TRIA Residences @ 9 Seputeh
A completed MRCB building that no longer has a published project page. Almost every number you will read about it online is unverified — including the tenure. Here is what actually checks out, and the one document that settles the rest.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation
TRIA Residences @ 9 Seputeh at a glance
This page looks different from the rest of this website, and it should. TRIA is finished: there is no launch, no price list, no advertising permit still running and no developer microsite. MRCB Land has retired the project page and the standalone 9 Seputeh domain does not resolve. What that leaves is a lot of confident-sounding specification circulating on listing sites with nothing behind it — including one unit schedule that contradicts itself. So instead of restating those numbers, the table below tells you exactly which facts survive verification and which do not. For a completed building that is far more useful, because everything marked unpublished here can be settled by you in a single afternoon with a land search.
- Developer
- Malaysian Resources Corporation BerhadProperty arm trades as MRCB Land
- Official project name
- TRIA Residences @ 9 SeputehMRCB's own wording; commonly shortened to Tria Seputeh
- Masterplan
- 9 SeputehThe other residential phase is VIVO Residential Suites
- Corridor
- Old Klang RoadMRCB places the neighbouring phase in Old Klang Road
- Build status
- CompletedListed by MRCB among built properties, not current launches
- Tenure
- Not published by MRCBSettle it with a strata title search before you commit
- Total units
- Not published by MRCBA figure circulates in agent listings; it is unverified
- Tower names
- Not published by MRCBThree names circulate; none appears in MRCB material
- Unit sizes
- Not published by MRCBThe circulating schedule contradicts itself; see the layouts section
- How you buy it
- Subsale from an ownerNo developer price list exists for a completed scheme
- Foreign buyers
- Only above RM1,000,000Tested on your agreed resale price, not on a launch price
- Project microsite
- RetiredMRCB Land publishes no project page for TRIA
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Five things that decide whether TRIA suits you
The single most important thing about this building is that it is already built, and that changes the nature of the purchase completely. You are not buying a rendering and a completion date; you are buying a specific unit in a specific block with a specific management corporation, a specific service charge history and a specific set of neighbours. Every one of those can be inspected before you commit — which means the risks here are the opposite of a new launch's. Nothing is uncertain about the delivery. Everything is uncertain about the paperwork, because MRCB no longer publishes any of it.
You can inspect everything, so inspect everything
This is the genuine advantage of a completed building and most buyers waste it. You can walk the corridors at night, see how the lifts are running after several years of use, look at the actual finishes rather than a show unit, check whether the car park floods, and read the management corporation accounts. You can also talk to residents, who will tell you things no seller will. A new launch offers none of this. If you are going to view, block out two hours, not twenty minutes.
Nobody has published the tenure, and that is a one-day question
MRCB publishes no tenure for TRIA. Listing copy states a 99-year leasehold; I cannot verify that anywhere, and on a completed building you should never need to. The strata title exists, the vendor has it, and a land search will show you the tenure, the expiry date if there is one, the registered floor area and any restriction in interest, all on one document. Ask the vendor's solicitor for it before you pay a booking fee. If a lease term does apply, the remaining years feed directly into what a bank will lend you and what the next buyer will pay.
The unit schedule circulating online contradicts itself
The same widely copied table describes the top series as running to nearly 2,900 sq ft and, three lines later, lists a dual-key layout in that same series at around 1,156 sq ft. Both cannot be right. This is what happens when a specification is copied from listing to listing long after the developer has taken the original down: errors propagate and nobody owns them. Treat every figure in that table as unverified, including the ones that look plausible.
A listed developer, and that still counts after handover
MRCB is Bursa-listed, was established in 1968, and built KL Sentral. For a completed building the developer's identity matters less than it does at launch, but it is not irrelevant. It tells you the original construction was procured by an organisation with public reporting obligations rather than a single-project vehicle, and it means any defect liability history from the handover period is traceable to a company that still exists and still files accounts. That is not true of every completed condominium in this corridor.
For a non-citizen the test is your price, not the launch price
Kuala Lumpur's RM1,000,000 minimum for non-citizens is applied to the consideration in your sale and purchase agreement. On a subsale that is the price you negotiate today, not whatever the unit sold for when the building was new. So a larger layout here may well qualify while a smaller one does not, and the line can move between one unit and the next in the same block. Establish the number before you negotiate, because a price agreed below the threshold cannot simply be written up afterwards to make the consent application work.
