Skip to main content
🇲🇾 11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches
Damansara Jaya, Petaling Jaya · OCR Group

Stellar Damansara @ Damansara Jaya

Eighty-eight condominiums on 1.49 acres — 2,028 to 3,990 sq ft, two to four homes per floor, priced RM1,896,800 to RM3,364,800 on the published permit, about 300 metres from an LRT station that started running in June 2026.

Only 88 units99-year leasehold · MBPJ approved2,028–3,990 sq ft · 3 to 4+1 bedroomsPrivate lift lobby · 11-foot ceilingsExpected completion December 2026

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

88Homes in total
2Homes per floor in Block A
300mTo LRT3 Kayu Ara, per the developer
Overall eye-level view of both blocks by day at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Overall eye-level view of both blocks by day
Aerial view by day at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Aerial view by day
Aerial view at night at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Aerial view at night
Answer block

Stellar Damansara @ Damansara Jaya at a glance

This table is longer than most on this site, and that is entirely to the developer's credit. Rows three, four, five and eight exist because OCR publishes a complete statutory notice block on its project website — the developer's licence number, the advertising and sale permit number, both sets of validity dates, the approving local authority, the building plan reference, the tenure, the land charge, the expected completion date and the price range by block. Most Malaysian project websites publish none of that. Read the last row against the price row: Selangor's minimum purchase price for a non-citizen in Zone 1 is RM2,000,000, every unit in Block A is priced above it, and most of Block B is priced below it. That line runs through the middle of this development, and it is the reason the foreign-buyer question here has a genuinely useful answer rather than a flat no.

Development
Kondominium Stellar DamansaraThe scheme name printed on the permit
Licensed developer
OCR Land Development Sdn Bhd1274584-H, of OCR Group Berhad (7071)
Developer licence
30147/08-2027/0146(A)Valid 18 Aug 2022 to 17 Aug 2027
Advertising and sale permit
30147-1/01-2027/0974(R)-(S)Valid 4 Jan 2023 to 3 Jan 2027
Approving authority
Majlis Bandaraya Petaling JayaPlan reference MBPJ/120100/T/P10/0321/2015
Property type
Condominium, residentialClassified Kondominium on the permit, not a serviced residence
Tenure
Leasehold, 99 yearsBalance of term not published — see the FAQ
Land encumbrance
Charged to United Overseas Bank (Malaysia) BerhadStated on the permit; normal development finance
Total units
88Block A 40 units, Block B 48 units
Blocks and height
Block A 22 storeys, Block B 14 storeysLinked by a bridge at level 13A
Land area
1.49 acresBetween SMK Damansara Jaya and Sungai Kayu Ara
Built-up range
2,028 – 3,990 sq ftSeven layouts across two blocks
Price on the permit
RM1,896,800 – RM3,364,800Block A RM2,320,800–RM3,364,800; Block B RM1,896,800–RM2,037,800
Foreign buyers
Partly — Block A yes, most of Block B noZone 1 floor is RM2,000,000; quota also applies
Why this address

Six things that decide whether Stellar Damansara suits you

This is the only project among the four Petaling Jaya pages I have written where a non-citizen has a real route in, and the reason is arithmetic rather than policy. Selangor's Zone 1 minimum for non-citizens is RM2,000,000. The advertising permit prices Block A from RM2,320,800 to RM3,364,800 and Block B from RM1,896,800 to RM2,037,800. So every unit in Block A clears the floor, most of Block B does not, and the very top of Block B sits just RM37,800 above it. The line drawn by state policy runs straight through this development, and knowing exactly where it falls is worth more to a foreign buyer than any feature on the specification sheet.

📋

A complete statutory notice block, published where it belongs

OCR publishes the full block in the footer of every page: developer licence 30147/08-2027/0146(A) valid to 17 August 2027, advertising and sale permit 30147-1/01-2027/0974(R)-(S) valid to 3 January 2027, approving authority Majlis Bandaraya Petaling Jaya, plan reference MBPJ/120100/T/P10/0321/2015, tenure 99-year leasehold, the land charged to United Overseas Bank (Malaysia) Berhad, expected completion December 2026, unit counts by block and price ranges by block. This is not a marketing decision; it is a legal requirement that a great many developers quietly ignore. Two items in it are worth extracting. The permit expiry of 3 January 2027 is the date after which the developer may not lawfully advertise or sell without renewal, so check it is current when you sign. And the UOB charge means your solicitor will need the bank's redemption statement and disclaimer for your parcel at transfer — entirely normal, but it belongs in your timeline.

