One 18-storey block of 148 freehold homes off Jalan Telaga Air, beside the same group’s WellSpring Residences — a single three-bedroom, two-bathroom layout, 19.83% built on the government register and expected in May 2028. The whole permit band sits above the mainland’s RM500,000 strata floor, so a foreign individual can apply for state consent to buy.

Freehold148 units · 1 block3 bed 2 bath · one layout19.83% built

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

148homes in one 18-storey block
11homes a floor, Levels 5 to 17
2.2 kmto Penang Sentral, straight-line
Silkspring Residence artist's impression of the 18-storey block at dusk, Butterworth, Penang
Silkspring Residence · artist’s impression from the developer’s website
Silkspring Residence location plan showing Residensi Ria Sutera beside WellSpring Residences, Butterworth, Penang
Location plan published by the developer — Silkspring and WellSpring side by side
Answer block

Silkspring Residence @ Butterworth, Penang at a glance

The figures below come from the developer’s own website and plans, the advertisement it filed with the government register, and the register itself. Figures marked ‘listed’ come from published listing information, not from a developer brochure; I will confirm them against the sale documents for you.

Development
Silkspring ResidenceAn Airmas Group project · registered as Residensi Ria Sutera · licence held by Eco Summit Sdn. Bhd.
Where it is
Off Jalan Telaga Air, ButterworthSeberang Perai Utara, mainland Penang · beside WellSpring Residences on the developer’s location plan
Tenure
FreeholdPrinted as ‘Pegangan Tanah: Kekal’ on the advertisement filed with the register
Building
1 block · 18 storeysHomes on 14 floors, from Level 4 (numbered 3A) up to Level 17, on the register’s unit list
Units
14811 homes a floor on 13 floors, plus 5 on the Level 4 facilities floor
Layout
Type A · 3 bed 2 bathOne layout for every home · 1,172 sq ft (listed) · the developer’s drawing prints 12,600 mm × 10,926 mm overall
Facilities
Ground floor and Level 4Swimming pool, wading pool, sauna, kindergarten, surau, playground, multipurpose halls and a landscaped garden
Completion
Expected May 2028The date on the filed advertisement · register shows 19.83% built, on track
Government permit
30941-1/09-2028/0796(A)-(S)Valid 30 Sep 2025 to 29 Sep 2028
Foreign buyers
Open to foreign individuals, with state consentThe whole permit band is above the mainland’s RM500,000 strata floor; a foreign company faces a RM1,000,000 floor
Why this address

Six things to weigh before you enquire about Silkspring Residence

Four are reasons a Butterworth family or a mainland investor would shortlist it; two are points to settle first. Each rests on the developer’s plans, the government register or my own measurement on the map, and the one figure I took from listings is marked as such.

🏠

One layout, and it is a full family home

Every one of the 148 homes is Type A: three bedrooms, two bathrooms, a yard, a utility room and a balcony off the living room, as drawn by the developer. There are no studios and no dual-key units in the block, so the people in the lift will be households much like yours, and comparing one home with another is simple: same plan, different floor and facing.

📜

Freehold, in the older part of Butterworth

The advertisement filed with the register prints the tenure as ‘Kekal’, which is freehold. The site is off Jalan Telaga Air, in the established streets of Butterworth rather than on newly opened land: the Butterworth Digital Library is 0.3 km away and Penang Sentral 2.2 km, both in a straight line from the pin.

🏫

A Chinese primary school 0.4 km away

SJK(C) Chung Hwa 1 on Jalan Telaga Air is 0.4 km from the pin in a straight line, and the developer marks the school on its own location plan. The ground-floor plan also draws a kindergarten inside the development, next to the swimming pool, so the youngest child’s first classroom can be downstairs.

📊

The register lets you check it before you visit

Project 30941-1 carries a permit valid to 29 September 2028, 148 units, a building 19.83% complete and marked on track on the latest return, and 43 homes recorded as sold on 5 October 2026. Few schemes at this stage give a buyer that much to verify independently before stepping into a sales gallery.

📏

The floor area is a listed figure, not a brochure figure

The developer’s website and its filed advertisement show the Type A plan without printing a built-up area. Listings give 1,172 sq ft, and the drawing itself prints overall dimensions of 12,600 mm by 10,926 mm. Figures marked ‘listed’ come from published listing information, not from a developer brochure; I will confirm them against the sale documents for you. The car park allocation is in the same position: the public material does not state it.

🛗

Two lifts, and no gymnasium on the plans

The typical floor plan draws two lifts, one of them the fire lift, serving eleven homes on each floor. The facilities list is a pool, a wading pool, saunas, a kindergarten, a surau and a playground on the ground floor, plus multipurpose halls and a garden on Level 4. A gymnasium is not on it. If either point matters to your household, raise it before you choose a floor.

Project DNA

The whole development, decoded

Figures marked ‘listed’ come from published listing information, not from a developer brochure; everything else is the developer’s own or the government register’s.