The whole development, decoded
There is no tower switcher here because MRCB does not publish one. What follows instead is the thing that actually determines your outcome on a completed building: which of the two purchase routes you are on. They carry different protections, different costs and completely different negotiating positions.
Two ways to buy a finished building, and they are not the same transaction
Subsale — buying from an existing owner
You negotiate with an individual, not a developer, and almost everything changes as a result. There is no fixed price list, so the number is whatever you and the vendor agree, informed by recent transactions in the same block. There is no Housing Development Act protection and no liquidated damages clause, because the building is finished and the statutory scheme does not apply to a resale. Payment runs on the standard subsale timeline through both solicitors, and you inherit the unit as it stands, including any outstanding maintenance arrears — so make the arrears search a condition. In exchange you get certainty of delivery, an inspectable product and, usually, a tenant already in place or the ability to move in next month.
Developer stock — only if any is left
Unsold developer stock in a completed building is a real thing, but it needs proof. If anyone offers you a unit as developer stock, ask for the current advertising and sale permit number, or the certificate of completion and compliance together with written confirmation that MRCB still holds the title. A completed scheme with unsold units is usually sold as completed inventory rather than under a construction-stage agreement, so the Housing Development Act protections you would get on a launch may not apply in the way you expect. The advantage, when it is genuine, is a clean chain of title and a unit that has never been occupied. Get the evidence first, then decide.
What is on the record, and what is not
Every entry in the first column comes from MRCB's own corporate website. Every entry in the second circulates widely in listing copy and I have been unable to trace any of it to MRCB, to a government source, or to anything I could check myself. The third column is what you can establish on your own, cheaply, in about a day — and it is the column that matters most on a completed building.
On the record — MRCB's own website
- TRIA Residences is listed by MRCB among its residential and commercial properties
- The masterplan is 9 Seputeh, and the second residential phase there is VIVO Residential Suites
- MRCB places the 9 Seputeh residential phases on Old Klang Road
- MRCB describes TRIA as set in an immaculate natural setting, catering to residents lifestyle needs
- MRCB was established in 1968 and is listed on Bursa Malaysia
- Its flagship is Kuala Lumpur Sentral CBD, and it originated transit-oriented development in Malaysia
Circulating, but unverified
- A specific total unit count
- Three named towers and a set of villas
- A 99-year leasehold tenure
- A site area figure in acres
- A per-floor unit count
- A full X, Y and Z unit schedule with exact areas
What you can settle yourself in a day
- Strata title search — tenure, expiry, registered area, restrictions
- Management corporation accounts and the current service charge rate
- Outstanding maintenance arrears on the specific unit
- Recent transacted prices in the same block
- Certificate of completion and compliance, on developer stock
Where the project is now
All 3 TRIA Residences @ 9 Seputeh floor plans
MRCB publishes no floor plans for TRIA. What circulates is a three-series schedule — an X series of smaller apartments, a Y series in the middle and a Z series at the top — and it contains a mistake that tells you how carefully it was assembled. The same table describes the Z series as running from roughly 1,733 to 2,874 sq ft while separately listing a dual-key Z-series layout at about 1,156 sq ft. Those two statements cannot both be true, and once one line in a schedule is wrong you cannot rely on any of the others. So this section gives you the series names as they circulate, flags what is unverified, and tells you the only sizes that will ever matter to you: the ones on the strata title of the specific unit you are buying.
The X series — the smaller apartments
Get this floor planThe Y series — the middle band
Get this floor planThe Z series — and the contradiction in the schedule
Get this floor planInside TRIA Residences @ 9 Seputeh










Where TRIA Residences @ 9 Seputeh sits
TRIA sits inside the 9 Seputeh masterplan, off Jalan Klang Lama, on the corridor that runs between Mid Valley and the Old Klang Road interchanges. MRCB describes the sister phase in the same masterplan, VIVO Residential Suites, as located in Old Klang Road — the developer's own words, and the reason this page treats the address as an Old Klang Road corridor address that carries a Seputeh name.
