The Marin @ Batu Ferringhi, Penang
Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches
Batu Ferringhi, north coast of Penang Island · Completed 2018

The Marin @ Batu Ferringhi, Penang

Two finished 21-storey towers holding 149 freehold homes, four to a floor so that every one is a corner unit, on a hillside plot of over four acres above the Batu Ferringhi beach strip. Both layouts have 3+1 bedrooms, at 1,750 or 1,850 sq ft. The permit band is wholly above Penang Island’s floor for non-citizens, so foreign buyers are eligible with state consent.

FreeholdCompleted · CCC 2018149 homes · 4 a floor1,750 / 1,850 sq ft

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

149homes across two towers
4corner homes on every floor
582 mto SJK(C) Pai Chai, straight-line
The Marin at Ferringhi, two residential towers behind the swimming pool, official image from the developer, Batu Ferringhi, Penang
The Marin · the two towers from the pool deck, image from Plenitude’s project page
The Marin infinity pool on the facilities deck with the sea beyond, image from the developer's project page, Batu Ferringhi, Penang
Infinity pool and the sea beyond · the developer’s image, which carries its tagline
The Marin location map with shopping, healthcare, attractions and schools, published by the developer, Batu Ferringhi, Penang
The developer’s own location map
Answer block

The Marin @ Batu Ferringhi, Penang at a glance

Every figure below comes from the developer’s own published material or the government register. Where neither has published something, it isn’t on this page.

Development
The Marin at FerringhiBy Plenitude Berhad · housing licence held by Plenitude Bayu Sdn. Bhd.
Where it is
Batu Ferringhi, Penang IslandPersiaran Sungai Emas, Kawasan Perumahan Sungai Emas · Daerah Timor Laut
Tenure
FreeholdThe developer describes the site as over four acres of prime freehold land
Building
2 towers · 21 storeysStorey count from the register and from StarProperty (7 July 2015)
Units
149Four homes on a floor · the developer says every home is a corner unit
Layouts
1,750 and 1,850 sq ftType B with 3+1 bedrooms and three bathrooms · Type A with 3+1 bedrooms and four
Facilities
One-acre podiumInfinity lap pool, tennis courts, gymnasium, sauna, jacuzzi and two multipurpose halls
Completion
CompletedCertificate of completion and compliance dated 4 October 2018
Government permit
13646-1/08-2019/02571(P)Valid 15 Aug 2018 to 14 Aug 2019 · no newer permit on the register on 5 Oct 2026
Foreign buyers
Eligible, with state consentThe whole permit band is above Penang Island’s RM1,000,000 strata floor · a resale is judged on its own agreed price
Why this address

The Marin in six points — four in its favour, two to check

This is a building you can walk through today, so the questions are different from those for an off-plan launch. The facts below come from Plenitude’s project page and brochure, a 2015 StarProperty report and the government register.

🏁

It is finished, and has been since 2018

The register shows The Marin at 100% with a certificate of completion and compliance dated 4 October 2018. There is no construction risk left to price in: you can stand in the lobby, ride the lifts, inspect the pool deck and judge eight years of upkeep with your own eyes before you sign anything.

📐

Four homes a floor, all of them corners

The developer’s floor plate shows two Type A homes on the side it labels sea view and two Type B homes on the side it labels forest view, with the lift core between them. Nobody has a neighbour on both sides, and each home is at least 1,750 sq ft with 3+1 bedrooms.

🎾

A one-acre facilities podium for 149 households

Plenitude’s facilities plan numbers 21 items, among them an infinity lap pool, a children’s pool, a jacuzzi, a gymnasium, a sauna, two multipurpose halls, a games room, a reading room and tennis courts. Shared among 149 homes, that is a generous ratio compared with towers three or four times the size.

🏫

Schools within about a kilometre

Straight-line from the register’s pin, the Chinese primary school SJK(C) Pai Chai is 582 m away and The International School of Penang (Uplands) is 1.0 km. Tenby Schools Penang is 3.6 km and Dalat International School 4.0 km, both in Tanjung Bungah. For a family, that covers the national-type and international options without leaving the north coast.

🛣️

One coastal road in and out

Batu Ferringhi is the island’s beach-hotel strip, reached by the winding coast road from Tanjung Bungah. Gurney Plaza is 7.4 km away in a straight line and KOMTAR 10.7 km, and the road distance is longer than either. On weekends and holidays that road fills with visitors. Drive it on a Saturday evening before deciding this is your daily commute.

