDE the ORIGINAL date
- Its filed brochure said January 2026, so it beat its own published date by about seven months
- Developer brochure prints the permit suffix
(N); the register prints(A)for the same serial and dates pindaanTempohSerahKosong: Tidak· lease expiry 19 Apr 2116 · charged to Public Bank Berhad
Levane Residences — 19085-5
- Registered Gamuda Kemuning; brochure phased Fasa 3B-1 / Fasa 3B-2 ·
Rumah Teres 2 Tingkat - The filing prints NO built-up and NO lot size at all. The developer publishes five type names (Arter A-prime, Arora A, Barro B, Cella C, Danna D, each Intermediate or Corner) and one sample plan at 3 bed / 3 bath / 1,999 sq ft. So every built-up in circulation for Levane is a marketing figure, and this page labels it as one
- Component split 154 + 214 = 368, reconciling to the filing
- Filed band RM930,800 – RM2,736,800, and the register matches on 10 of 10 rows to the sen
- NO extension. Original VP 4 Aug 2026 · CCC 26 Jun 2026 · VP 30 Jun 2026 —35 days INSIDE the ORIGINAL date
- Its filed brochure said July 2026, so it also beat its own published date
- Its filed permit is a PLACEHOLDER number,
XXXXX-X/XX-XXXX/XXXX(X)-(X), but with GENUINE validity dates, 28 Jul 2023 – 27 Jul 2026 —which exactly match the register’s19085-5/07-2026/0868(A)-(S). So lapse was assessable from the brochure alone pindaanTempohSerahKosong: Tidak- Lease expiry 30 July 2122 — about 95.8 years left, the middle of the three · encumbrance
Tiada—unencumbered - GreenRE BRONZE, PROVISIONAL, 4 June 2025,
RES v3.3 - This precinct is COMPLETE. It is not a launch and nothing on this page presents it as one
Quayside Plaza — 19085-6
Lewat · 465 units- Registered Quayside Plaza —one of only two phases whose registered name is not Gamuda Kemuning
Pangsapuri Perkhidmatan· 36 storeys per the register’s component rows- Filed built-ups, mapping INFERRED from layout and not explicitly labelled: Jenis A 2,508 sq ft (3 units), Jenis B 1,485 sq ft (25 units), Jenis C1 1,076, C2 990, D 829, E1 and E2 550 each — C1/C2/D/E1/E2 total 437 units with NO per-type unit split filed
- Register bed/bath: 6 bed / 4 bath (3 units); 3 – 4 bed / 3 bath (25); 1, 2 and 3 bed / 1, 2 and 3 bath (437)
- Filed band RM250,000 – RM2,126,800, and the register matches on 3 of 3 rows to the sen
- Overall register status
Lewat—LATE. Rows: 3 units 94.17% (Lancar), 25 units 92.30% (Lancar), 437 units 73.54% (Lewat) - vacant possession due 31 January 2027 ·
pindaanTempohSerahKosong: Tidak—NO approved extension on the record - Permit
19085-6/10-2026/1187(A)-(S), 28 Oct 2023 – 27 Oct 2026 —it expires 27 October 2026 and the precinct is still being marketed. A client should ask for the renewed permit before signing - The filed brochure prints expected completion Oktober 2026, which matches neither the contractual VP date nor anything else. The developer badges the precinct “Newly Launched”
- The arithmetic behind the
Lewatflag, stated without prediction: 33 of the 36-month period have elapsed since the first sale and purchase agreement on 31 January 2024, against 73.54% built on the main component - The third-party route to test the extension question is CLOSED: the construction record (mybina 93550) has the developer, contractor, quantity surveyor and all ten consultant roles subscriber-locked and records start and target completion as
-. A paywall, not a finding - Both HIMS path forms serve identical content on every field read, so there is no generation to diff on this phase
- Lease expiry 19 Apr 2116 · charged to Public Bank Berhad
- GreenRE SILVER, PROVISIONAL, 22 July 2024,
RES v3.3— its tool code appears only in the certification-entry list above the tier table, not in the table itself - There is NO usable image for this precinct. Its only identified asset carries an alt of
thumb projectand is refused. This phase is image-blocked and this page shows no picture of it
The Clove Signature — 19085-7
- Registered Gamuda Kemuning 25.7 —the closest any filing comes to the word twentyfive7
Rumah Kluster 2 & 3 Tingkat+Rumah Berkembar 2 Tingkat. Its brochure is headed by the PRODUCT CATEGORY, Rumah Kluster | Rumah Berkembar —an eighth filed-heading shape in this series- Developer type names: Type A 2-storey park homes (corner), Type B 2-storey park homes (intermediate), Type C 2-storey cluster homes, Type D 3-storey cluster homes, Type E 2-storey semi-D homes
- The brochure prints a size per type, for example Type A: 45ft x 46ft, 2,226 kps, but does NOT say whether that is lot area or built-up, and files no separate built-up schedule. Recorded as unlabelled
- The developer publishes one built-up only, 1,967 sq ft, 4 bed / 3 bath, without saying which type it belongs to. Register gives storeys 2 and 3 and bed/bath 4/4, 4/3 and 5/5 by row
- Filed band RM1,922,800 – RM3,909,800, and the register matches on 14 of 14 rows to the sen; unit counts reconcile 24+24+24+24+65+65+5+5+16+16+2+2+14+14 = 300
- Types B1 and B1(M), 24 units each, sit FLAT at RM1,922,800 —96.1% of the RM2,000,000 foreign-buyer floor. 252 of 300 clear it; those 48 do not
- 13.23% – 49.58% built · vacant possession 25 January 2029, and the brochure’s January 2029 agrees
- Permit
19085-7/01-2029/0055(N)-(S), 21 Jan 2026 – 20 Jan 2029 —current. The REGISTER itself prints the(N)suffix on the licence’s only actively-selling residential phase. Recorded as printed, flagged as a question - Its filed permit number is a placeholder with no dates, so lapse is assessable only via the register
pindaanTempohSerahKosong: Tidak- Lease expiry 26 November 2124 — about 98.1 years left, the longest of the three · encumbrance
Tiada—unencumbered - GreenRE BRONZE, PROVISIONAL, 30 July 2025,
RES v3.3 - Its filed GPS coordinate (2.964336 / 101.623321) sits roughly 7.5 km EAST of all six siblings, which cluster about 1 km across. Its own brochure gives the same Lot 43495 / Persiaran Oleander gallery address. Most probably a register data-entry error, but it is unresolved, and a client relying on that coordinate would be sent to the wrong place
- The developer calls it “Malaysia’s First New Typology Design” and “Final Phase of Lakefront Living”. Both are carried here as the developer’s claims. No primary source supports either
The commercial content — NOT REGISTERED, none of it
- Quayside Mall — the developer’s page says “stretching of 330,000 sq.ft.”; its COO told The Edge in 2017 300,000 sq ft net lettable area. Neither source says which measure it is using. Both figures are printed here and neither is resolved
- Quayside Square — 2 and 3 storey shops, badged “Limited Units”
- Quayside Plaza shop offices and business space — 22 shop units plus 10 business-space units at Levels 1 and 2, per the construction record mybina 93550, verified 7 May 2024
- The Amber Residence retail podium — 34 double-storey shop lots (StarProperty, 20 Dec 2021)
- Central park, promenade, “Monet’s Park” and the “Buzzar” community space
- What a buyer of a non-HDA commercial unit here loses, in plain language: no Schedule G or Schedule H statutory sale contract; no statutory liquidated-damages formula for late delivery; no section 7A Housing Development Account holding the progress payments; no statutory defect liability period; no Tribunal for Homebuyer Claims; and no legally filed advertisement, so no filed price band, no filed completion date and no filed building-plan reference to check
- The concrete cases are the 22 + 10 = 32 units at Quayside Plaza and the 34 shop lots under The Amber Residence
- This page is tagged landed and new launch and NOT commercial, deliberately: tagging a commercial component that no filing supports would overstate it. The category decision is explained in the register section
The licence timeline, and every completion date in circulation
19085/07-2022/0052(A) begins (recoverable from the brochures only)19085-1 — the township’s delivery clock starts-19085-3 ORIGINAL VP date — missed19085/07-2027/0599(A) begins — the day after the previous one ended19085-7/01-2029/0055(N)-(S) expires-2, -3, -4 and -6-5 (Levane)-7 (The Clove Signature)The seven phases as a buyer meets them — marketed name, registered name, register code
No floor plan, site plan, masterplan graphic or location map exists for this township from any source, so every panel below is deliberately without an image rather than filled with a render. Each card carries the register code, because the registered names do not distinguish the phases. What is filed is printed; what is not filed is marked NOT FILED.