Mapped by the registered project name because MRCB publishes no coordinate, no Plus Code and no street number for TRIA. If you are viewing a unit, take the exact block and address from the vendor's title document rather than from any listing, including this page.
- Jalan Klang Lama frontagethe corridor itselfMRCB places the 9 Seputeh phases on Old Klang Road
- VIVO Residential Suites @ 9 Seputehsame masterplanMRCB's other residential phase on the site
- Mid Valleydistance not publishednamed constantly in marketing, never measured
- Bangsardistance not publishedthe corridor runs that way; no figure from MRCB
- Kuala Lumpur city centredistance not publishedI will time the drive in real traffic if it matters to you
- Nearest rail stationdistance not publishedcheck on your viewing; this is a car-first corridor
Registered as Residensi Tria Seputeh — 505 units, complete with CCC, and 9 Seputeh has five more permits
| Project code | Registered name | Licensed developer | Advertising permit | Permit expired | Units | Built-up | Price band on the permit | Built | Status |
|---|---|---|---|---|---|---|---|---|---|
| 12160-3 | Residensi Tria Seputeh | MRCB Seputeh Land Sdn Bhd (12160) | 12160-3/09-2023/0040(R)-(S) | 23 Sep 2023 | 343 | 71 sq m | RM644,860 – RM1,823,800 | 100% | Siap Dengan CCC |
| 12160-3 | Residensi Tria Seputeh | as above | as above | as above | 162 | 141 sq m | RM1,194,800 – RM4,870,800 | 100% | Siap Dengan CCC |
| Total | 505 | District: Kuala Lumpur | |||||||
| Other permits under the same licence: 12160-1, -2, -4, -5 all registered as 9 Seputeh; 12160-6 registered as Residensi Lunar | |||||||||
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 27 August 2026. Pull it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=12160-3
Two fields agree exactly
The registered name is Residensi Tria Seputeh — the marketing name, unusually, almost unchanged. And the licensed company is MRCB Seputeh Land Sdn Bhd, which this page names. “9 Seputeh” is the township name, and it is registered separately: four further permits under this same licence carry it as their project name.
That matters when you request documents. Asking about “9 Seputeh” will get you the township, which is five different permits. Asking about Residensi Tria Seputeh, project code 12160-3 gets you this building.
Completed — and the permit expiry is not a warning
The licence lapsed on 23 September 2023 and both components are 100% complete with Certificates of Completion and Compliance issued.
An advertising and developer’s licence exists so that units which do not yet exist may be sold. Once the building is finished there is nothing left to sell off-plan and the licence is simply not renewed. That is the normal end of the process, not a lapse.
An expired permit is a warning sign in the opposite case — a project still under construction, still being marketed, with a permit date in the past. That is not this building.
Two very different products in one development
Read the built-up column, then the price column.
343 units at 71 sq m (about 764 sq ft), permitted at RM644,860 to RM1,823,800.
162 units at 141 sq m (about 1,518 sq ft), permitted at RM1,194,800 to RM4,870,800.
The larger units are twice the floor area but were permitted at up to 2.7 times the ceiling of the smaller ones. That extra is not floor area — it is height, aspect and view, and on the large units the spread within a single type is itself four to one.
Two consequences worth carrying into a viewing:
Any per-square-foot figure quoted for “Tria” without naming the unit type is an average of two different products and will not describe what you are being shown.
The maintenance charge is levied per square foot of your own unit. A 141 sq m unit pays roughly double what a 71 sq m unit pays, every month, for the same lifts, the same pool and the same security. On a completed building you can ask for the actual current figure rather than a projection — do.
The questions that matter on a finished building
Strata title status — issued and transferred, or still on a master title?
The management corporation’s audited accounts and arrears rate. Arrears are the best available predictor of deferred maintenance, and deferred maintenance is what erodes resale value.
The current maintenance charge and sinking fund per square foot, and when they were last revised.
The defect liability position. With CCCs issued in or before 2023, the DLP has expired. Any defect you find now is yours.
Foreign buyers
Kuala Lumpur’s minimum purchase price for a non-citizen is RM1,000,000. The permitted bands here straddle it: the smaller units start well below, the larger ones start above and run to RM4,870,800.