🔎

The public record has gaps

The last advertising permit on the register expired on 14 August 2019 and no newer one is listed, although the developer still runs a sales gallery for the project. The register’s unit list itemises only 33 of the 149 homes. Neither point is alarming for a completed building, but both mean you should ask in writing who is selling the unit, under which agreement, and what the current charges are.

Project DNA

The whole development, decoded

Every number here is the developer’s own or the government register’s.

149Units
2Towers
21Storeys
4Homes a floor

Facilities, level by level

Taken from the numbered legend on Plenitude’s facilities plan, which marks a few rooms as Level 1 or Level 2. The developer describes the whole deck as a one-acre facilities podium; StarProperty’s 2015 report put the infinity pool at 40 metres long.

Water and garden

Facilities podium
  • Infinity lap pool
  • Children’s pool
  • Jacuzzi
  • Pool deck
  • Floating deck
  • Yoga deck
  • Reflexology path
  • Open lawn
  • Soothing garden
  • BBQ corner
  • Pond
  • Open plaza
  • Children’s playground
  • Tennis courts

Indoor rooms

Levels 1 & 2
  • Gymnasium
  • Changing room & sauna
  • Lounge
  • Games room (Level 1)
  • Multipurpose halls (Level 2)
  • Reading room (Level 2)
  • Management office (Level 1)

Arrival

Entrance
  • Guard house
  • Drop-off area

Where the project is now

15 Aug 2014First advertising permit on the register takes effect
24 Dec 2014Date of the first sale and purchase agreement as recorded on the register
7 Jul 2015StarProperty reports the project as two 21-storey towers due in 2018, and its Best Boutique Development (Hi-Rise) award
24 Dec 2017Delivery date under the first agreement — 36 months, Schedule H, no extension recorded
4 Oct 2018Certificate of completion and compliance issued
14 Aug 2019Last advertising permit on the register expires
Oct 2026Completed building · the licensee’s developer licence runs to 2 Sep 2029 and its sales gallery remains open
Layouts

All 2 The Marin @ Batu Ferringhi, Penang floor plans

Two layouts, both with 3+1 bedrooms. Plenitude’s drawings put Type A (1,850 sq ft) on the side of each tower it labels sea view and Type B (1,750 sq ft) on the side it labels forest view. The register records the homes at 163 square metres, which matches Type B.

The Marin Type A floor plan — 1,850 sq ft, 3+1 bedrooms and four bathrooms, Batu Ferringhi, Penang

Type A — 1,850 sq ft

About 171 sqm · 3+1 bedrooms, four bathrooms · on the side the developer labels sea view

🛏 3 Bed🛁 4 BathOfficial drawingSea-view side
Get this floor plan
The Marin Type B floor plan — 1,750 sq ft, 3+1 bedrooms and three bathrooms, Batu Ferringhi, Penang

Type B — 1,750 sq ft

About 162 sqm · 3+1 bedrooms, three bathrooms · on the side the developer labels forest view

🛏 3 Bed🛁 3 BathOfficial drawingForest-view side
Get this floor plan
Location & connectivity

Where The Marin @ Batu Ferringhi, Penang sits

Persiaran Sungai Emas in Kawasan Perumahan Sungai Emas, on the slope behind Batu Ferringhi’s main road in Daerah Timor Laut — 864 m in a straight line from Ferringhi Walk and 1.1 km from the Batu Ferringhi Beach marker on the map.

Open in Google Maps →
📍 5.477033, 100.25565411100 Batu Ferringhi

Pinned to the coordinates filed with the national housing register for project 13646-1, which match the Persiaran Sungai Emas address the developer gives. Distances are straight-line from that point.

What the map does not tell you. The towers sit on a hillside, so a straight line understates the walk: getting to the beach road means going downhill and coming back up. The developer says the homes face north-west, which is the sunset side and also the afternoon-sun side, so visit a unit at 4 pm to feel the heat. Hospitals and large malls are all in town, with Island Hospital 8.9 km away in a straight line. And remember that a view over neighbouring land is only as permanent as the planning rules for that land.
  • SJK(C) Pai Chai582 mstraight-line
  • Ferringhi Walk864 mstraight-line
  • The International School of Penang (Uplands)1.0 kmstraight-line
  • Batu Ferringhi Beach1.1 kmstraight-line
  • Tenby Schools Penang, Tanjung Bungah3.6 kmstraight-line
  • Straits Quay6.8 kmstraight-line
  • Gurney Plaza7.4 kmstraight-line
  • Island Hospital8.9 kmstraight-line
  • KOMTAR, George Town10.7 kmstraight-line
The government record

On the government register it is project 13646-1 — 149 homes, completed

The housing developer’s licence is held by Plenitude Bayu Sdn. Bhd. (13646), which the developer’s page describes as wholly owned by Plenitude Berhad. The Marin is the only project filed under that company, and its developer’s licence was renewed on 3 September 2026 to run until 2 September 2029.