Phase 1 — 19085-1
iklan: [] — no filed advertisement has ever existed for this scheme, so for 279 homes the tenure, the lease expiry, the plan reference, the car park allocation, the Sekatan Kepentingan status and every built-up are simply UNAVAILABLE. The registry band RM1,021,800 – RM3,389,970 is the only figure. Press gives built-ups of 2,120 – 3,653 sq ft, which is a marketing figure for a scheme with no filing. Ask for a title search.
The Amber Residence — 19085-2
Filed built-up range 552 – 1,000 sq ft with no per-type mapping filed. Three generations of one statutory block sit inside a single filed PDF, giving completion as May 2021, June 2023 and a placeholder — and June 2023 matches neither the original (21 Jun 2021) nor the revised (21 Sep 2022) contractual date. Register band RM232,500 – RM950,040 sits BELOW the filed RM250,000 – RM976,040 at both ends. Delivered inside the revised date by 42 days, 415 days past the original.
Lucent Residence — 19085-3 (PROBABLE)
The mapping is PROBABLE, not proven: Lucent is marketed with four semi-detached type families, and 19085-3 has no semi-detached row at all. The register band matches neither filed figure on all four rows, including an orphan at the sen, RM1,717,018.08, and the only brochure HIMS serves for this record is a full generation behind the record’s own permit. Its brochure date tracks the REVISED VP date, so the extension was disclosed — credit that. No built-up schedule is obtainable.
Luxura Residence — 19085-4
The only phase on this licence with filed lot DIMENSIONS, and the most complete schedule here: ASTRID 32×75 / 2,960 sq ft / 26 units; BEATRICE 32×70 / 2,885 and 2,853 / 27; CLAIRE 28×70 / 2,938 and 2,885 / 39; DIANE 26×70 / 2,766 and 2,713 / 64. The type-to-plan mapping follows the document’s A to D order and is INFERRED; the plan blocks are not labelled by type. Delivered 165 days inside its ORIGINAL date with no extension, and about seven months ahead of its own filed date.
Levane Residences — 19085-5
This precinct is complete and handed over. It is not a launch. CCC 26 June 2026, vacant possession 30 June 2026 — 35 days inside its ORIGINAL date with no extension at all. The filing prints NO built-up and NO lot size, so every Levane built-up in circulation — including the 1,999 sq ft sample plan — is a marketing figure. Filed band RM930,800 – RM2,736,800, matching the register on 10 of 10 rows. Unencumbered, and its lease runs to 30 July 2122.
Quayside Plaza — 19085-6
Flagged Lewat — late — by the national register at 73.54% built on its 437-unit main component, against vacant possession due 31 January 2027 and pindaanTempohSerahKosong: Tidak. Its advertising and sales permit expires on 27 October 2026 and the precinct is still selling. The developer badges it “Newly Launched”; the filed brochure says Oktober 2026, which matches nothing. No per-type unit split is filed for the 437-unit group, and no usable image of this precinct exists — so this page shows none.
The Clove Signature — 19085-7
The only open landed launch on this licence. Filed band RM1,922,800 – RM3,909,800, matching the register on 14 of 14 rows to the sen, and the unit counts reconcile to 300. Types B1 and B1(M), 24 units each, sit flat at RM1,922,800 — 96.1% of the RM2,000,000 foreign-buyer floor, so 252 of 300 clear it and 48 do not. The brochure prints a size per type without saying whether it is lot area or built-up, and files no separate built-up schedule. The register prints an (N) permit suffix, and its filed coordinate sits about 7.5 km east of its six siblings — both recorded as questions, neither resolved.
Not one of the seven phases has a published floor plan, site plan or masterplan graphic, from the developer or from anybody else, and Keluasan Tanah is NOT PRINTED in any of the six filed brochures — which is why this page carries no density figure and no plan image. Filed statutory Unit Selling Price ranges and public registry bands only. Not a price list, not a quotation, not an offer. The price list and the sale and purchase agreement at the sales gallery are the only authoritative source for what any individual unit costs.
Developer imagery — two precincts out of seven, and the five with none

19085-7) gallery — caption-published for the precinct (the host’s alt text is the original filename and the filename names the product). Subject NOT established. Source index 04.
19085-7) gallery — caption-published for the precinct, subject NOT established. Source index 05.
19085-7) gallery — caption-published for the precinct, subject NOT established. Source index 06.
19085-7) gallery — caption-published for the precinct, subject NOT established. Source index 07. The developer’s own numbering runs 01, 04, 05, 06, 07: indices 02 and 03 are absent from the page markup, so this is not one complete set and this page does not present it as one.
19085-5) gallery — caption-published for the precinct, subject NOT established. Levane is COMPLETE: CCC 26 June 2026, handed over 30 June 2026.
19085-5) gallery — caption-published for the precinct, subject NOT established. A completed, handed-over precinct, not a launch.
19085-5) gallery — caption-published for the precinct, subject NOT established. A completed, handed-over precinct, not a launch.What these images are, and what they are not. Nothing published for this township can reach the confirmed grade. The developer’s site runs on a JavaScript framework rather than a content management system with a public media library: there is no CMS title and no CMS date to confirm a subject against, and the image filenames carry hashed suffixes so they cannot be guessed. The ceiling is caption-published, and every caption above says so. One image bucket serves every Gamuda Land development in Malaysia and Australia — there is no per-township folder at all, which was proved on this exact host on an earlier job, where a file belonging to one township was found serving on another township’s page. So page placement is not a project identifier here and this page refuses it: every image above was selected because its own filename names the precinct, and every caption names which precinct it belongs to. Three township product thumbnails whose filenames DO name their precincts were still refused, because their alt text is the useless string thumb project; so were all “Similar Developments” cards and all the generic captioned feature tiles, which are reused across developments — one of them appears on the Levane page and The Clove Signature page both. And the gap matters more than the pictures: these ten images cover TWO of the seven registered phases. Phase 1 (19085-1), The Amber Residence (-2), Lucent (-3), Luxura (-4) and Quayside Plaza (-6) have NO imagery on this page at all, and Quayside Plaza is image-blocked entirely — its only identified asset carries the thumb project alt and is refused. No render above stands for the township, and none of them depicts any phase other than the one its caption names. No location map, no masterplan graphic, no site plan and no floor plan exists for any phase.
Where twentyfive7 actually is, and why the marketing address is a locality borrow
The filed project address is Lot 43495, Persiaran Oleander, 42500 Telok Panglima Garang, Selangor, and the district reads Daerah Kuala Langat on all seven register records. Every marketing surface calls this Kota Kemuning. The developer’s own distance table refutes its own address line — it puts Kota Kemuning Lakeside Park 7.0 km away and Bukit Kemuning Golf and Country Resort 7.4 km away. A development 7 km from Kota Kemuning’s own lake park is not in Kota Kemuning — which is exactly what the developer says elsewhere (“South of Kota Kemuning”; the COO told The Edge it is “located next to Kota Kemuning”) and exactly what the filings say. The marketing name is a locality borrow and the developer’s own table is the proof. Both are printed here.
The 19085-7 coordinate is unresolved. Its own brochure gives the same Lot 43495 / Persiaran Oleander address as its siblings and the developer calls it the final lakefront phase, which places it on the township. Most probably a register data-entry error — but a client relying on the register’s coordinate would be sent to the wrong place, so it is printed as an open question rather than silently corrected. Separately: never read a district off the register’s business-address field. The identical Gamuda business address at Quayside Tower, Persiaran Freesia, 42500 is filed as Kuala Langat on this licence, as Petaling on two others and as Gombak on a fourth — four districts for one address, three of them contradicting its own 42500 postcode.
The developer’s own distance table — all thirteen rows, and it is a TOWNSHIP table
- Oasis International School KL — 3.6 km
- Tenby International School Kota Kemuning — 4.4 km
- Beaconhouse Kota Kemuning Pre-school — 5.0 km
- MAHSA University Kota Kemuning — 6.3 km
- Chinese Taipei School KL — 6.7 km
- Philharmonic School of Music — 7.1 km
- Kemuning Medical Centre — 13.1 km
- Gamuda Walk — 7.8 km
- Football Talent Asia — 300 m
- Vista Shah Alam Equestrian and Endurance — 2.8 km
- Kota Kemuning Lakeside Park — 7.0 km
- Bukit Kemuning Golf and Country Resort — 7.4 km
- Kota Permai Golf and Country Club — 7.6 km
- An Entertainment heading with no entries under it
Three problems with that table, named
- It is one table reused on every precinct page. The identical thirteen rows appear on the township page, the Levane page and The Clove Signature page, figure for figure. So it is a TOWNSHIP table and no precinct-specific distance exists for any phase. Credit the developer for publishing figures at all — then read them as township figures.
- It refutes the project’s own address line, as above: 7.0 km to Kota Kemuning’s lake park and 7.4 km to Bukit Kemuning golf.