On a completed building the test is applied to the price on your own sale and purchase agreement, not to the launch-era permit band. Get the actual figure in writing and check it yourself. Clearing the price floor only entitles you to apply for state consent, which is granted transaction by transaction.
And to be clear about what the band is: a legal ceiling the developer could not exceed at launch. It is not an asking price and it is not evidence of what this building is worth today.
About Malaysian Resources Corporation Berhad
The developer is Malaysian Resources Corporation Berhad, listed on Bursa Malaysia and established in 1968. Its property arm trades as MRCB Land. If you have taken a train through KL Sentral, you have walked through MRCB's flagship — the company is the originator of transit-oriented development in Malaysia and KL Sentral CBD is the project that proved the model here.
The rest of the portfolio is consistent with that: Petaling Jaya Sentral Garden City, Penang Sentral, Kwasa Sentral, and The Symphony Centre in Auckland, a 21-storey mixed-use and transport building developed with RCP in partnership with Eke Panuku Development Auckland. Under residential and commercial properties MRCB lists Sentral Suites in the Kuala Lumpur CBD, 1060 Carnegie in Melbourne, Kalista Park Homes and Alstonia Hilltop Homes in Bukit Rahman Putra — and both 9 Seputeh phases, TRIA Residences and VIVO Residential Suites.
Being listed is the practical point for a buyer here. MRCB publishes an integrated annual report, files with Bursa Malaysia, and reports through a public investor relations function. Whatever you want to know about the group's financial position is on the record and you can read it yourself. I have not reproduced any of those figures on this page because I have not read the current filings, and this website only carries numbers I have checked myself.
There is one thing about MRCB's own publishing that a buyer should know, because it shapes this entire page. MRCB Land's website no longer serves project pages. The domain resolves to a holding page pointing at a virtual gallery, there is no TRIA page on it, and the standalone 9 Seputeh domain does not resolve at all. For a completed project that is unremarkable — developers retire microsites once a scheme is sold and handed over — but it means the detailed specification for TRIA is no longer published by anyone with authority over it. That is why so much of what circulates about this building cannot be checked, and why this page is shorter and blunter than the ones for projects still selling.
Frequently asked questions
Is TRIA Residences @ 9 Seputeh freehold or leasehold?
MRCB does not publish the tenure, and I am not going to state one on its behalf.
Listing copy widely describes it as leasehold with a 99-year term. I have been unable to trace that to MRCB, to a government source, or to any document I could read myself, so it stays off this page as a fact.
Here is the good news: on a completed building this is the easiest question in the whole transaction to answer definitively. The strata title already exists. A land search on the specific parcel returns the tenure, the expiry date if there is one, the registered floor area, the registered proprietor and any restriction in interest, on a single document. Your solicitor can order it, and the vendor should already hold a copy.
Do that before you pay a booking fee, not after. If a lease term does apply, the remaining years drive two things that decide your outcome: the loan margin and tenure a bank will offer you, and what the buyer after you will be willing to pay. A lease with sixty-something years left is a materially different asset from one with ninety.
If you send me the block and unit number I will arrange the search and read it with you.
Can a foreigner buy at TRIA Seputeh?
Yes in principle, but only if the price you agree is above RM1,000,000, and on a completed building that test lands differently from a new launch.
Kuala Lumpur applies a RM1,000,000 minimum purchase price to non-citizens acquiring residential property. On a subsale the figure tested is the consideration in the sale and purchase agreement you sign today, not what the unit originally sold for. So whether a given unit qualifies depends on today's negotiated price, and the answer can differ between two units on the same floor.
Because MRCB no longer publishes a unit schedule, you cannot work out from any brochure which layouts are likely to clear the line. You work it out from actual transacted prices in the block, which I can pull for you.
Costs to budget. A non-citizen pays a flat 8 per cent stamp duty on the transfer of residential property from 1 January 2026. Real property gains tax on a future sale is 30 per cent within five years and 10 per cent from the sixth year, with no zero band. Financing for a non-resident is typically 60 to 70 per cent of price, and on an older building a bank may also apply a shorter loan tenure.
You will need state consent. In the Federal Territory the application under section 433B of the National Land Code goes to the Jawatankuasa Kerja Tanah Wilayah Persekutuan Kuala Lumpur, the Kuala Lumpur Federal Territory Land Working Committee. Build that timeline into your offer, because on a subsale the vendor is waiting on it too. Note also that foreign interest includes Malaysian permanent residents.