🚉

The LRT3 promise became an operating station in June 2026

OCR has marketed roughly 300 metres of walking distance to the LRT3 Kayu Ara station since launch. On 29 June 2026, twenty LRT3 Shah Alam Line stations including Kayu Ara entered passenger service. That is the single biggest change to this project's value proposition since it was launched, and it happened after the pricing was set on the permit. A buyer today is looking at a completed station where a 2023 buyer was looking at a construction hoarding. Two caveats I would apply anyway. The 300-metre figure is the developer's claim and I have not measured it, so walk it yourself. And on a home priced above RM1.9 million, rail access is a convenience and a resale story rather than a daily necessity — households at this price point drive. Value it as an asset that widens your future buyer pool, not as your commute.

🏗

Column-and-beam, 11-foot ceilings, and handed over bare

Three specifications that only matter together. The structure is reinforced concrete column-and-beam rather than shear wall, which means most internal partitions are not load-bearing and can be removed. The ceilings are 11 feet, which is roughly a foot and a half above a standard Malaysian apartment and is what makes a large open plan feel proportioned rather than flat. And homes are delivered bare, so nothing has to be demolished before you begin. That combination is aimed squarely at a buyer who will appoint an interior designer and reconfigure the plan — which at these sizes and this price is most of them. The flip side is a real cost you should budget rather than discover: a bare 2,500 sq ft home needs a full fit-out, and at Klang Valley rates for a home of this standard that is a six-figure sum before furniture. Ask what exactly bare includes, particularly flooring, sanitary ware and the air-conditioning provision.

🔑

Two to four homes per floor, one lobby per twenty units

Block A stacks two homes on each of 22 floors. Block B stacks four on each of 14. Each lift lobby serves twenty units and opens into a private foyer rather than a shared corridor. In practice that means you do not walk past other people's front doors to reach your own, you have frontage on at least two sides for light and cross ventilation, and the number of households you share a lift with is small enough that you will know them. It is the specification that most distinguishes this from a typical high-rise, and it is also the specification you pay for — a low unit count spreads the cost of the lifts, the guardhouse and the landscaping across 88 households rather than 800. Ask for the maintenance rate in writing and multiply it by your own square footage before you decide the privacy is worth it. On this size of home it usually is, but do the arithmetic yourself.

🏫

A secondary school on one side and a river on the other

The site is a strip between SMK Damansara Jaya and the Sungai Kayu Ara, with a 20-metre river setback approved by the drainage department. Both neighbours are worth thinking about honestly. A secondary school immediately adjacent means traffic and noise concentrated into predictable windows in the morning and early afternoon, and it also means that side of the site will not be built out with something taller — an open outlook that is effectively protected by land use rather than by a promise. The river is the same trade in a different form: a setback that guarantees separation, alongside the drainage and mosquito considerations any riverside site carries. If you are viewing, go at school dismissal time. That is the worst hour this address has, and if it does not bother you then nothing else will.

⚖

The line at RM2 million runs through the middle of this project

Selangor's minimum purchase price for non-citizens in Zone 1 — which covers the Petaling district — is RM2,000,000, and the state restricts non-citizens to strata and landed-strata property. This is a strata condominium, so the property type qualifies. What decides eligibility here is purely the price of the specific unit. On the permit, Block A runs RM2,320,800 to RM3,364,800, so all forty units clear. Block B runs RM1,896,800 to RM2,037,800, so most of it does not, and only the top of that range does. There is also a quota limiting foreign purchases to a share of the non-Bumiputera units in a scheme, so clearing the price does not guarantee an allocation is available. And state authority consent is required for a foreign acquisition, applied for after the agreement is signed — which sits neatly alongside the restriction in interest already noted on the permit requiring state consent for transfer, lease or charge. Have a Malaysian conveyancing solicitor confirm the current land office circular before you commit.

Project DNA

The whole development, decoded

Eighty-eight homes on 1.49 acres sounds dense until you look at how they are stacked. Block A puts two units on a floor across 22 storeys. Block B puts four on a floor across 14. Each lift lobby serves only twenty units. There is no central corridor, so every home has frontage on at least two sides, which is where the dual-aspect views and the cross ventilation come from. Ceilings are 11 feet. The structure is reinforced concrete column-and-beam rather than shear wall, which is a deliberate choice: it means most internal walls are not structural and can be moved. Homes are handed over bare. Put those together and the product brief is clear — this is built for buyers who intend to design the interior themselves and hold the home for a long time, not for buyers who want to move in with a suitcase.