- A neighbouring development’s own table disagrees about the same destinations. A separate scheme at Seksyen 32 Kota Kemuning (Daerah Klang) publishes the same golf resort at 2.1 km and the Kota Kemuning lake at 5.4 km, against 7.4 km and 7.0 km here. A systematic disagreement between two developments’ own tables about shared destinations is evidence that they are two separate sites, not an error in either —and it corroborates the Kuala Langat placement independently of the filings.
Rail, highways, and what nobody publishes
- NO source publishes a distance to any rail station — not the developer, not the press, not any portal. No LRT, MRT, KTM or BRT station is named anywhere by anybody, and this page names none.
- The developer contradicts itself on highways on one website: the township page says “4 Major highways” and the Quayside Square entry on the same page says “Connected To 5 Major Highways”. Both are printed; neither is resolved.
- No highway is named with a distance by anybody, and no highway is named at all on the pages read — so there is no named-highway figure to publish here.
- No distance on this page is this page’s own. Every figure above is the developer’s own published figure, reproduced as a township figure. Nothing is measured, estimated or inferred.
Why this page is filed under Telok Panglima Garang
- The site taxonomy puts this page under Selangor and Telok Panglima Garang, the filed locality, not under Kota Kemuning. That is a deliberate choice: a location term is what the breadcrumb and the location archive print, and filing a Kuala Langat development under a Daerah Klang locality would put a wrong district in front of every reader.
- Kota Kemuning is in the page title, the heading and the body, because that is what a client searches and that is what the developer markets —and the filed location is stated beside it every time.
- A further reason to keep the terms apart: Kota Kemuning proper is a different licensee —
Hicom-Gamuda Development Sdn Bhd, code6784, 61 project records, 44 of them carrying the words Kota Kemuning, all long completed. Nothing in licence 6784 is twentyfive7 and nothing in licence 19085 is Kota Kemuning proper.
Distances are the developer’s own published township figures and are reproduced, not verified on the ground. Confirm any figure that matters to you against the filed advertisement particulars and your own site visit. Coordinates are the register’s own, including the 19085-7 outlier, which is printed as an unresolved question.
Registered as Gamuda Kemuning (five times), Quayside Plaza and Gamuda Kemuning 25.7 — KPKT projects 19085-1 to 19085-7
Printed as the register and the filed advertisement documents print it, including the parts that disagree with each other. Read on 13 October 2026 from the public KPKT TEDUH register records for developer 19085 and projects 19085-1 through 19085-7, and from the six filed HIMS advertisement documents (19085-1 has none). There is no developer statutory block to compare against: gamudaland.com.my publishes no licence number, no permit number, no statutory panel and no permit page anywhere on the site. So every statutory particular on this page comes from the register and the filings, and nothing on this page is taken from a developer statutory panel — because there is none to take it from.
| Registered schemes | Licensed developer | Developer licence | Licensed units | Contract schedule | Advertising and sales permits | Permit status today | Tenure and lease expiry | Filed statutory price bands | Percentage built | Register status | Extension field | Vacant possession | Restriction in interest | Register conduct |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
19085-1 Gamuda Kemuning (Phase 1)19085-2 Gamuda Kemuning (The Amber Residence)19085-3 Gamuda Kemuning (Lucent, probable)19085-4 Gamuda Kemuning (Luxura)19085-5 Gamuda Kemuning (Levane)19085-6 Quayside Plaza19085-7 Gamuda Kemuning 25.7 (The Clove Signature)“twentyfive7” is the registered name of none of them. Five share one identical string. | GAMUDA LAND (KEMUNING) SDN. BHD. Company registration 200201030459 (598122-P), printed in the filed brochures of -2 to -7 — NOT in the TEDUH developer recordDeveloper code 19085 Brand Gamuda Land, the property arm of Gamuda Berhad, 197601003632 (29579-T) No joint venture, landowner or vendor is named anywhere | 19085/07-2027/0599(A)19 Jul 2022 – 18 Jul 2027 Current Previous, from the brochures: 19085/07-2022/0052(A), 19 Jul 2021 – 18 Jul 2022 — renewed forward, the day afterThe -2 and -3 brochures still print the expired 2021–22 licence | 2,325 279 · 596 · 161 · 156 · 368 · 465 · 300 100% licensed. Walk runs -1 to -7, -8 returns a client error, and jumlahProjek agrees at 7Component rows sum to bilanganUnit on all seven | Schedule H on all seventempohAsal 36 months on all sevenSo these landed homes are on strata title, with a management corporation, a sinking fund and service charges No marketing surface says the word strata | 19085-1/07-2021/02640(P)19085-2/05-2023/0066(R)-(S)19085-3/05-2023/0067(A)-(S)19085-4/02-2026/0121(A)-(S)19085-5/07-2026/0868(A)-(S)19085-6/10-2026/1187(A)-(S)19085-7/01-2029/0055(N)-(S)Every permit from -2 onward ends -(S). -1 carries a bare (P) | -1 lapsed 18 Jul 2021-2 lapsed 30 May 2023-3 lapsed 23 May 2023-4 lapsed 12 Feb 2026-5 lapsed 27 Jul 2026-6 EXPIRES 27 OCT 2026 — and it is still selling-7 current to 20 Jan 2029Five lapsed permits on completed phases are normal. The two to look at are -6’s imminent expiry and -7’s (N) | 99-year leasehold on every filed phase 19 Apr 2116 — -2, -3, -4, -6 (about 89.5 yrs)30 Jul 2122 — -5 (about 95.8 yrs)26 Nov 2124 — -7 (about 98.1 yrs)-1 NOT PRINTED — no filing exists, expiry UNKNOWNAn 8.6-year spread in remaining term, tabulated by nobody | -1 RM1,021,800 – 3,389,970 (registry)-2 RM250,000 – 976,040 (filed) / RM232,500 – 950,040 (registry — LOWER at both ends)-3 RM1,384,416 – 3,178,560 (registry; matches neither filed figure)-4 RM1,551,800 – 2,913,800-5 RM930,800 – 2,736,800-6 RM250,000 – 2,126,800-7 RM1,922,800 – 3,909,80031 of 31 rows across -4, -5, -6 and -7 match the register to the senFiled statutory ranges and public registry bands. Not a price list, not a quotation, not an offer | -1 to -5 complete-6: 94.17% (3 units) · 92.30% (25 units) · 73.54% (437 units)-7: 13.23% – 49.58%A percentage built is a payment-stage figure from the register, not a promise about a handover date | -1 to -5 Siap — CCC issued-6 keseluruhan: Lewat — LATE-7 under constructionThe developer badges -6 “Newly Launched”. The register flags the same scheme late. Both are printed; nothing is predicted | pindaanTempohSerahKosongTidak on -1, -4, -5, -6, -7Ya on -2 (+15 months) and -3 (+11 months)One licence, both values. Draw no rule from this field — and note the pattern that is NOT there: all seven are Jadual H / 36 months, so no schedule-based explanation has anything to grip on | -1 original 26 Jul 2020, CCC 21 Sep 2020, VP field is --2 original 21 Jun 2021, revised 21 Sep 2022, VP 10 Aug 2022-3 original 7 Jun 2022, revised 7 May 2023, VP 20 Jan 2023-4 original 21 Feb 2026, VP 9 Sep 2025-5 original 4 Aug 2026, VP 30 Jun 2026-6 DUE 31 JAN 2027-7 DUE 25 JAN 2029 | Sekatan Kepentingan filed on all six filings, verbatim: “Tanah ini tidak boleh dipindah milik, dipajak atau digadai melainkan dengan kebenaran pihak Berkuasa Negeri.” This land may not be transferred, leased or charged without the consent of the State Authority -1: UNKNOWN — no filing exists. Ask for a title search rather than reading across from its siblings | statusPemaju: AktifmempunyaiKesalahan: null — no recorded offenceprojek_sakit_count: 0projek_terbengkalai_count: 0Encumbrance: -2, -3, -4 and -6 charged to Public Bank Berhad; -5 and -7 Tiada, unencumbered; -1 NOT PRINTEDThe permit history table was not reachable for this developer, so unpermitted intervals were NOT CHECKED — recorded as unchecked, not as clean |
Read 13 October 2026 from teduh.kpkt.gov.my (developer 19085; projects 19085-1 to 19085-7; 19085-8 returns a client error) and from the filed advertisement documents on hims.kpkt.gov.my for -2 to -7. Register percentages and statuses move. Re-check before you sign anything.
The figures above are the filed statutory Unit Selling Price ranges and the public government registry bands, published here because they are a legally filed sale price range and a public record. They are not a price list, not a quotation and not an offer. The authoritative figure for any individual unit is the price list and the sale and purchase agreement at the sales gallery.