Why does this page have so few specifications?
Because MRCB has taken the source material down, and I do not republish specifications I cannot trace to the developer.
MRCB Land's website currently serves a holding page pointing to a virtual gallery rather than individual project pages, and there is no TRIA page on it. The standalone 9 Seputeh domain does not resolve. What remains on MRCB's corporate website is a short paragraph listing TRIA Residences among its residential and commercial properties.
This is normal for a completed and handed-over scheme. Developers retire project microsites once the last unit is sold, and there is no obligation to keep them running. What is not normal is how confidently the vacuum gets filled: listing sites carry unit counts, tower names, tenure and full unit schedules, all presented as fact, none of it attributable, and at least one internal contradiction I can point to.
So this page tells you what MRCB says, tells you what it does not say, and shows you how to obtain the rest yourself. On a completed building that is genuinely a better deal for you than a page full of borrowed numbers — because the strata title of the unit you actually buy is the only specification that has any legal effect.
How do I buy a unit here, and how is it different from a new launch?
Almost certainly by subsale, from an individual owner, and the differences are worth spelling out because they change what protects you.
On a new launch you sign a statutory sale and purchase agreement under the Housing Development Act, pay by progress billing, and have a liquidated damages remedy if the developer is late. None of that applies here. The building is finished, so there is nothing to be late about, and the transaction is a straightforward transfer between two private parties.
What replaces those protections is due diligence you control. A land search on the strata title. A copy of the management corporation accounts and the current service charge rate. A search for outstanding maintenance arrears on that specific parcel, which you should make a condition of the agreement because arrears attach to the unit. A physical inspection, at night as well as in daylight. And comparable transacted prices in the same block, which set your negotiating floor.
The timeline is also different. A subsale in Kuala Lumpur typically completes in three to four months, longer if the title is under a lease requiring consent, and longer again if you are a non-citizen and the section 433B consent has to run.
If someone offers you a unit here as unsold developer stock, treat that as a claim to be verified rather than a fact. Ask who is the registered proprietor on the title today, and get the answer in writing.
Is it in Seputeh or on Old Klang Road?
Both descriptions are used, including by MRCB itself, and knowing that is worth money when you search for comparables.
The masterplan is named 9 Seputeh and the project is marketed as a Seputeh address. On MRCB's own corporate website, the sister phase in the same masterplan, VIVO Residential Suites, is described as located in Old Klang Road.
Neither is wrong. The site sits on the corridor where the two names overlap. But listing platforms file properties under one name or the other, not both, so a buyer searching only Seputeh will miss stock filed under Old Klang Road and vice versa. That fragmentation is why asking prices in this corridor can look inconsistent.
Practical advice: search both names, and when you compare asking prices, compare on price per square foot of registered strata area rather than on headline price, because the unit sizes along this corridor vary far more than the addresses do.
What is the maintenance fee, and how do I find out?
Nobody publishes it, and on a completed building nobody needs to, because the actual figure is a document rather than an estimate.
After handover the service charge is set by the management corporation, not by the developer, and it is revised at general meetings. Any rate quoted in a brochure from the launch era is historical, and any rate quoted in a listing is whatever the agent was last told.
The real number comes from three places. The current charge notice for the specific unit. The management corporation accounts, which also show the sinking fund balance and whether major works are pending. And the minutes of the last annual general meeting, which will tell you whether a rate increase has been proposed.
Ask for all three. The sinking fund balance is the one most buyers skip and the one that hurts most: a scheme with a thin sinking fund and ageing lifts is heading for a special levy, and that levy will land on you, not on the seller.
I request these as standard when a buyer asks me to look at a completed building. Send me the block and unit and I will get them.
Is MRCB a developer I can trust for a resale purchase?
MRCB is about as checkable as Malaysian developers get, and for a resale that matters in a specific and limited way.
The company was established in 1968, is listed on Bursa Malaysia, publishes an integrated annual report, and maintains a public investor relations function. Its flagship is Kuala Lumpur Sentral CBD, and it is the originator of transit-oriented development in Malaysia — its portfolio also includes Petaling Jaya Sentral Garden City, Penang Sentral, Kwasa Sentral and The Symphony Centre in Auckland.