88Homes
2Blocks
1.49Acres
11ftCeiling height

Block A and Block B — and why the difference is not just size

The larger block

Block A — 22 storeys, two homes per floor

Forty homes over 22 storeys, two on a floor, including two duplex penthouses at level 22. Every unit is 4+1 bedrooms with 5+1 bathrooms, running 2,500 sq ft for the A1, 2,530 for the A2 and 3,990 for the A3 duplex penthouse. Two units on a floor with a private lift foyer is about as close as a high-rise gets to a semi-detached house in feel. The other thing that makes Block A distinct is the price: the permit records this block at RM2,320,800 to RM3,364,800, which means every single unit here clears Selangor's RM2,000,000 floor for non-citizens — the only block in this set of four Petaling Jaya projects of which that is true.

40Units
22Storeys
2Units per floor
A1 · 2,500 sq ft · 4+1 bed 5+1 bathA2 · 2,530 sq ft · 4+1 bed 5+1 bathA3 · 3,990 sq ft duplex penthouse, level 22Permit price RM2,320,800 – RM3,364,800
💬 Ask about Block A — 22 storeys, two homes per floor
The entry block

Block B — 14 storeys, four homes per floor

Forty-eight homes over 14 storeys, four on a floor, all 3+1 bedrooms with 3+1 bathrooms. The four layouts sit within 141 sq ft of each other — B1 at 2,028, B2 at 2,030, B3 at 2,168 and B4 at 2,169 — so the real difference between them is not size but balconies and position, with B3 and B4 on level 1 carrying three balconies each. Block B is where the foreign-buyer line falls. The permit prices it at RM1,896,800 to RM2,037,800, so most of this block sits below the RM2,000,000 threshold and only the top of the range clears it, by RM37,800. If you are a non-citizen and Block B is what you want, the specific unit number is the whole question.

48Units
14Storeys
4Units per floor
B1 · 2,028 sq ft · 3+1 bed 3+1 bathB2 · 2,030 sq ft · 3+1 bed 3+1 bathB3 · 2,168 sq ft · three balconies, level 1B4 · 2,169 sq ft · three balconies, level 1
💬 Ask about Block B — 14 storeys, four homes per floor

Two facility levels, and the river the developer does not own

Facilities sit on level 1, called Grove Lane, and level 13A, called Sky Lane, the latter spanning both blocks across the link bridge. There is also a 340-metre jogging track at ground level and a riverside walk along the Sungai Kayu Ara. One honest note on that walk: the riverbank land belongs to the local authority, not to the development. OCR is upgrading it, which is a genuine contribution to the neighbourhood, but it is not part of the common property you will own or control. Its published length has been given three different ways across the developer's own materials — 242, 280 and 288 metres — so the list below uses the most recent figure and flags it.

Sky Lane, level 13A

Spanning both blocks across the link bridge
  • Starlight Infinity Pool and Moon Deck
  • Jacuzzi Aqua Cove
  • Splashy Wading Cove
  • Crossfit Gym
  • Vista Skywalk and Observation Deck
  • Huddle Sky Lounge and Chill Out Patio
  • Savory Meadow Lawn
  • Skyline BBQ Corner
  • Playpark Sanctuary
  • Changing rooms and washrooms

Grove Lane, level 1

The arrival and gathering level
  • Garden Banquet Lounge
  • Pre-function area
  • Spiral staircase
  • Prayer room
  • Two lift lobbies serving Block A

Ground level and the riverside

Including land the development does not own
  • 340-metre jogging and circular track
  • Riverside walk along Sungai Kayu Ara, most recently published at 288 metres
  • The riverbank land belongs to the local authority, not to the development
  • Three-tier security: guardhouse, lift lobby, car park lift
  • Carpark on sub-basement 1 and 2 and ground level
  • Two to three car park bays per unit

Design specifications OCR documents

In the home rather than on a deck
  • Private lift lobby and foyer, each lobby serving only 20 units
  • 11-foot ceiling height
  • Dual frontage with no central corridor
  • Column-and-beam structure for reconfigurable interiors
  • En-suite bathroom to every bedroom
  • Elderly-friendly details: wide doorways, toilet railings, shower seat
  • Pet-friendly, written into the house rules and the deed of mutual covenants
  • Targeting GreenRE Platinum certification

Where the project is now

18 Aug 2022Developer licence 30147/08-2027/0146(A) issued, valid to 17 August 2027
4 Jan 2023Advertising and sale permit issued, valid to 3 January 2027
29 Jun 2026LRT3 Shah Alam Line opens; Kayu Ara station enters passenger service
Jun 2026Latest official site progress photographs published; updated monthly
Dec 2026Expected completion date stated on the advertising and sale permit
Layouts

All 7 Stellar Damansara @ Damansara Jaya floor plans

There are seven layouts across two blocks: A1, A2 and the A3 duplex penthouse in Block A, and B1, B2, B3 and B4 in Block B. Every one of them has a maid's room and an en-suite bathroom on every bedroom. The spread from the 2,028 sq ft B1 to the 3,990 sq ft A3 penthouse is nearly two thousand square feet, which is more than the entire size of most new Klang Valley apartments. One caution before you quote a specification: the balcony dimension appears three different ways on the developer's own site — as 27 by 5 feet on one page, 25 by 7 on another, and 27 by 7 in an image filename. I have left the balcony size off this page entirely rather than pick one.