Scope: this is one township page, and two developments it is NOT
This page covers all seven registered phases of licence 19085, and nothing else. First: Broadleaf — Kota Kemuning is a separate development by a different developer and not one of its figures appears anywhere on this page. It belongs to BCB Development Sdn Bhd, developer code 13053, licence 13053/04-2028/0551(A), at the Home Tree township in Daerah Klang, and both of its registered phases are already Siap Dengan CCC — completed. It shares nothing with twentyfive7 but the words “Kota Kemuning” in an address line, and it needs its own page and its own research. Second: Kota Kemuning proper is a different licensee again — Hicom-Gamuda Development Sdn Bhd, code 6784, 61 project records, 44 of them carrying the words Kota Kemuning, all completed decades ago. Nothing in licence 6784 is twentyfive7 and nothing in licence 19085 is Kota Kemuning proper. They are two Gamuda-named licensees one word apart in the township name and about 7 km apart on the ground, and keeping them separate is the single most useful thing a client can be told about this address. Figures from two further Gamuda licensees — Bandar Serai Development Sdn Bhd (code 19124) and Gamuda Land (Botanic) Sdn Bhd — are also deliberately absent, including their delivery records, their awards and their green certifications.
Why this page is tagged landed and new launch, and deliberately NOT commercial
Taxonomy, stated rather than left to be guessed. This page is filed under Landed and New Launch, under Selangor and Telok Panglima Garang, and under the developer brand Gamuda Land. Landed is right even though the title is strata: 1,264 of the 2,325 licensed homes are houses — terraced, cluster and semi-detached — and condominium or serviced apartment would misdescribe them, while the fact that the title is strata title is stated throughout the page because it is unusual and because it is what admits a foreign buyer. New launch is right because two phases are selling: The Clove Signature (19085-7) is open, and Quayside Plaza (19085-6) is still being marketed at 73.54% built. Commercial was considered and declined, and the reason is the point: Quayside Mall, Quayside Square and the shop and business-space units carry no KPKT registration, no licence, no permit and no filed advertisement at all, so tagging a commercial component that no filing supports would overstate what is actually on offer here. Six earlier pages in this series reached the same conclusion on the same reasoning. The commercial content is described in full in the project panel above — described, not tagged.
Foreign buyers: title, zone, price and consent — four separate questions, and three different answers
On title the answer here is favourable, and that is unusual for a landed scheme. All seven phases are filed Schedule H and every permit from 19085-2 onward carries the -(S) tail, so the landed homes are on strata title. Selangor permits foreign purchase of strata and landed-strata only, and standard individual-title landed is not permitted — the state guide citing Pekeliling PTG Selangor Bil. 1/2014, iProperty, and IQI’s own land guide at iqiglobal.com/blog/buying-land-in-malaysia-for-foreigners/ all carry the same restriction. So where a freehold individual-title landed scheme bars a foreign buyer outright, this township admits one. On the zone, a correction: Daerah Kuala Langat is Selangor ZONE 2, not Zone 1. Zone 1 (Petaling, Gombak, Hulu Langat, Sepang, Klang) and Zone 2 (Kuala Selangor, Kuala Langat) both carry a floor of RM2,000,000; Zone 3 (Hulu Selangor, Sabak Bernam) is RM1,000,000. The figure is the same but the route is different, and a client told “Zone 1” and then checking the circular will not find Kuala Langat there. It remains double the Kuala Lumpur figure of RM1,000,000 with EPU consent. PTG Selangor publishes no reachable circular, so confirm with PTGS before committing. On price, the detail is in the comparison in the FAQ below; the short form is that The Clove Signature clears for 252 of its 300 homes and fails for 48, Quayside Plaza clears for 3 of 465, The Amber Residence for none of its 596, and 604 of the 2,325 licensed units straddle the floor and are undeterminable because no per-unit price is filed anywhere. And on consent, a separate condition sits on top of all of that: a Sekatan Kepentingan is filed on all six filings, forbidding transfer, lease or charge without State Authority consent. That applies regardless of price and regardless of the strata finding. On 19085-1 the restriction status is simply UNKNOWN, because no advertisement was ever filed for it — ask for a title search rather than reading across from its siblings. One marketing-only condition is worth flagging honestly: the state guidance additionally conditions landed-strata on the scheme being gated and guarded. The developer publishes “24-hour multi-tiered security” on one precinct page and no filing on this licence contains any security item at all, so treat that condition as probably met on marketing evidence only.
The build percentages, and how to read them
A percentage built in the register is a payment-stage figure, not a promise about a handover date. On 19085-6 the three component rows read 94.17% (3 units), 92.30% (25 units) and 73.54% (437 units), and the register’s overall status on that record is Lewat — late. The arithmetic behind the flag, stated without prediction: 33 of the 36-month delivery period have elapsed since the first sale and purchase agreement on 31 January 2024, against 73.54% built on the main component, with vacant possession due 31 January 2027 and no approved extension on the record. The honest reading is that both of those are true at once and neither this page nor any source can tell a buyer which way it resolves. On 19085-7 the rows read 13.23% to 49.58% against a governing date of 25 January 2029, which is early in a 36-month programme and unremarkable. These figures move. Re-read the register at the date you sign.
Not published, therefore not on this page
Seventeen things a buyer would reasonably ask about this township, and no source answers them. 1. No parcel area for any phase — Keluasan Tanah is not printed in any of the six filed brochures, so no density, no plot ratio and no net-to-gross figure is publishable, and this page publishes none. 2. No car park allocation in any filing on this licence — the claim “up to 5 carparks with direct unit access” has no statutory support anywhere. 3. No lot or PT number for any phase; the only lot number in circulation, Lot 43495, is the sales gallery’s. 4. No mukim on any of the seven records. 5. No township gross development value from any source — the sums on this page are this page’s own, labelled as such. 6. No built-up schedule for 19085-1, -3 or -5; no per-type unit split for Quayside Plaza’s 437-unit group or for The Amber Residence’s built-up types; and no labelled built-up for The Clove Signature. 7. No landowner, vendor or joint-venture partner named anywhere. 8. No source maps any marketing precinct name to any register code — the GreenRE register is the only public document that bridges two of them, which is why the Lucent mapping on this page is labelled probable. 9. 19085-1 has no filed advertisement, ever, so tenure, lease expiry, plan reference, restriction in interest, permit particulars and built-ups are unavailable for 279 homes. 10. No current-generation filed advertisement exists for 19085-3. 11. Which of The Clove Signature’s 48 sub-floor units, and which of the 604 straddling units township-wide, clear the RM2,000,000 floor — undeterminable, because no per-unit price is filed. 12. What explains the RM250,000 and RM232,500 entries, given that the affordable-component hypothesis tests negative. 13. No facilities schedule by level for either high-rise phase, and no facilities list at all in any filing — the developer publishes feature words, not a schedule. 14. No distance to any rail station and no highway distance, from anybody. 15. No subsidiary shareholding percentage for the licensee — the group’s latest annual report file would not load. 16. No QLASSIC workmanship score for any phase. 17. The register’s own permit-history table was not reachable for this developer, so unpermitted intervals were NOT CHECKED — recorded as unchecked rather than as a clean result. Louis will ask the developer for every one of these in writing. What comes back will be added here with its date.
Superlatives this page quotes and does not adopt
The developer’s own words, attributed, with what supports them. “Malaysia’s First New Typology Design” (The Clove Signature) — no definition, no awarding body, no register entry and no comparator exists, so it is unsupportable as written and is carried here only as the developer’s claim. “Final Phase of Lakefront Living” (The Clove Signature) — no source states how many lakefront phases there are, and two other precincts are also marketed as lakefront, so this too is carried as a claim. “The first and largest mall in Kota Kemuning” (Quayside Mall) — neither “first” nor “largest” is testable from any published figure, and the premise is wrong, because the township is not in Kota Kemuning on the developer’s own distance table. “Newly Launched” (Quayside Plaza) — refuted by the developer’s own filing and by the national register, which flags that scheme late at 73.54% built. “Connected To 5 Major Highways” against “4 Major highways” on the same website, with no highway named and no distance given — unsupported either way. And one claim the developer did NOT make, which is worth the credit: there is no low-density claim anywhere on any of its pages — which is just as well, since no density figure can be computed for any phase of this township.
