Taman Jasa Intan Garden Superlink @ Bukit Mertajam, Penang
282 freehold two-storey terrace houses in four phases, every one of them built and certified. Phase 4 — 78 homes of about 1,900 to 2,230 sq ft with four bedrooms — was certified complete on 22 January 2025, and a limited number of brand-new Phase 4 homes are still available, ready to move in.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation



Taman Jasa Intan Garden Superlink @ Bukit Mertajam, Penang at a glance
The key facts in one place, from the developer’s own published material: freehold land, 282 completed four-bedroom terrace houses in four phases and brand-new Phase 4 homes ready to move in. WhatsApp me for the latest price list.
- Development
- Taman Jasa Intan · Garden SuperlinkMarketed by Wing Tai as Garden Superlink, Jesselton Hills · developed by DNP Land Sdn. Bhd.
- Where it is
- Alma, Bukit MertajamMukim 15, Seberang Perai Tengah, mainland Penang · 1.9 km from AEON Mall Bukit Mertajam
- Tenure
- Freehold‘Hakmilik kekal’ on the developer’s advertisement, with no encumbrance on the land
- House type
- Two-storey terraceLots 22 to 26 ft wide · landed homes sold under the Schedule G agreement
- Units
- 282 in four phasesPhase 1: 70 · Phase 2: 75 · Phase 3: 59 · Phase 4: 78
- Phase 4 houses
- About 1,900 to 2,230 sq ftFour bedrooms, three bathrooms · lots of 23 × 71 ft, 22 × 79 ft and 26 × 79 ft
- Available now
- Brand-new Phase 4 homesType A and Type C, ready to move in · WhatsApp me for the current list
- Completion
- All four phases completedCertificates dated Dec 2022, Jul 2023, Aug 2024 and 22 Jan 2025
- Foreign buyers
- Selected housesHouses priced at RM1,000,000 and above can be bought by foreigners with state consent · WhatsApp me for eligible units
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Six reasons Bukit Mertajam families shortlist Garden Superlink
Freehold land, finished houses on wide lots and a well-established Wing Tai township — here is what stands out.
Freehold, with no charge on the land
Each of the four phase advertisements states ‘hakmilik kekal’ — freehold — and records no encumbrance on the land. For a landed home you may hold for decades or pass to your children, that is the simplest title position there is. Your solicitor’s search at signing confirms it.
Every house is already standing
All four phases carry a certificate of completion and compliance: December 2022, July 2023, August 2024 and, for Phase 4, 22 January 2025. You are judging real houses on real streets — road widths, afternoon sun, how the neighbours have renovated — instead of a show unit and a promise.
Wider lots than a 20-ft terrace, and four bedrooms
The lots run from 22 to 26 ft wide. In Phase 4 the built-up areas are about 1,900, 2,025 and 2,230 sq ft, with four bedrooms and three bathrooms in every house. That is room for a three-generation household without moving up to a semi-detached budget.
Alma’s shops are a short drive, by the numbers
AEON Mall Bukit Mertajam is 1.9 km away in a straight line and Lotus’s Bukit Mertajam 2.2 km. Simpang Ampat KTM station is 4.1 km and the Juru toll plaza on the North-South Expressway 6.5 km, which is what matters if someone in the family works in Batu Kawan, 11.7 km away, or on the island.
Delivered on time, phase after phase
Three of the four phases were certified ahead of their contract deadlines — Phase 4 more than three months inside its 24-month period. It is the latest work of a group that has completed 25 projects in Penang since 1993.
Brand-new homes, ready now
Phase 4’s Type B is fully taken up, and brand-new Type A homes (with more floor area than Type B) and the large Type C homes on 26-ft-wide lots remain. Nobody has lived in them, and there is no construction wait. WhatsApp me for the site plan and current list.
The whole development, decoded
The numbers that matter, from the developer’s own material.
Pick your phase
Phase 4
Phase 4, the final Garden Superlink phase: 78 two-storey terrace houses on Lots 30135 to 30242 in three types. The first sale and purchase agreement is dated 8 May 2023 and the certificate of completion and compliance 22 January 2025 — more than three months inside the 24-month period. 65 homes have already been taken up, including all 41 Type B homes; brand-new Type A and Type C homes remain available.
Phase 3
Phase 3, 188 m west of Phase 4: 59 two-storey terrace houses on Lots 30121 to 30257, each with four bedrooms and three bathrooms. The first agreement is dated 18 October 2022 and the completion certificate 28 August 2024. Every one of the 59 homes has been taken up — a sign of strong demand — so ask me about resales from present owners.
Phase 2
Phase 2, on Lots 30277 to 30388: 75 two-storey terrace houses in four types, with lots 22, 23, 25 and 26 ft wide, all 79 ft deep. The 46 Type A homes have three or four bedrooms and the rest four. The first agreement is dated 11 August 2021 and the completion certificate 18 July 2023, inside the 24-month period. 74 of the 75 homes have been taken up.
Phase 1
Phase 1: 70 two-storey terrace houses with four bedrooms and three bathrooms, on lots 22, 23 and 24 ft wide and 79 ft deep. The first agreement is dated 10 August 2020, and the completion certificate 6 December 2022 — the first Garden Superlink street to be handed over.