Type A1 floor plan, 2,500 sq ft four-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

A1 — 2,500 sq ft, 4+1 bedrooms, 5+1 bathrooms

232 sqm · Block A · one balcony

🛏 4+1 Bed🛁 5+1 BathClears RM2m floor
Get this floor plan
Type A2 floor plan, 2,530 sq ft four-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

A2 — 2,530 sq ft, 4+1 bedrooms, 5+1 bathrooms, two balconies

235 sqm · Block A · two balconies

🛏 4+1 Bed🛁 5+1 BathTwo balconies
Get this floor plan
Type A3 penthouse floor plan, lower floor at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

A3 — 3,990 sq ft duplex penthouse, level 22

371 sqm · duplex · three balconies · two units only · the upper floor plan is in the gallery below

🛏 4+1 Bed🛁 5+1 BathOnly two exist
Get this floor plan
Type B1 floor plan, 2,028 sq ft three-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

B1 — 2,028 sq ft, 3+1 bedrooms, 3+1 bathrooms

188 sqm · Block B · one balcony

🛏 3+1 Bed🛁 3+1 BathBelow RM2m floor
Get this floor plan
Type B2 floor plan, 2,030 sq ft three-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

B2 — 2,030 sq ft, 3+1 bedrooms, 3+1 bathrooms

189 sqm · Block B · one balcony

🛏 3+1 Bed🛁 3+1 BathOrientation is the difference
Get this floor plan
Type B3 floor plan, 2,168 sq ft three-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

B3 — 2,168 sq ft, three balconies, level 1

201 sqm · Block B · level 1 · three balconies

🛏 3+1 Bed🛁 3+1 BathThree balconies
Get this floor plan
Type B4 floor plan, 2,169 sq ft three-plus-one bedroom at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor

B4 — 2,169 sq ft, three balconies, level 1

201 sqm · Block B · largest in the block

🛏 3+1 Bed🛁 3+1 BathTop of the Block B range
Get this floor plan
Location & connectivity

Where Stellar Damansara @ Damansara Jaya sits

Stellar Damansara occupies a strip of land at Jalan SS 22A/1 in Damansara Jaya, 47400 Petaling Jaya, Selangor, between SMK Damansara Jaya and the Sungai Kayu Ara. The coordinate on this map is resolved from the Google Maps link OCR publishes on its own project page, not from a third party. The approving local authority is stated on the project's advertising permit as Majlis Bandaraya Petaling Jaya, with building plan reference MBPJ/120100/T/P10/0321/2015 — so there is no ambiguity about jurisdiction here, which puts the project squarely in the Petaling district and therefore in Zone 1 of Selangor's framework for foreign purchasers.

Open in Google Maps →
📍 3.1317521, 101.61545147400 Petaling Jaya

The vehicle entrance and exit connect directly onto the Sprint Expressway, so satellite navigation may route you along the highway rather than through Damansara Jaya's internal roads. The current sales gallery is not on site — it is at A-G-01, Block Allamanda, 10 Boulevard, which is the developer's own office building. Also note that only stellardamansara.com and ocrbhd.com are the developer's sites; there is at least one third-party microsite using a similar name.

The single biggest change since this project launched is that the train now runs. Twenty LRT3 Shah Alam Line stations, including Kayu Ara, entered passenger service on 29 June 2026. OCR has claimed roughly 300 metres of walking distance to that station since launch, back when it was a construction site and a promise. It is now an operating station with a timetable. That converts the strongest line in the marketing from a forecast into a fact you can go and test yourself, and I would test it — walk it once, at the time of day you would actually use it.
💬 Ask me about the real drive times
  • LRT3 Kayu Ara station, Shah Alam lineabout 300 m walkingdeveloper's claim; the station opened 29 June 2026
  • Sprint Expresswaydirect entrance and exitthe site connects straight onto the highway
  • SMK Damansara Jayaimmediately adjacentthe site boundary abuts the school
  • LDP, NKVE and Penchala Linkthree more highways, no interchange distance givennamed by the developer and by The Edge
  • 1 Utama, The Starling, Atria, 3 Damansara, The Curve, IKEAwithin a 5 km radiusthe developer gives a radius, not per-mall distances
  • KPJ Damansara, Thomson Kota Damansara, Ara Damansara Medical Centrenamed, not measuredthe brochure map uses concentric rings without figures
The government record