What this page does not publish, and why
This agency has one absolute compliance instruction and this page applies it literally. No discount figure, no rebate figure, no nett price, no promotion and no commission information appears anywhere on this page, from any source, whatever its provenance — and those five terms appear exactly once each on this page, here in this sentence, and nowhere else. There is one deliberate, named exception, and it is the term Bumiputera, which appears exactly twice on this page: once here, and once in the answer block near the top of this page, in the cell whose heading names that allocation field. In that cell the page records ONLY that the filed advertisement particulars contain such a field and that the field carries a value, and it publishes no value for it. Those are the only two places the term appears, and there is no third. What that means in practice. The filed statutory Unit Selling Price bands and the public KPKT TEDUH register bands ARE published here, because they are the legally filed sale and purchase price ranges and a public government record — and each is labelled on this page as what it is: not a price list, not a quotation and not an offer. What is withheld, and what is recorded instead. The developer’s own page for The Clove Signature carries an entry figure that sits BELOW the filed statutory minimum of RM1,922,800 for 19085-7. Neither that figure nor the size of the gap appears anywhere on this page, because printing a gap beside a filed minimum would reconstruct the withheld figure exactly. Recorded here is only that the discrepancy exists, and how many independent publishers carry it — and the carrier count is the sharper finding. The count is ONE, and that one carrier is NOT independent of the development at all: it is the developer itself. No portal and no press report was found repeating it. Counting rule applied, so that the figure one is honest: the Edge-group domains and its content API count as one publisher; PropertyGuru and iProperty count as one; the two Star-group domains count as one. A developer carrying a figure below its own filed statutory minimum, with no independent publisher repeating it, is a sharper finding than a wide discrepancy across many sources would be, and it is stated as such. A second instance is recorded as CONDITIONAL and not asserted: the Lucent Residence page prints two different entry figures in two places on one page, and both sit below 19085-3’s filed minimum and below its registry minimum — but the Lucent to 19085-3 mapping is only probable, so the finding is conditional on a mapping this page does not claim to have closed. Two cases run the other way and are credited: Levane’s entry figure sits ABOVE its filed minimum, and Quayside Plaza’s sits well above its filed RM250,000. That is the normal, honest case and it deserves naming as much as the other. And the test that ran backwards is reported negative rather than left hanging: there is no affordable-unit type-code suffix pair anywhere on this licence, no duplicated built-up at two prices, no register flag for a state affordable scheme, and no source mentioning one — so the low RM250,000 and RM232,500 entries are recorded as an unexplained anomaly and not explained away as an affordable allocation. Where you get a real figure: the price list and the sale and purchase agreement at the sales gallery. Ask Louis and he will walk you through the filed schedule line by line.
How this page was built, and its limits
Everything above is either traced to a named published source or marked as not published. The spine is the public KPKT TEDUH register records for developer 19085 and projects 19085-1 through 19085-7, read on 13 October 2026, and the six filed HIMS advertisement documents. Three limits are worth stating plainly. First, 19085-1 has no filed advertisement at all, so a seventh of the township’s homes sit behind a blank. Second, the only filed advertisement reachable for 19085-3 is a full generation behind that record’s own permit, which is why its price band disagrees with the register on every row — and no current-generation document for it could be reached. Third, the green-certification register truncates on three of its four tiers, so where this page says there is no further entry it means no further entry in the reachable portion, never a clean negative; the one genuinely clean negative is the top tier, which closed completely with no entry for this licensee. One further honest limitation on the green side: the certification-entry list that yielded Quayside Plaza’s assessment-tool code covers only 10 October 2014 to 1 July 2025 and therefore misses later rows in its own tier table. And the national green-building directory for the other certification body returns server errors throughout, so its absence is inconclusive and is never read as a negative. Published 13 October 2026. Re-verify every figure against the filed advertisement particulars before you sign.
Gamuda Land (Kemuning) Sdn. Bhd. — who is actually liable, and what the register says about them
The entity a buyer contracts with here is GAMUDA LAND (KEMUNING) SDN. BHD., company registration 200201030459 (598122-P), KPKT developer code 19085, holding developer licence 19085/07-2027/0599(A) valid 19 July 2022 to 18 July 2027. The registration number is printed in the filed brochures of 19085-2, -3, -4, -5, -6 and -7, and it is taken from there because the TEDUH developer record carries no company-registration field for this licensee. A portal prints the same number in one of its own fields; that is recorded and not relied on, because a portal field is not a filing.
This is a special-purpose vehicle, and that is normal in Malaysian development — but it has a consequence worth stating. The brand is Gamuda Land, described on its own site as the property arm of Gamuda Berhad, 197601003632 (29579-T), and the register’s own contact e-mail on this record is a @gamudaland.com.my address, which ties the vehicle to the brand without needing a corporate announcement. But no joint venture partner, no landowner and no vendor is named in any filing, in any register field or in any press piece. So the joint-venture question here is UNANSWERED, not answered negatively — and a buyer who wants to know who owns the land should ask for a title search rather than read anything into the silence. The licensee’s own ownership percentage inside the group is also unobtainable: the group’s latest annual report file would not load.
What the register says about conduct, and it is clean: statusPemaju: Aktif, mempunyaiKesalahan: null — no recorded offence — projek_sakit_count: 0 and projek_terbengkalai_count: 0. And the licence was renewed forward, not lapsed: the previous licence 19085/07-2022/0052(A) ran to 18 July 2022 and the current one begins 19 July 2022, the day after. Offset against that, two of the filed brochures on this licence still print the expired 2021–22 licence number, and the three newest filings print placeholder permit numbers where the three oldest print real ones — the filings on this licence got less precise over time, not more.
Registered office: Menara Gamuda, D-16-01, Block D, PJ Trade Centre, No. 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling, Selangor. Business address, as filed: QT-06, Quayside Tower, Kompleks Perniagaan Gamuda, Persiaran Freesia, Gamuda Kemuning 25.7, 42500 Kuala Langat, Selangor. Register telephone 0163904522; the brochure contact block gives 03-5131 6257 and the gallery footer 03 2787 7949. The register’s lamanWeb field is empty on this record.
A search lesson worth one line, because it cost a previous job a whole licence. q=GAMUDA on the developer register returns six licensees, and this one is among them — so the brand search worked first time here. But a non-empty brand result is not a finished search: on an earlier Gamuda township the same query missed the licensee entirely. The masterplan route fails here too — q=TWENTYFIVE returns zero — and q=KEMUNING returns four licensees of which three are refused: one in Negeri Sembilan, one in Penang, and one live 2026 licence with zero registered projects. Three further Gamuda licensees are deliberately kept off this page entirely, and none of their figures appears anywhere above: Hicom-Gamuda Development Sdn Bhd (code 6784, 61 projects, the original master developer of Kota Kemuning proper), Bandar Serai Development Sdn Bhd (code 19124), and Gamuda Land (Botanic) Sdn Bhd.
Construction, and a closed door recorded as closed. The public construction record for Quayside Plaza’s commercial component carries the developer, the main contractor, the quantity surveyor and all ten consultant roles behind a subscriber paywall, and records the construction start and target completion as -. So no contractor name, no commencement date, no programme length, no gross floor area and no lot or PT number is recoverable from it — and that is a paywall, not a finding. The one half of the test that can be run is printed in the project panel above: 33 of the 36-month period have elapsed since the first sale and purchase agreement against 73.54% built on the main component. Separately, Gamuda Land is publicly associated with an industrialised building system using robotics and shared data platforms, reported at The Amber Residence’s topping-off; that is a press description of a method, not a filed particular, and nothing on this page depends on it.
Developer and licence particulars read 13 October 2026 from the public KPKT TEDUH register developer record for code 19085 and from the six filed advertisement documents. Company registration number from the filed brochures, because the register does not carry it. Confirm the licence and every permit are current at the date you sign.
twentyfive7 @ Kota Kemuning — the filed answers
What exactly is twentyfive7, and what is it registered as?
19085, with exactly SEVEN registered schemes and 2,325 residential units. And “twentyfive7” is the registered name of none of them. The nearest is Gamuda Kemuning 25.7 on 19085-7; the string appears in the filings only as the name of the sales gallery, and once in the green register as Quayside Plaza, TwentyFive7. Five of the seven are registered under the identical generic string Gamuda Kemuning, so a client searching the public register by name cannot tell them apart — only the serial separates them. Here is the full mapping, with the register code beside every name.| Register code | Registered name, as filed | Marketed name | Filed building type | Units | Status today |
|---|---|---|---|---|---|
19085-1 | Gamuda Kemuning | Phase 1 | Rumah Berkembar (semi-D) + Rumah Teres | 279 | Complete, CCC 21 Sep 2020 |
19085-2 | Gamuda Kemuning | The Amber Residence (brochure headed Quayside Tower) | Pangsapuri Perkhidmatan | 596 | Complete, VP 10 Aug 2022 |
19085-3 | Gamuda Kemuning | Lucent Residence — PROBABLE only | Rumah Teres 2 and 3 storey | 161 | Complete, VP 20 Jan 2023 |
19085-4 | Gamuda Kemuning | Luxura Residence (ASTRID / BEATRICE / CLAIRE / DIANE) | Rumah Teres 2 Tingkat | 156 | Complete, VP 9 Sep 2025 |
19085-5 | Gamuda Kemuning | Levane Residences (brochure Fasa 3B-1 / 3B-2) | Rumah Teres 2 Tingkat | 368 | Complete, VP 30 Jun 2026 |
19085-6 | Quayside Plaza | Quayside Plazas Serviced Apartments | Pangsapuri Perkhidmatan, 36 storeys | 465 | Selling — register status Lewat |
19085-7 | Gamuda Kemuning 25.7 | The Clove Signature | Rumah Kluster 2 and 3 storey + Rumah Berkembar 2 Tingkat | 300 | OPEN LANDED LAUNCH |
| TOTAL LICENSED | 2,325 | 100% licensed |
19085-3 is labelled PROBABLE, not proven: Lucent is marketed with four semi-detached type families, and 19085-3 has no semi-detached row at all — it is 161 units of terraced houses only. Either Lucent’s semi-Ds sit inside 19085-1, or Lucent spans two registrations, or the mapping is wrong. No document anywhere links any marketing precinct name to any register code, so that inference is labelled as an inference. Separately, 19085-1 has iklan: [] — no filed advertisement has ever existed — so for 279 homes the tenure, the lease expiry, the plan reference and every built-up are simply unavailable.Is this actually in Kota Kemuning?