For a completed building, what that buys you is traceability rather than protection. The construction was procured by an organisation with public reporting obligations, and the entity behind the original handover still exists and still files accounts. Compared with a single-purpose vehicle that has since been wound up, that is a meaningful difference if a latent defect question ever arises.
What it does not buy you is any warranty. The defect liability period from the original handover expired years ago and does not transfer to you. Your protection on a resale is the inspection you do and the conditions you put in the agreement.
I have deliberately not quoted MRCB's financial figures anywhere on this page. They are public and you can read them; I only publish numbers I have verified myself.
What should I inspect before I make an offer?
Treat the viewing as an inspection, not a tour. On a completed building this is where your leverage is, and two hours here is worth more than any brochure.
Inside the unit: signs of water ingress at ceilings, window reveals and the bathroom ceiling below the unit above; the condition of the waterproofing in wet areas; whether windows and sliding doors still seal; the age and condition of the distribution board.
In the common areas: lift performance during peak hours, corridor lighting and cleanliness at night, the state of the fire equipment and whether the certificates on it are current, the car park after heavy rain, and whether the visitor management actually works or is a barrier nobody staffs.
On paper: the strata title search, the management corporation accounts, the sinking fund balance, the arrears position on the unit, the last annual general meeting minutes, and any special levy proposed or pending.
And ask a resident. People who live in a building will tell you within five minutes what the management is like, whether there is a water pressure problem on the high floors, and how full the car park gets at night. No listing will tell you any of that.
Send me the unit details and I will do the document side while you do the walk-through.
TRIA or a new launch in the same corridor?
It is a choice between certainty and warranty, and which one you value more usually settles it.
TRIA gives you certainty. The building exists, you can inspect it, you know exactly what the corridors and lifts are like after several years of use, and you can move in or start collecting rent within months rather than years. You also avoid three years of loan interest with no income.
A new launch gives you warranty and disclosure. You get a statutory sale and purchase agreement, a defect liability period, a liquidated damages clause if handover is late, and a developer legally required to publish a licence number, a permit number, a price range and a completion date. Everything TRIA no longer publishes, a launch is obliged to.
The honest financial framing is this. On a resale you pay for a finished product and inherit a building's history, including its maintenance backlog. On a launch you pay in instalments for something that does not exist yet and carry the delivery risk yourself.
If you are a non-citizen there is a further filter: on a launch you can read the price schedule and see immediately which units clear RM1,000,000, while here you have to derive it from transacted prices. That is more work, and it is work I will do for you either way.
Tell me the unit and I will get you the title, the strata area and the real numbers
On a completed building the useful work is not sending you a brochure, it is document work — the strata title, the tenure and any expiry, the registered floor area, the management corporation accounts, the arrears position on the unit and what comparable units in the same block have actually transacted at. Tell me which unit you are looking at and I will get all of it before you sign anything.
On a subsale I act for you on the paperwork, not for the seller
Louis Koh
11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文
I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.
Published 2026-08-11 · Last verified 2026-08-11 against Malaysian Resources Corporation Berhad's published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: MRCB (2 developments on this site)
Where it is: Seputeh, Kuala Lumpur (KL)
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
12160-3 · RESIDENSI TRIA SEPUTEH
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Rumah Pangsa/Kondo 38 storeys Siap Dengan CCC | — | 71 m² ≈ 764 sq ft | 343 | RM644,860.00 – RM1,823,800.00 | 100.00% |
| Rumah Pangsa/Kondo 33 storeys Siap Dengan CCC | — | 141 m² ≈ 1,518 sq ft | 162 | RM1,194,800.00 – RM4,870,800.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-10-17, project code 12160-3. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.
How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.
No floor plan is reproduced on this page — but the drawings are findable
A floor plan is the developer’s copyright. This site does not mirror one and let you assume it is official. What it can do is send you to the drawing itself.
The advertisement the developer filed and the housing department approved normally carries the location plan and the unit count and price for each type. A salesperson’s brochure can be reissued. This one cannot.
The drawing that binds the developer is the one attached to your own sale and purchase agreement. Anything on any website is a reference copy — check the schedule to your contract before you sign.