Project codeRegistered nameAdvertising permitPermit expiresUnitsBed / bathStatus
13646-1The Marin — flats / condominium, 21 storeys13646-1/08-2019/02571(P)14 Aug 2019149Not recorded (163 sqm)Completed · CCC 4 Oct 2018

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Read from teduh.kpkt.gov.my on 5 October 2026. Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=13646-1

149 on the register and 149 from the developer — but only 33 itemised

The register’s summary gives 149 flats / condominium units in a 21-storey development, the same total Plenitude publishes. Bedrooms and bathrooms are left blank on the record and the size is entered as 163 square metres. The unit-by-unit list, however, itemises just 33 homes, all marked as sold; the other 116 are not listed individually, so the register cannot tell you how many homes the developer still holds. I will ask for the current availability directly.

A permit band from 2018, and what it means for foreign buyers

The last advertising permit records a minimum of RM1,567,000 and a maximum of RM3,562,000. That is the band on the advertising permit, not the price of any unit, and it dates from a permit that ran from 15 August 2018 to 14 August 2019. The whole band is above Penang Island’s RM1,000,000 floor for non-citizens buying strata property, so the building is open to foreign buyers with state consent. For a resale, eligibility turns on the price in your own agreement, which must itself be at or above the floor.

No current advertising permit is listed

Four yearly permits appear on the record, the first from 15 August 2014 and the last expiring on 14 August 2019. No newer permit was listed on the day I read it. The developer’s licence itself is current to 2 September 2029. If you are buying a unit from the developer and not from an individual owner, ask to see the permit under which it is being sold; that is a routine request and I will make it for you.

Schedule H delivery and the completion certificate

Sales were made under Schedule H (strata) with a 36-month delivery period. The first agreement on the register is dated 24 December 2014, which set delivery for 24 December 2017, and no approved extension is recorded. The certificate of completion and compliance is dated 4 October 2018, later than that first delivery date. The vacant possession date is not filled in on the record. For today’s buyer this is history, but it explains the 2018 completion year you will see quoted.

Track record

About Plenitude Berhad

Plenitude Berhad calls itself a property developer whose mission is to make better lives. Its property site lists townships and estates in four places: Taman Desa Tebrau and Impian Hills in Johor; Bukit Bintang, Bintang Bayu and Bintang Ria in Sungai Petani, Kedah; Diamond in Puchong; and, in Penang, The Marin at Ferringhi.

The Marin is its boutique high-rise. The name, the developer explains, comes from the French word for a southern coastal breeze, and the pitch is resort living on the Batu Ferringhi coast with the sea in front and the forested hill behind. StarProperty’s report of 7 July 2015 described two 21-storey towers on a ridge above Batu Ferringhi and noted that the project had been named Best Boutique Development (Hi-Rise) at the Property Insight Prestigious Developer Awards 2015.

Eight years after completion Plenitude still presents the project actively: it keeps The Marin Experience Gallery at G3, Gurney Walk on Gurney Drive, open daily from 10 am to 10 pm, publishes virtual tours of two Type B show units and describes the homes as ready to move in. That gallery is 8.7 km from the towers in a straight line, so arrange a visit to the actual site as well.

The honest caveat: the completion certificate came after the delivery date set by the first agreement, and the register shows no advertising permit since August 2019. For a buyer in 2026 the practical checks are different ones — the strata title position, the state of the management body’s accounts, the sinking fund and the condition of a building that has faced sea air since 2018. Those answers come from documents, not brochures, and I will request them.

Straight answers

Frequently asked questions

How many units are there at The Marin, Batu Ferringhi?

149 homes in two towers. Plenitude’s project page and the government register both give 149, and the register records 21 storeys.

There are four homes on a floor in each tower, and the developer points out that this makes every home a corner unit.

Is The Marin freehold?

Yes, according to the developer. Plenitude’s project page and brochure describe the site as over four acres of prime freehold land.