MDKL/JKB— on the 2021–22 filings and MPKL/JKB— on the 2022–25 filings — Majlis Daerah Kuala Langat, then Majlis Perbandaran Kuala Langat after the council was upgraded, and the change is visible in the prefix on this one licence. Not MBSA, not MPK, not MBSJ and not Daerah Klang. The developer’s own distance table refutes its own address line: it puts Kota Kemuning Lakeside Park 7.0 km away and Bukit Kemuning Golf and Country Resort 7.4 km away. A development 7 km from Kota Kemuning’s own lake park is not in Kota Kemuning — which is what the developer says elsewhere in its own words: “South of Kota Kemuning”, and the COO told the press the township is “located next to Kota Kemuning”. And a neighbouring scheme at Seksyen 32 Kota Kemuning, in Daerah Klang, publishes the same golf resort at 2.1 km against 7.4 km here — a systematic disagreement between two developments’ own tables about shared destinations is evidence they are two separate sites. Why it matters in practice: the zone, the local authority, the assessment rates and the land office you deal with are all Kuala Langat’s, not Klang’s. Kota Kemuning is in this page’s title because that is what the developer markets and what a client searches — and the filed location is stated beside it every time.Has this developer delivered on time? Give me the real record.
| Code | Precinct | Units | Extension field | Extension | First SPA | ORIGINAL VP | Revised VP | CCC | VP actual | Outcome |
|---|---|---|---|---|---|---|---|---|---|---|
-1 | Phase 1 | 279 | Tidak | – | 26 Jul 2017 | 26 Jul 2020 | – | 21 Sep 2020 | not recorded | CCC 57 days after the VP date; the register prints - in the VP field on all eight rows |
-2 | The Amber Residence | 596 | Ya | +15 months (36–51) | 21 Jun 2018 | 21 Jun 2021 | 21 Sep 2022 | 1 Aug 2022 | 10 Aug 2022 | Inside the revised date by 42 days, but 415 days (13.6 months) past the ORIGINAL |
-3 | Lucent (probable) | 161 | Ya | +11 months (36–47) | 7 Jun 2019 | 7 Jun 2022 | 7 May 2023 | 23 Dec 2022 | 20 Jan 2023 | Inside the revised date by 107 days, but 227 days (7.5 months) past the ORIGINAL |
-4 | Luxura Residence | 156 | Tidak | none | 21 Feb 2023 | 21 Feb 2026 | – | 9 Jun 2025 | 9 Sep 2025 | 165 days INSIDE the ORIGINAL date, no extension |
-5 | Levane Residences | 368 | Tidak | none | 4 Aug 2023 | 4 Aug 2026 | – | 26 Jun 2026 | 30 Jun 2026 | 35 days INSIDE the ORIGINAL date, no extension |
-6 | Quayside Plaza | 465 | Tidak | none granted | 31 Jan 2024 | 31 Jan 2027 | – | - | - | Register flags the whole scheme Lewat — LATE — at 73.54% built on 437 of 465 units |
-7 | The Clove Signature | 300 | Tidak | – | 25 Jan 2026 | 25 Jan 2029 | – | - | - | 13.23% – 49.58% built; brochure agrees with the register on the date |
pindaanTempohSerahKosong reads Tidak five times and Ya twice on this ONE licence, so draw no rule from that field at all — and note the explanation that is NOT available: all seven are Schedule H on 36 months, so no schedule-based account of why two needed extensions has anything to grip on. Second, this is not another township’s record. A different Gamuda licensee at a different township delivered thirteen of thirteen completed phases inside the governing date with eight needing no extension at all; that record belongs to that licence and not to this one, and no figure of it appears anywhere on this page. Third, a buyer is better served by the real mix than by nothing, and nothing is what every consumer source publishes.Quayside Plaza is advertised as newly launched. What does the register say?
Lewat — late. 19085-6, 465 units, 36 storeys. Its three component rows read 94.17% built (3 units, Lancar), 92.30% (25 units, Lancar) and 73.54% on the main group of 437 units, flagged Lewat, which carries the whole record to an overall status of Lewat. vacant possession falls due on 31 January 2027 and pindaanTempohSerahKosong reads Tidak — no approved extension sits on the record. Its advertising and sales permit 19085-6/10-2026/1187(A)-(S) expires on 27 October 2026, and the precinct is still being marketed — so ask for the renewed permit before you sign anything. The filed brochure prints an expected completion of Oktober 2026, which matches neither the contractual date nor anything else. And the developer badges the same precinct “Newly Launched”: its own filing refutes its own badge. The arithmetic, printed without any prediction attached: 33 of the 36-month period have elapsed since the first sale and purchase agreement on 31 January 2024, against 73.54% built on the main component. The third-party route that would have tested whether an extension has been applied for is closed behind a subscriber paywall, which is recorded as a paywall and not as a finding. Nobody — not this page — can tell you which way this resolves. What you can do is ask for the renewed permit, the current programme and written confirmation of the governing handover date in your own sale and purchase agreement.Can a foreigner buy at twentyfive7?
19085-2 onward carries the -(S) strata tail, so the landed homes here are on strata title, not individual title. Selangor permits foreign purchase of strata and landed-strata only, and standard individual-title landed is not permitted — the state guidance citing Pekeliling PTG Selangor Bil. 1/2014, iProperty, and IQI’s own land guide at iqiglobal.com/blog/buying-land-in-malaysia-for-foreigners/ all carry the same restriction. So where a freehold individual-title landed scheme bars a foreign buyer outright, this township admits one. Here is what the two statutory contract forms actually differ on.| Schedule G (individual title) | Schedule H (strata) — what applies on all seven phases here | |
|---|---|---|
| Delivery period | 24 months | 36 months |
| Title you receive | Individual title (geran) | strata title |
| Common property | None | Strata common property, with a management corporation, a sinking fund and monthly service charges |
| Late-delivery damages | Computed on the purchase price | Computed on the purchase price under the Schedule H mechanic |
| Defect liability period | 24 months | 24 months |
| Foreign buyer in a Selangor main zone | Not permitted on standard individual-title landed | Permitted — subject to the RM2,000,000 floor and to State Authority consent under the filed restriction in interest |
19085-1 the restriction status is UNKNOWN because no advertisement was ever filed, so ask for a title search instead of reading across from its siblings. One honest gap: the state guidance additionally conditions landed-strata on the scheme being gated and guarded. The developer publishes “24-hour multi-tiered security” on one precinct page, and no filing on this licence contains any security item at all — so treat that condition as probably met on marketing evidence only, and get it confirmed.What is the tenure, and how much lease is left?
| Code | Precinct | Tenure, as filed | Lease expiry | Remaining term today | What it bears on |
|---|---|---|---|---|---|
-1 | Phase 1 | NOT PRINTED — no filing exists | UNKNOWN | UNKNOWN for 279 homes | Ask for a title search before you rely on anything |
-2 | The Amber Residence | Pajakan Sementara 99 years | 19 April 2116 | about 89.5 years | Resale pricing and financing tenor |
-3 | Lucent (probable) | Pajakan sementara 99 years | 19 April 2116 | about 89.5 years | Resale pricing and financing tenor |
-4 | Luxura Residence | Temporary leasehold 99 years | 19 April 2116 | about 89.5 years | Resale pricing and financing tenor |
-5 | Levane Residences | State lease 99 years | 30 July 2122 | about 95.8 years | 6.3 years more than the 2116 phases |
-6 | Quayside Plaza | Pajakan Sementara 99 years | 19 April 2116 | about 89.5 years | Resale pricing and financing tenor |
-7 | The Clove Signature | Pajakan negeri 99 years | 26 November 2124 | about 98.1 years | The longest term on the licence — 8.6 years more than the 2116 phases |
Tiada on both, while -2, -3, -4 and -6 are charged to Public Bank Berhad. And the lease expiry on your own title is the one that counts: the figures above are the filed and registered dates for the phase, and the date on the actual title for the unit you are buying is what you should ask for in writing.Are the prices on this page the prices I will pay?