88 units, 93% built, and the licensed developer is OCR Land Development

Project codeRegistered nameLicensed developerAdvertising permitPermit expiresUnitsBed / bathPrice band on the permitBuiltStatus
30147-1Kondominium Stellar DamansaraOCR Land Development Sdn Bhd (30147)30147-1/01-2027/0974(R)-(S)3 Jan 2027883–4 / 3–548 units RM1,896,800 – RM2,037,800
40 units RM2,320,800 – RM3,364,800
92.8–93.3%Lancar

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Read from teduh.kpkt.gov.my on 27 August 2026. Pull it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=30147-1

93% built: the risk has moved

On a building this close to completion, delivery risk is largely behind you and the questions that matter are the handover ones. Ask now, in writing: the expected date of vacant possession, the defect liability period and how defects are reported, the strata title timeline, and the first year’s maintenance charge and sinking fund per square foot.

Note also that the permit expires on 3 January 2027. On a nearly finished building that is normal — but if units are still being sold after that date, ask to see the renewal.

88 units is unusually small, and that cuts both ways

A small scheme means very few internal competitors when you resell — but it also means the development will not generate its own price history quickly, and your comparables will come from neighbouring condominiums rather than from your own block. Ask the agent for the last three transacted prices in the scheme, and if there are none, that is the answer.

Foreign buyers

The register splits this permit into 48 units at RM1,896,800 – RM2,037,800 and 40 units at RM2,320,800 – RM3,364,800. Selangor’s minimum for a non-citizen buyer is RM2,000,000 for most property types. So all 40 units in the upper lot clear the threshold, while the 48-unit lot straddles it — most of that lot sits below RM2,000,000 — a unit-level question, not a scheme-level one. Confirm in writing for the specific unit before paying anything.

Track record

About OCR Land Development Sdn Bhd, OCR Group Berhad

The licensed developer is OCR Land Development Sdn. Bhd. (1274584-H), and unusually I do not have to hedge that sentence. It is printed in the statutory notice block in the footer of every page of the project website, alongside the developer's licence number 30147/08-2027/0146(A) valid from 18 August 2022 to 17 August 2027, and the advertising and sale permit 30147-1/01-2027/0974(R)-(S) valid from 4 January 2023 to 3 January 2027. The listed parent is OCR Group Berhad, registration number 199701025005 (440503-K), on the Main Market of Bursa Malaysia under stock code 7071, formerly O&C Resources.

That notice block is worth dwelling on, because most project websites in this country do not carry one at all. It also discloses the approving authority as Majlis Bandaraya Petaling Jaya, the building plan reference, a 99-year leasehold tenure, a restriction in interest requiring state authority consent for transfer, lease or charge, an expected completion date of December 2026, a land charge in favour of United Overseas Bank (Malaysia) Berhad, the unit split of 40 in Block A and 48 in Block B, and the price ranges for each block. On most of the pages I write, half of those items are blank because nobody published them. Here they are all in one paragraph in the footer, where they legally belong.

The group's record is mixed and I would rather set it out than summarise it. Completed work includes PJ5 SOHO, Residence 8 in Kuala Lumpur, Palm Reserve, Beverly Residence, Casa Utama townhouses, Westwood Terrace, Flexus Signature Suites, The Pano, YOLO Signature Suites, The Mate in this same neighbourhood, and PRIYA in Kuantan. Against that, the group has publicly acknowledged a delay: Isola KLCC, launched in 2018, took an extension of time and moved its completion to the first quarter of 2024, which OCR's general manager for corporate development attributed to the pandemic in an interview with The Edge. There is also a Bursa announcement from April 2023 recording material litigation involving OCR subsidiaries, and a separate arbitration commenced by a partly owned subsidiary against a contractor. I have not read the filings themselves, so I am flagging their existence rather than characterising their merits.

How to weigh that. An extension of time granted during 2020 and 2021 is close to universal in Malaysian development and says little about a developer on its own. Litigation with contractors is ordinary industry friction rather than a distress signal. What actually reassures me here is more specific and more checkable: the permit is current, the site photographs are published monthly and were updated through June 2026, the land is charged to a bank that has therefore underwritten the project, and the expected completion date on the permit is December 2026 — close enough that the gap between promise and delivery is about to become visible rather than theoretical.

One correction worth making. OCR published a notice in July 2026 stating that OCR Capital Sdn Bhd is not affiliated with OCR Group Berhad. If you encounter that name in connection with anything, it is a different company.