No advertisement is filed on the register for this older project, so the tenure cannot be cross-checked there. A title search by your solicitor confirms it, along with whether the individual strata title for the unit has been issued.

What are the layouts and sizes at The Marin?

Two. Type A is 1,850 sq ft (171 sqm) with 3+1 bedrooms and four bathrooms. Type B is 1,750 sq ft (162 sqm) with 3+1 bedrooms and three bathrooms. Both drawings show a foyer, a yard, a utility room and a balcony.

On the developer’s floor plate the two Type A homes are on the sea-view side of each tower and the two Type B homes on the forest-view side. Both drawings are published on this page.

Can foreigners buy a unit at The Marin?

Yes, with state consent. The permit band of RM1,567,000 to RM3,562,000 is entirely above Penang Island’s RM1,000,000 minimum for a non-citizen buying strata property.

A foreign buyer pays a 3% state levy on approval (1.5% if the price is between RM1,000,000 and RM1,500,000) and the flat 8% stamp duty for non-citizens, and may not resell within three years. If you buy from an existing owner, the agreed price must itself meet the RM1,000,000 floor.

Is The Marin completed? Can I move in straight away?

It is completed. The register shows 100% progress and a certificate of completion and compliance dated 4 October 2018.

How soon you can move in depends on who is selling. A developer unit and a resale from an owner follow different paperwork and timelines; tell me which you are looking at and I will set out the steps and the time each one usually takes.

Should I choose Type A or Type B, and which floor?

Type A is the larger home with the extra bathroom and sits on the side the developer labels sea view. Type B is 100 sq ft smaller and sits on the forest-view side, which looks towards the hill. Decide first whether you want the sea and the afternoon sun, or the green and the shade.

Then go and stand in the actual unit. In a hillside building the view changes a great deal between low and high floors, and what the neighbouring towers block varies from stack to stack. Because this is a completed building, there is no need to guess from a model.

What is the price of The Marin, and how much are the maintenance fees?

The only public price information is the government permit band: RM1,567,000 to RM3,562,000. That is the band on the advertising permit, not the price of any unit, and it comes from a permit that expired in 2019. I do not repeat asking prices from property portals.

The maintenance charge and sinking fund are set by the building’s management body and are not published by the developer. Message me and I will get the current charges in writing, together with what is actually available.

How does The Marin compare with The Lume on Andaman Island?

Both are low-density, large-format sea-facing condominiums, but one exists and one is being built. The Marin was completed in 2018: 149 homes of 1,750 and 1,850 sq ft, four on a floor, on a Batu Ferringhi hillside. The Lume is 261 homes of 1,722 to 2,874 sq ft, six on a floor, with delivery due by January 2029 on the register.

Choose The Marin if you want to move in now and prefer a beach-town setting; the two addresses are 7.7 km apart in a straight line. Choose The Lume if you want a new building closer to Gurney Drive, need four or five bedrooms, and can wait.

What is it like to live in Batu Ferringhi, and do units rent out?

It is a resort strip more than a suburb. Ferringhi Walk is 864 m away in a straight line and the beach about 1.1 km; schools are close, with SJK(C) Pai Chai at 582 m and Uplands at 1.0 km. For hospitals, supermarkets of any size and offices you drive to Tanjung Bungah, Tanjung Tokong or George Town.

Tenants here are mostly expatriate families tied to the international schools and people who choose the beach over the city. It is a small, steady pool, not a deep one, and I do not quote rental figures. Short-stay letting is a matter for the building’s house rules and local council regulations, so check both before buying with holiday lets in mind.

Ask which units are available now

Completed projects change hands unit by unit, and whatever the developer still holds moves too. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit.

Completed project — what is for sale changes unit by unit, so ask before you plan a viewing

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文

I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-05 · Last verified 2026-10-05 against Plenitude’s project page and brochure for The Marin at Ferringhi, the KPKT housing register, and a StarProperty report of 7 July 2015. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

The Marin @ Batu Ferringhi, PenangFreehold · completed · 1,750 / 1,850 sq ft
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: Plenitude Berhad (3 developments on this site)

Where it is: Batu Ferringhi, Penang

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

13646-1 · THE MARIN

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Pangsa/Kondo – 149 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
21 storeys
Siap Dengan CCC
—163 m²
≈ 1,755 sq ft
149RM1,567,000.00
– RM3,562,000.00
100.00%

Swipe the table sideways for the rest of the columns.

Read from teduh.kpkt.gov.my on 2026-10-08, project code 13646-1. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.