Where the project is now
All 11 Taman Jasa Intan Garden Superlink @ Bukit Mertajam, Penang floor plans
Phase 4 has three house types; the drawings below show the ground and first floors of each, from the developer’s advertisement. The cards after them cover Phases 1 to 3, with drawings and built-up figures from the developer’s advertisements for those phases; Phases 1 and 2 share their Type A and Type B drawings, and Phase 2’s Type C and Type D each have their own.

Phase 4 · Type A — 2,025 sq ft
Get this floor plan
Phase 4 · Type B — 1,900 sq ft
Get this floor plan
Phase 4 · Type C — 2,230 sq ft
Get this floor plan
Phase 3 · Type A — 1,974 sq ft
Get this floor plan
Phase 3 · Type B — 1,975 sq ft
Get this floor plan
Phase 3 · Type C — 2,071 sq ft
Get this floor plan
Phases 1 and 2 · Type A — 1,962 sq ft
Get this floor plan
Phases 1 and 2 · Type B — 2,047 sq ft
Get this floor plan
Phase 1 · Type C — 2,119 sq ft
Get this floor plan
Phase 2 · Type C — 2,020 sq ft
Get this floor plan
Phase 2 · Type D — 2,103 sq ft
Get this floor planPhase 4 on the developer’s site plan


Where Taman Jasa Intan Garden Superlink @ Bukit Mertajam, Penang sits
Taman Jasa Intan sits in Alma, on the south-east side of Bukit Mertajam, inside what Wing Tai calls its 120-acre Jesselton Hills township — 1.9 km in a straight line from AEON Mall Bukit Mertajam and 6.5 km from the Juru toll plaza.
Pinned to Phase 4. Phases 1 to 3 lie between 188 m and 272 m from that point. Distances are straight-line from the pin.
- AEON Mall Bukit Mertajam1.9 kmstraight-line
- Lotus’s Bukit Mertajam2.2 kmstraight-line
- Simpang Ampat KTM station4.1 kmstraight-line
- SJK(C) Kim Sen5.1 kmstraight-line
- Bukit Mertajam Hospital5.5 kmstraight-line
- Jit Sin Independent High School5.9 kmstraight-line
- Juru toll plaza, North-South Expressway6.5 kmstraight-line
- Batu Kawan Industrial Park11.7 kmstraight-line
- Penang Bridge16.9 kmstraight-line
Why buy Taman Jasa Intan Garden Superlink? Key benefits for investors and homeowners
Taman Jasa Intan Garden Superlink is a completed freehold scheme of 282 two-storey terrace houses by Wing Tai in its Jesselton Hills township at Alma, Bukit Mertajam, Penang, with four-bedroom homes of about 1,900 to 2,230 sq ft and brand-new Phase 4 units ready to move in. Here is what makes it stand out — whether you are buying to rent out or to live in.
A commute to Penang’s factory belt
The Juru toll plaza is 6.5 km away and Batu Kawan Industrial Park 11.7 km, with the Bukit Minyak and Juru factories nearby — a deep pool of families and senior staff looking for four-bedroom landed homes.
Freehold, with no charge on the land
Every phase’s advertisement states ‘hakmilik kekal’ — freehold — with no encumbrance on the land. A freehold landed home is the simplest title to hold or pass on.
Backed by a listed developer group
Wing Tai’s parent has been listed on the Singapore Exchange since 1989, and its Penang list runs to 25 completed projects since 1993. Three of the four Garden Superlink phases were certified ahead of their deadlines.
Completed and ready to move in
All four phases are certified, the last in January 2025. Brand-new Phase 4 homes are still available, so there is no construction wait — and you can judge real streets and real houses.
Wider lots and four bedrooms
Lots run from 22 to 26 ft wide, and Phase 4 houses are about 1,900, 2,025 and 2,230 sq ft, each with a ground-floor bedroom, three more upstairs, a family area and a balcony.
Shopping and services close by
AEON Mall Bukit Mertajam is 1.9 km away and Lotus’s 2.2 km, with Simpang Ampat KTM station 4.1 km and Bukit Mertajam Hospital 5.5 km. The township includes a landscaped park and playground.
About Wing Tai Asia
Garden Superlink is a Wing Tai project. The developing company, DNP Land Sdn. Bhd., has its business address at Galeri Impian on Jalan Rozhan in Bukit Mertajam, and its old web address now redirects to Wing Tai’s Malaysian property site. The parent, Wing Tai Holdings Limited, was established in Hong Kong in 1955, incorporated in Singapore in 1963 and has been listed on the Singapore Exchange since 1989, according to the group’s own profile.
On the mainland the company has been building for a long time. Its list of completed Penang projects has 25 entries, starting with 72 Scotland Park in George Town (1993) and the 695-unit Taman Nagasari in Prai (1997), and running through BM Utama, Taman Seri Impian and Menara Mahkota Impian in the Bukit Mertajam area.