Construction progress, June 2026, first view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, first view
Construction progress, June 2026, second view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, second view
Construction progress, June 2026, third view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, third view
Construction progress, June 2026, fourth view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, fourth view
Construction progress, June 2026, fifth view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, fifth view
Construction progress, June 2026, sixth view at Stellar Damansara by OCR Group, Damansara Jaya, Petaling Jaya, Selangor
Construction progress, June 2026, sixth view
Straight answers

Frequently asked questions

Can a foreigner or a Singaporean buy at Stellar Damansara?

Yes for part of the development, and this is the rare Selangor project where the answer is worth working through unit by unit rather than dismissing in a sentence.

The rules first. Selangor sets a minimum purchase price for non-citizens by zone. Petaling Jaya is in the Petaling district, which sits in Zone 1, where the residential minimum is RM2,000,000. Zone 3, covering Hulu Selangor and Sabak Bernam, is the RM1,000,000 zone and is irrelevant here. Separately, the state permits non-citizens to acquire strata and landed-strata property only — a landed home on an individual title is closed at any price. Stellar Damansara is a strata condominium, so it passes that test.

Now the arithmetic, using the prices printed on the advertising and sale permit. Block A is RM2,320,800 to RM3,364,800, so all forty units clear the RM2,000,000 floor comfortably. Block B is RM1,896,800 to RM2,037,800, so most of that block sits below the threshold and only units priced above RM2,000,000 qualify — the top of the range clears it by RM37,800.

Two further conditions that clearing the price does not remove. There is a quota limiting foreign purchases to a share of the non-Bumiputera units in a scheme, so an eligible unit still needs an available foreign allocation. And a foreign acquisition in Selangor requires the state authority's written consent, applied for after the sale and purchase agreement is signed. Note that the permit already discloses a restriction in interest on the land requiring state consent for transfer, lease or charge, so consent is a live process here in any event.

One definitional point people miss: in Malaysian land law, foreign interest includes Malaysian permanent residents. Holding PR does not put you on the citizen side of this line.

Practical sequence: pick the specific unit, get its contract price in writing, confirm a foreign allocation is available, then have a Malaysian conveyancing solicitor verify the current Selangor land office circular before you pay anything. These are state guidelines and they get revised.

If I am a non-citizen, what will the 8% stamp duty actually cost me here?

Enough that you should budget it as a separate cash line rather than discover it at signing.

From 1 January 2026 a flat 8% transfer stamp duty applies to non-citizens acquiring residential property in Malaysia. Stellar Damansara is residential — the permit classifies it as Kondominium — so this applies squarely.

Take the cheapest Block A unit at RM2,320,800. At 8% the duty is RM185,664. A Malaysian buyer of the same unit pays on the ordinary graduated scale, which on that price works out to roughly RM76,832. The difference is around RM108,800 on a single transaction, and it does not buy you anything different.

At the top of the range, the RM3,364,800 penthouse, the 8% duty is RM269,184.

Two things about this cost that matter operationally. It is payable on the instrument, so it is a cash item and not something you finance in the ordinary way alongside the purchase price. And it sits on top of everything else a foreign buyer carries here: legal fees, the state consent application, and on exit real property gains tax at 30% within five years and 10% from the sixth year onwards, with no zero band for a non-citizen no matter how long you hold.

What does not apply: Johor operates a separate state levy on foreign purchasers with its own rate and minimum sum. That is a Johor instrument. It has no application to a property in Selangor, and you should disregard any advice that imports it.

Rates change with each federal budget. Have your solicitor compute the current figure on your actual contract price before you commit.

Is the lease 99 years or 56 years? I have seen both.

Both figures exist and they are probably describing the same lease from two ends. The permit is the document that governs, and it says 99 years.

The statutory notice block on the project website states the tenure as pajakan selama 99 tahun — a lease of 99 years. That is the developer's formal disclosure and it is the strongest source available.

The Edge, reporting on the project in February 2023, wrote that the leasehold development has a tenure of 56 years. The most likely reconciliation is that the master title is a 99-year lease with roughly 56 years still to run at that point, which would put expiry somewhere around 2079. I could not verify an expiry year from any primary source, so I am not printing one.

This is the number that matters more than any specification on this page, and here is why. Bank financing on leasehold property is generally structured so the loan tenure ends a set number of years before the lease does. A lease with fifty-something years left constrains both the tenure a bank will offer and, more importantly, the tenure the bank will offer your buyer in fifteen years when you want to sell. Leasehold assets do not decline smoothly; they decline in steps as they cross financing thresholds.

The fix is cheap and definitive. Order a land search on the master title. It gives you the grant date and the expiry date in one line, and any conveyancing solicitor can obtain it in a day for a modest fee.