19085-7 14 of 14, 19085-5 10 of 10, 19085-4 4 of 4 and 19085-6 3 of 3, with no splice, no orphan figure and no stale minimum, and the unit counts reconcile too. That is worth saying plainly, because it is not the norm. But two phases do not reconcile and you should know which. 19085-3’s register band matches NEITHER filed figure on all four of its rows, and it carries an orphan figure to the sen, RM1,717,018.08, that appears in no filed document; the cause is a generation gap — the only brochure the filing system serves for that record prints a licence and a permit that both expired in 2022, while the register’s permit for the same record is a 2023 one. No current-generation filed advertisement for it is reachable at all. And 19085-2’s register minimum, RM232,500, sits BELOW its filed minimum of RM250,000, with the maximum lower too — the reverse of the usual direction. So read every row; do not generalise from the four clean phases. Summed across the licence, the filed and registry per-type figures give a licensed residential development of RM2,467,703,958.40 at the minima and RM3,903,539,100 at the maxima over 2,325 units — this page’s own arithmetic, labelled as such, because no township development value is published by anybody. The authoritative figure for any individual unit is the price list and the sale and purchase agreement at the sales gallery. There is also a disclosure in the register section above about one figure this page deliberately withholds, and why.What oddities are in the filings for this township?
| What was found | Where | Why it matters to a buyer |
|---|---|---|
| THREE generations of one statutory block inside a SINGLE filed PDF, yielding five completion dates for one scheme | 19085-2 — May 2021, June 2023 and a placeholder version, against the register’s original 21 Jun 2021 and revised 21 Sep 2022, plus a portal’s two readings | The brochure’s own June 2023 matches NEITHER contractual date. Get the governing date in writing, in the sale and purchase agreement, not from a brochure |
| A placeholder permit NUMBER with GENUINE validity dates — a new variant | 19085-5 filed as XXXXX-X/XX-XXXX/XXXX(X)-(X) but with real dates 28 Jul 2023 – 27 Jul 2026, which match the register exactly | So lapse was still assessable from the brochure alone, unlike the usual blank or dash placeholder |
| The placeholders got WORSE over time on this licence, not better | The three OLDEST filings (-2, -3, -4) print REAL permit numbers; the three NEWEST (-5, -6, -7) print placeholders | The opposite of a developer cleaning up its filings over time. Always read the permit off the register, not off the brochure |
The register prints an (N) permit suffix on the only actively-selling residential phase | 19085-7/01-2029/0055(N)-(S), valid 21 Jan 2026 – 20 Jan 2029 | A new shape: usually it is the developer that publishes an (N) while the register says (A). Recorded exactly as printed and flagged as a question, not as a defect |
The developer prints (N) where the register prints (A) for the same serial and the same dates | 19085-4/02-2026/0121 | The standard direction, and harmless here — but it is why the register, not the brochure, is the source on this page |
| Three lease expiries across one licence | 19 Apr 2116, 30 Jul 2122 and 26 Nov 2124 — an 8.6-year spread in remaining term | It bears directly on resale and on financing tenor, and nobody sets it out. See the lease table in this FAQ |
| A filed GPS coordinate 7.5 km away from its six siblings | 19085-7 at 2.964336 / 101.623321, against a 1 km cluster for -1 to -6 | Most probably a register data-entry error, but it is unresolved, and a client relying on it would be sent to the wrong place |
| One Gamuda business address filed under THREE different districts | The identical Quayside Tower, Persiaran Freesia, 42500 address reads Kuala Langat on this licence, Petaling on two others and Gombak on a fourth | Never read a district off the register’s business-address field. Three of the four contradict the address’s own 42500 postcode |
| Two brochures still printing an expired developer licence | 19085-2 and 19085-3 print 19085/07-2022/0052(A), which expired 18 Jul 2022 | Harmless on completed phases, but it is the reason to check the licence number against the register at the date you sign |
The register’s keluasan field is a BUILT-UP in square metres, not a land area | 19085-1 reads 197–341 mps, echoing its own component rows exactly; 19085-2 reads 61 mps, about 657 sq ft | It is why no density figure can be computed for any phase, and why this page prints none |
statusPemaju: Aktif, mempunyaiKesalahan: null, zero sick projects and zero abandoned projects. They are reasons to read the register rather than the brochure, and to get the governing date, the permit and the title particulars in writing.Is twentyfive7 green-certified?
RES v3.3. The Clove Signature — BRONZE, provisional, 30 July 2025, RES v3.3. Levane Residences (Phase 3B) — BRONZE, provisional, 4 June 2025, RES v3.3. All three are registered to Gamuda Land (Kemuning) Sdn Bhd. That the tool is the residential one matters: a non-residential rating on a community building would say nothing about any home, and here the ratings attach to the homes themselves. But the word is PROVISIONAL every time. None of the three is a final certification, and this page will not write “certified” where the register says provisional. And here is the part that deserves credit: the developer advertises nothing green on the township page or on any precinct page. This is a real, unadvertised rating. Three decoys were refused, and they are the most seductive this series has met: there are THREE rows named for the word “Clove” across three different Gamuda licensees — this township’s The Clove Signature, a Gamuda Garden Clove (Phase 13) belonging to a different licensee and issued SEVEN DAYS later, and a Gamuda Cove, The Clove belonging to a third. Same group, same marketing word, same tier, same provisional status, same tool version. The only discriminator is the licensee, and this page refuses by licensee. Two honest limits: the top tier closed completely with no entry for this licensee, which is a genuine clean negative, but the Gold, Silver and Bronze tiers all truncate, so for those the honest form is “no further entry in the reachable portion” and never a clean negative; and the entry list that yielded Quayside Plaza’s tool code covers only 10 October 2014 to 1 July 2025, so it misses later rows in its own tier table. The other national green-building directory returns server errors throughout, so its absence is inconclusive and is not read as a negative.Has twentyfive7 won any awards?
How dense is it? How many homes per acre?
Keluasan Tanah — land area — is NOT PRINTED in any of the six filed brochures. The register’s keluasan field reads 0 mps on -4, -5, -6 and -7, and on -1 and -2 it is a BUILT-UP in square metres rather than a land area — -1 reads 197 to 341 mps, which exactly echoes its own component rows’ unit areas, and -2 reads 61 mps, about 657 sq ft, which matches a portal’s figure for one of its unit types. And no press report, portal, annual report or developer page publishes a parcel area for any precinct. The 257-acre township figure IS well corroborated — it appears in the developer’s own project header and in a figure attributed to its chief operating officer in the press nine years earlier, two independent surfaces — but it cannot be cross-checked against any phase, and on a township page it is exactly the wrong denominator. Dividing 2,325 licensed homes by 257 acres is meaningless twice over: those 257 acres also carry the mall, the two commercial precincts, the central park and the promenade, and the 2,325 excludes every unlicensed commercial unit. So this page refuses the division and explains why rather than printing a tidy number. Four other denominators were refused for the same kind of reason: the township acreage printed on a precinct page (the precinct pages inherit the township’s whole amenity block, so a reader will attach 257 acres to The Clove Signature — it is not The Clove Signature’s parcel); the central park and promenade, which are open space and not any phase’s land; the mall’s “330,000 sq.ft.”, which is retail floor area and not land, and which the developer’s own page and its COO disagree about (330,000 against 300,000 net lettable); and a third-party sports facility on the amenity list, which is not a project asset. Luxura is the only phase with filed lot DIMENSIONS, and even there the split between edge and middle variants is not filed, so its saleable area cannot be totalled reliably. The honest form is: 257 acres, township-level, corroborated on two independent surfaces; no phase parcel area exists; therefore no density figure is publishable.What about the mall and the shop lots? Am I protected if I buy one?
Is Broadleaf at Kota Kemuning part of twentyfive7?
13053, licence 13053/04-2028/0551(A), at the Home Tree township in Daerah Klang — a different licensee, a different licence, a different township and a different district from twentyfive7. Both of its registered phases are already Siap Dengan CCC, that is completed. It shares nothing with twentyfive7 but the words “Kota Kemuning” in an address line. It needs its own page and its own research job, and it will get one. And a second confusion worth clearing at the same time: Kota Kemuning proper — the township itself — was built by Hicom-Gamuda Development Sdn Bhd, developer code 6784, which carries 61 project records of which 44 use the words Kota Kemuning, all long completed. That is a different licensee again. Nothing in licence 6784 is twentyfive7, and nothing in licence 19085 is Kota Kemuning proper.What should I ask for before I sign anything here?