Jesselton Hills in Alma, which the developer describes as a 120-acre township, is where the recent work has been: Taman Jasa Indah, the 198-unit Lakeside Superlink, Garden Villa Phases 1 and 2, and then the four Garden Superlink phases between 2022 and 2025. The developer’s current list for the township is its Garden Villas phases, which have their own pages on this site.
Three of the four Garden Superlink phases were certified ahead of their deadlines. The Phase 4 drawings and site plan on this page come from the developer’s advertisement; for anything else you need — the current list, charges or a viewing — WhatsApp me.
Frequently asked questions
How many houses are there in Taman Jasa Intan Garden Superlink?
282 two-storey terrace houses in four phases: 70 in Phase 1, 75 in Phase 2, 59 in Phase 3 and 78 in Phase 4.
An older 198-house scheme under the name Taman Jasa Intan was completed in 2015. That is an earlier product in the same township and is not part of Garden Superlink.
Is Garden Superlink freehold?
Yes. Each phase’s advertisement states ‘hakmilik kekal’, which is freehold, with no encumbrance on the land.
For a resale house in Phases 1 to 3, ask the seller for a current title search as well, because an owner may have charged the house to a bank since buying it. Your solicitor will do this as a matter of course.
What are the house sizes and layouts?
Phase 4 houses are about 1,900 to 2,230 sq ft with four bedrooms and three bathrooms. The advertisement lists three types: Type A on a 23 × 71 ft lot with about 2,025 sq ft built-up, Type B on 22 × 79 ft with about 1,900 sq ft, and Type C on 26 × 79 ft with about 2,230 sq ft.
Phases 1 to 3 use lots 22 to 26 ft wide, mostly 79 ft deep, with built-up areas of about 1,962 to 2,119 sq ft by type. The drawings on this page come from the developer’s advertisements for all four phases; for a house in Phases 1 to 3, tell me the lot number and I will match it to its type.
Can foreigners buy a house at Garden Superlink?
Yes, for houses priced at RM1,000,000 and above — Seberang Perai’s threshold for landed property — with state consent. What counts is the price in your agreement; WhatsApp me and I will check which available houses qualify.
A foreign purchase also needs state consent, carries a 3% state levy on approval, cannot be resold for three years, and since 1 January 2026 attracts a flat 8% stamp duty for non-citizens. Phase 4 has no Bumiputera-quota lots.
Is Garden Superlink completed and ready to move in?
Yes. All four phases have a certificate of completion and compliance: Phase 1 on 6 December 2022, Phase 2 on 18 July 2023, Phase 3 on 28 August 2024 and Phase 4 on 22 January 2025, with vacant possession recorded on the same dates.
So there is no construction wait. What you should allow time for is the loan, the legal work and — for a foreign buyer — state consent, which adds weeks rather than days.
Which phase and which type should I choose?
For a house that has never been lived in, choose Phase 4, where brand-new Type A and Type C homes are still available. Type A has the shortest lot, 71 ft, but more floor area than Type B. Type C is the widest and largest. Type B is fully taken up.
If the layout or position you want is gone, a resale in Phases 1 to 3 widens the choice — Phase 2 alone has four lot widths. Compare end lots and intermediate lots, which way the car porch faces, and how far the house is from the township entrance. I can list what is available in each phase.
What is the price of Garden Superlink, and are there monthly charges?
WhatsApp me for the developer’s current price list for the remaining Phase 4 houses.
I will also confirm any monthly charges and the security arrangements in writing for you.
How does Garden Superlink compare with Embun Hills in Machang Bubok?
Embun Hills, 2.7 km away in a straight line, is still being built: its developer gives August 2028 as the expected completion and promises a private clubhouse and central park, with terrace houses on 22 × 70 ft lots. Garden Superlink is finished, certified and lived in, on lots up to 26 ft wide and mostly 79 ft deep.
So the choice is between moving in this year on a longer lot, or waiting for a newer estate with shared facilities. If you need the keys before the next school year, that settles it.
Is Alma practical for daily life, and is there rental demand?
Yes — malls, the hospital and the expressway are all close. For daily life, AEON Mall Bukit Mertajam is 1.9 km away in a straight line, Lotus’s 2.2 km, Bukit Mertajam Hospital 5.5 km and Simpang Ampat KTM station 4.1 km. The Chinese schools I measured — SJK(C) Kim Sen at 5.1 km and Jit Sin Independent High School at 5.9 km — are in Bukit Mertajam town, so count on driving.
For renting out, a four-bedroom landed house here suits families and senior staff working in Batu Kawan Industrial Park, 11.7 km away, or the Bukit Minyak and Juru factories. WhatsApp me and I will check what comparable houses in the township are letting for.
Ask which units are available now
Completed projects change hands unit by unit, and whatever the developer still holds moves too. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit.
Completed project — what is for sale changes unit by unit, so ask before you plan a viewing
Louis Koh
11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文
I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.
Published 2026-10-05 · Last updated 2026-10-07 from Wing Tai’s Malaysian property website and the developer’s advertisements. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: Wing Tai Asia (3 developments on this site)
Where it is: Bukit Mertajam, Penang