There is also an extension route — a lease can be topped up by application to the state authority on payment of a premium — but the cost and the outcome are entirely at the state's discretion and should not be assumed in your numbers.

The permit says December 2026. Is that realistic, and what happens if it slips?

December 2026 is the expected completion date printed on the advertising and sale permit, and it is the current one — earlier public statements have moved.

The history is worth knowing because it shows the direction of travel. The Edge reported a first quarter 2026 target in February 2023. An OCR press release in September 2023 said 2026. Some later coverage referenced the second quarter of 2026. The permit now says December 2026. Each revision moved later, which is the ordinary pattern and not a scandal, but it is a pattern.

What supports the current date: OCR publishes site progress photographs monthly and the latest set, uploaded in July 2026, covers June 2026. Construction is visibly well advanced. No percentage of completion has been published, and I would not accept a verbal one.

What happens if it slips is the part worth reading the contract for. This project is sold under a housing developer licence, which means the sale and purchase agreement follows the prescribed statutory form and carries liquidated damages for late delivery at the statutory rate, calculated from the date in your own agreement — not from the date on the permit, and not from the date in any brochure. Those two dates are usually the same but you should check yours rather than assume.

Practical instruction: ask for the executed agreement date and the delivery date written into your specific contract, and ask what the current expected handover month is in writing. Then ask to visit the actual floor. On a project this close to completion, a site visit tells you more than any projection.

What is the maintenance fee on a 2,500 sq ft home here?

The only figure that exists is a developer statement from 2023, and I want you to see how I am treating it before you use it.

OCR's general manager for corporate development told The Edge in February 2023 that the maintenance fee would be 35 sen per square foot per month including sinking fund for the first year. That is a developer speaking on the record, which is a good source. It is also three and a half years old and describes only the first year.

If that rate held, a 2,028 sq ft B1 would run about RM710 a month and a 2,500 sq ft A1 about RM875. A 3,990 sq ft penthouse would be about RM1,397.

Why the number is likely to be under pressure over time, and this is the honest structural point. Eighty-eight households are carrying a two-block development with a level 13A sky facilities deck across a link bridge, an infinity pool, a jacuzzi, a gym, three-tier security across a guardhouse and two basement car park levels, plus landscaping and a jogging track. Those are condominium-scale costs divided by a boutique-scale denominator. There is no retail podium subsidising anything. A low unit count buys you privacy and it costs you economy of scale, and the two are the same fact.

So do not plan on 35 sen holding for a decade. Ask for the first-year schedule in writing, ask what the sinking fund contribution rate is separately, and ask to see the developer's budget for the management corporation if one has been prepared. Message me and I will request all three.

Block A or Block B — which should I be looking at?

They are genuinely different products at the same address, and the choice is cleaner than it looks.

Block B is the value proposition. Four homes per floor over 14 storeys, 3+1 bedrooms with 3+1 bathrooms, 2,028 to 2,169 sq ft, priced RM1,896,800 to RM2,037,800. That is a two-thousand square foot home in mature Petaling Jaya at under a million per thousand square feet. For a Malaysian family that is the sensible unit in this development.

Block A is the privacy proposition. Two homes per floor over 22 storeys, 4+1 bedrooms with 5+1 bathrooms, 2,500 to 3,990 sq ft, priced RM2,320,800 to RM3,364,800. Half the neighbours per floor, an extra bedroom, two extra bathrooms, and eight more storeys of height and outlook.

The premium between them is roughly RM420,000 at the entry of each block, for about 470 more square feet, one more bedroom and two more bathrooms. Per square foot they are closer than the headline gap suggests, which tells you Block A is priced on the layout rather than on prestige.

For a non-citizen the question answers itself. All of Block A clears the RM2,000,000 threshold; most of Block B does not. If you hold a foreign passport or Malaysian PR, Block A is effectively the development.

One thing to check that applies to both: the four Block B layouts differ from each other by as little as two square feet, so within that block you are choosing orientation, not size. Ask for the floor plate with the compass on it.

OCR has had a delay and there is litigation on record. Should that change my decision?

It should change what you check, not necessarily what you decide. Let me set out what is on the record and then how I weigh it.

On record: Isola KLCC, launched in 2018, took an extension of time and completion moved to the first quarter of 2024. OCR's general manager for corporate development attributed the delay to the pandemic in an interview with The Edge. Separately, a Bursa announcement in April 2023 records material litigation involving OCR subsidiaries in the Shah Alam High Court, and a partly owned subsidiary commenced arbitration against a contractor. I have seen the announcement, not the filings, so I am recording their existence rather than assessing their merits.