Get the filed particulars for the phase you are actually looking at
Seven register codes, two of them selling, and five completed. The right answer depends entirely on which one you mean. Louis will send you the filed advertisement particulars for that register code, the statutory sale and purchase agreement form, the per-type schedule mapped to the filed codes, and the list of things nobody publishes — so you know what you are still missing before you commit.
Louis Koh, Director, LK Group Marketing · IQI Realty Sdn Bhd · Registered Estate Agency. Marketing information, not an offer. Filed statutory Unit Selling Price ranges and public registry bands only — not a price list, not a quotation, not an offer.
Louis Koh
Director, LK Group Marketing · IQI Realty Sdn Bhd · Registered Estate Agency
Over a decade selling Johor Bahru and Klang Valley property, and the reason this page reads the way it does: the filed statutory particulars come first, every hard number is attributed to a named published source, and where the developer’s own two documents disagree the page shows both and says so. On this township that honesty costs the developer four disagreements and credits it with five — a clean licence renewal, a clean conduct record, 100% licensed residential coverage, 31 of 31 price rows matching the register to the sen, and two phases delivered early with no extension at all. If a figure is not on this page it is because nobody published it, and Louis will go and ask for it.
Published 13 October 2026 · last verified 13 October 2026. Sources: the public KPKT TEDUH register developer record for code 19085 and project records 19085-1 through 19085-7; the six filed HIMS advertisement documents for 19085-2 to 19085-7 (19085-1 has none); the GreenRE certification register across all four tiers plus one certification-entry list; the developer’s own township, precinct and accolades pages; a public construction record for the Quayside Plaza commercial component; and the named press, portal and foreign-ownership sources cited above, including IQI’s own land guide. · Marketing information, not an offer. Confirm every figure against the filed advertisement particulars and the Schedule H sale and purchase agreement before you commit.
19085-7300 landed homes · Jadual H, strata title · 99-yr lease to 26 Nov 2124 · filed RM1,922,800 – RM3,909,800 · 13.23–49.58% built · VP 25 Jan 2029Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: Gamuda Land (4 developments on this site)
Where it is: Telok Panglima Garang, Selangor
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
19085-1 · GAMUDA KEMUNING
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Berkembar 2 storeys Siap Dengan CCC | — | 293 m² ≈ 3,154 sq ft | 12 | RM2,196,480.00 – RM2,806,920.00 | 100.00% |
| Rumah Berkembar 3 storeys Siap Dengan CCC | — | 314 m² ≈ 3,380 sq ft | 8 | RM2,600,180.00 – RM3,032,320.00 | 100.00% |
| Rumah Berkembar 2 storeys Siap Dengan CCC | — | 281 m² ≈ 3,025 sq ft | 12 | RM1,790,800.00 – RM2,532,070.00 | 100.00% |
| Rumah Berkembar 2 storeys Siap Dengan CCC | — | 293 m² ≈ 3,154 sq ft | 50 | RM2,109,580.00 – RM2,858,670.00 | 100.00% |
| Rumah Berkembar 3 storeys Siap Dengan CCC | — | 341 m² ≈ 3,670 sq ft | 16 | RM2,894,980.00 – RM3,389,970.00 | 100.00% |
| Rumah Teres 3 storeys Siap Dengan CCC | — | 259 m² ≈ 2,788 sq ft | 53 | RM1,261,800.00 – RM2,181,320.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | — | 197 m² ≈ 2,120 sq ft | 65 | RM1,021,800.00 – RM1,670,720.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | — | 236 m² ≈ 2,540 sq ft | 63 | RM1,315,380.00 – RM1,771,920.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-1. Re-read weekly.
19085-7 · GAMUDA KEMUNING 25.7
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 24 | RM2,496,800.00 – RM2,539,800.00 | 53.75% |
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 24 | RM2,467,800.00 – RM2,539,800.00 | 53.75% |
| Rumah Kluster 2 storeys Lancar | 4 / 3 | — | 24 | RM1,922,800.00 | 53.75% |
| Rumah Kluster 2 storeys Lancar | 4 / 3 | — | 24 | RM1,922,800.00 | 53.75% |
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 65 | RM2,151,800.00 – RM2,313,800.00 | 16.46% |
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 65 | RM2,151,800.00 – RM2,313,800.00 | 17.23% |
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 5 | RM2,427,800.00 – RM2,466,800.00 | 26.00% |
| Rumah Kluster 2 storeys Lancar | 4 / 4 | — | 5 | RM2,423,800.00 – RM2,467,800.00 | 26.00% |
| Rumah Kluster 3 storeys Lancar | 5 / 5 | — | 16 | RM2,819,800.00 – RM2,982,800.00 | 30.63% |
| Rumah Kluster 3 storeys Lancar | 5 / 5 | — | 16 | RM2,819,800.00 – RM2,982,800.00 | 29.06% |
| Rumah Kluster 3 storeys Lancar | 5 / 5 | — | 2 | RM3,051,800.00 – RM3,103,800.00 | 50.00% |
| Rumah Kluster 3 storeys Lancar | 5 / 5 | — | 2 | RM3,060,800.00 – RM3,089,800.00 | 50.00% |
| Rumah Berkembar 2 storeys Lancar | 5 / 5 | — | 14 | RM3,642,800.00 – RM3,909,800.00 | 36.43% |
| Rumah Berkembar 2 storeys Lancar | 5 / 5 | — | 14 | RM3,642,800.00 – RM3,881,800.00 | 36.43% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-7. Re-read weekly.
19085-6 · QUAYSIDE PLAZA
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 36 storeys Lancar | 6 / 4 | — | 3 | RM2,126,800.00 | 97.50% |
| Pangsapuri Servis 36 storeys Lancar | 3, 4 / 3 | — | 25 | RM1,238,800.00 – RM1,263,800.00 | 97.50% |
| Pangsapuri Servis 36 storeys Lancar | 1, 2, 3 / 1, 2, 3 | — | 437 | RM250,000.00 – RM1,037,800.00 | 93.06% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-6. Re-read weekly.
19085-3 · GAMUDA KEMUNING
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 3 storeys Siap Dengan CCC | 6 / 5 | 0 – 197 m² | 30 | RM1,717,018.08 – RM3,178,560.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | — | 0 – 256 m² | 131 | RM1,384,416.00 – RM2,152,560.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-3. Re-read weekly.
19085-5 · GAMUDA KEMUNING
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 2 storeys Siap Dengan CCC | 3 / 3 | — | 33 | RM930,800.00 – RM1,821,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 3, 4 | — | 73 | RM1,329,800.00 – RM1,850,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 3 | — | 35 | RM1,329,800.00 – RM1,850,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | — | — | 11 | RM1,980,800.00 – RM2,010,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 2 | RM2,677,800.00 – RM2,736,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 3 / 3 | — | 33 | RM1,316,800.00 – RM1,821,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 3, 4 | — | 46 | RM1,344,800.00 – RM1,919,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 120 | RM1,437,800.00 – RM2,061,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 11 | RM2,035,800.00 – RM2,065,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 4 | RM2,527,800.00 – RM2,709,800.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-5. Re-read weekly.
19085-2 · GAMUDA KEMUNING
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 23 storeys Siap Dengan CCC | 2 / 1 | 61 m² ≈ 657 sq ft | 275 | RM250,000.00 – RM950,040.00 | 100.00% |
| Pangsapuri Servis 23 storeys Siap Dengan CCC | — | 61 m² ≈ 657 sq ft | 321 | RM232,500.00 – RM861,360.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-2. Re-read weekly.
19085-4 · GAMUDA KEMUNING
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Teres 2 storeys Siap Dengan CCC | 5 / 4 | — | 26 | RM1,951,800.00 – RM2,913,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4, 5 / 4 | — | 27 | RM1,833,800.00 – RM2,710,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 39 | RM1,972,800.00 – RM2,471,800.00 | 100.00% |
| Rumah Teres 2 storeys Siap Dengan CCC | 4 / 4 | — | 64 | RM1,551,800.00 – RM2,447,800.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-23, project code 19085-4. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.
How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.
No floor plan is reproduced on this page — but the drawings are findable
A floor plan is the developer’s copyright. This site does not mirror one and let you assume it is official. What it can do is send you to the drawing itself.
The advertisement the developer filed and the housing department approved normally carries the location plan and the unit count and price for each type. A salesperson’s brochure can be reissued. This one cannot.
The drawing that binds the developer is the one attached to your own sale and purchase agreement. Anything on any website is a reference copy — check the schedule to your contract before you sign.