How I weigh the delay: extensions of time granted across 2020 and 2021 are close to universal in Malaysian development, and a project launched in 2018 for delivery around 2022 was always going to run into it. Standing alone, it tells you very little about the developer.

How I weigh the litigation: disputes with contractors are ordinary industry friction. What would concern me is a pattern of claims from purchasers, which is not what these are.

What actually reassures me about this project specifically, and it is more useful than any general assessment of the group: the permit is current, the land is charged to United Overseas Bank which means a bank underwrote the development, monthly site photographs run through June 2026, and the expected completion of December 2026 is close enough that the gap between promise and delivery is about to be visible rather than theoretical.

So the practical response is not to walk away or to shrug. It is to visit the site, look at the structure yourself, ask for the current expected handover month in writing, and read the liquidated damages clause in your own agreement so you know precisely what a delay is worth to you.

Why do some listings call it a serviced residence when the permit says condominium?

Because listing databases populate their fields loosely, and here the developer's own permit settles it in one word.

The advertising and sale permit classifies the scheme as Kondominium, and it is sold under a housing developer's licence issued under the Housing Development (Control and Licensing) Act. That is the legal characterisation. Several property portals describe it as a serviced residence. The permit wins.

The distinction is not cosmetic. A serviced residence is typically built on a commercial title, which brings commercial electricity and water tariffs and a commercial assessment rate for as long as you own it. A residential-titled condominium is billed at domestic rates. Over a twenty-year hold on a 2,500 sq ft home, that difference compounds into a substantial number.

There is a second layer that matters at resale. A serviced residence and a condominium do not compete for the same buyer, and they do not carry the same financing treatment. Getting the category right is not pedantry; it is what your valuer and your buyer's bank will use.

One related caution about sources. Only stellardamansara.com and ocrbhd.com are developer-operated sites. There is at least one third-party microsite using a name close enough to be mistaken for official. If a page carries no statutory notice block, treat it as marketing rather than as a source.

The way to settle any of this permanently is the same as always: a land search on the master title, which states the category and the express conditions. Ask your solicitor to order one before you sign.

Is 300 metres to the LRT worth paying for on a home at this price?

Not for your commute. For your exit.

Be honest about the household first. A buyer of a 2,000 to 4,000 square foot home with two or three car park bays is not usually taking the train to work. At this price point, the family drives, and the highway access — a direct entrance and exit onto the Sprint Expressway, with the LDP, NKVE and Penchala Link nearby — is doing far more of the daily work than the station is.

Where the station earns its keep is on the other side of the transaction. Rail proximity widens the pool of people who can consider your home when you sell, and it does so permanently because a station does not move. It also matters to a tenant profile you might not have considered: adult children of the household, live-in help, and any occupant who does not have a car.

Two honest caveats. The 300-metre figure is OCR's claim, not my measurement, and 300 metres in a straight line is not 300 metres on foot if there is a wall, a river or a highway in between. Walk it before you value it. And the station only entered service on 29 June 2026, so nobody yet has data on how the corridor actually performs — headways, crowding, parking pressure on surrounding streets.

The version of this that is true without qualification: as at 2026, a completed operating station within walking distance of a Petaling Jaya address is a scarce thing, and scarcity that cannot be replicated by the next developer is the kind worth paying for. Just do not buy it as a commuting solution when what you are actually buying is resale liquidity.

Completion is December 2026, so the questions have changed

On a project whose permit says December 2026, you are no longer buying a promise — you are buying a nearly finished building. That changes what to ask for. Get the current availability list by unit number, get the balance of the 99-year lease from a title search, get the first-year maintenance schedule, and ask for a site visit to the actual floor rather than the show unit. I will request all four and send you what comes back.

No buyer-side agent fee on developer launches

Louis Koh

11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文

I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.

💬 Message Louis

Published 2026-08-11 · Last verified 2026-08-11 against OCR Land Development Sdn Bhd, OCR Group Berhad's published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Stellar Damansara @ Damansara Jaya99-year leasehold condominium · 2,028–3,990 sq ft · 88 units only · RM1,896,800–RM3,364,800 on the permit
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: OCR Group (1 development on this site)

Where it is: Petaling Jaya (PJ), Selangor

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

30147-1 · KONDOMINIUM STELLAR DAMANSARA

Overall status: Lancar — on schedule

Certified completion by componentRumah Pangsa/Kondo – 40 units93.31%Rumah Pangsa/Kondo – 48 units92.81%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
21 storeys
Lancar
3, 4 / 3, 5—40RM2,320,800.00
– RM3,364,800.00
93.31%
Rumah Pangsa/Kondo
12 storeys
Lancar
3 / 3, 4—48RM1,896,800.00
– RM2,037,800.00
92.81%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-17, project code 30147-1. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.