148Units
18Storeys
11Homes a floor, Levels 5–17
19.83%Built, per the register

Facilities, level by level

Taken from the two facilities plans on the developer’s project page; the same list appears on the advertisement it filed with the register.

Ground floor

Ground
  • Swimming pool
  • Wading pool
  • Open shower
  • Sauna (two rooms drawn)
  • Children’s playground
  • Kindergarten
  • Surau
  • Mailbox area
  • Guard house and drop-off
  • Management office
  • Visitor parking bays

Level 4

Level 4
  • Multipurpose hall (three halls drawn)
  • Landscaped garden

Where the project is now

30 Sep 2025Advertising permit issued · valid to 29 Sep 2028
20 Apr 2026Date of the first sale and purchase agreement as recorded on the register
Oct 2026Register shows 19.83% built and ‘on track’ (latest 7(f) return) · 43 of 148 homes recorded as sold
May 2028Expected completion stated on the developer’s filed advertisement
20 Apr 2029Latest delivery date under the first agreement — 36 months, Schedule H
Layouts

The one layout at Silkspring Residence, and the floor it sits on

One layout for the whole building, followed by the typical floor so you can see where each unit number sits. Both drawings are the developer’s own; the floor area shown for Type A is a listed figure that I will confirm against the sale documents before you rely on it.

Silkspring Residence Type A floor plan, three bedrooms and two bathrooms, Butterworth, Penang

Type A — 1,172 sq ft

Every home in the block · living, dining, kitchen, yard, utility room and balcony · the drawing prints 12,600 mm × 10,926 mm overall · 1,172 sq ft is a listed figure, to be confirmed against the sale documents

🛏 3 Bed🛁 2 BathOfficial drawingSize: listed
Get this floor plan
Silkspring Residence typical floor plan with eleven Type A units along one corridor, Butterworth, Penang

Typical floor · Levels 5 to 17

The floor plate, not a second layout · eleven Type A homes along one corridor · units 1 to 5 on the lift-lobby side, units 6 to 11 opposite · two lifts and two staircases drawn

Official drawing11 homes a floor
Get this floor plan
Location & connectivity

Where Silkspring Residence @ Butterworth, Penang sits

Butterworth, on the Penang mainland — off Jalan Telaga Air, 0.3 km in a straight line from the Butterworth Digital Library, 0.4 km from SJK(C) Chung Hwa 1 and 2.2 km from Penang Sentral, the hub for the ferry, the KTM trains and the buses.

Open in Google Maps →
📍 5.411300, 100.37630012200 Butterworth

The register files this project at 5.411, 100.375 — coordinates rounded to three decimal places, which land about 0.15 km west of the plot. I have placed the pin on the construction site that satellite imagery shows directly beside WellSpring (5.4113, 100.3763), which agrees with the developer’s location plan. Distances are straight-line from the pin.

What the map does not tell you. The plot sits behind Jalan Telaga Air and is reached by the lanes off it; the one along the site’s west side is labelled Lorong Kubur on Google Maps. Drive the approach at school time and in the evening peak before you commit. Straight-line figures also ignore the channel: KOMTAR is 5.2 km away as the crow flies, but you get there by ferry from Penang Sentral or over the Penang Bridge, which is 7.2 km to the south.
  • Butterworth Digital Library0.3 kmstraight-line
  • SJK(C) Chung Hwa 10.4 kmstraight-line
  • Bagan Specialist Centre1.1 kmstraight-line
  • Penang Sentral (ferry, KTM, buses)2.2 kmstraight-line
  • Sunway Carnival Mall, Seberang Jaya2.8 kmstraight-line
  • Sunway Medical Centre Penang2.9 kmstraight-line
  • Lotus’s Bagan Ajam3.2 kmstraight-line
  • Hospital Seberang Jaya4.0 kmstraight-line
  • Penang Bridge7.2 kmstraight-line
The government record

On the government register it is project 30941-1, Residensi Ria Sutera — 148 units at 19.83% built

The housing developer’s licence is held by Eco Summit Sdn. Bhd. (30941), and the advertisement it filed carries the Airmas website. Residensi Ria Sutera is the only project recorded under this licence. Search the register by that name or by the code; a search for ‘Silkspring’ returns nothing.

Project codeRegistered nameAdvertising permitPermit expiresUnitsBed / bathStatus
30941-1Residensi Ria Sutera — flats / condominium, 18 storeys30941-1/09-2028/0796(A)-(S)29 Sep 20281483 / 219.83% built · on track

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Read from teduh.kpkt.gov.my on 5 October 2026. Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=30941-1

148 on the register, 148 on the advertisement

The register files one component: 148 flats / condominium units in an 18-storey building, each with three bedrooms and two bathrooms. Its unit list runs from Level 3A to Level 17 — five homes on 3A, which is the Level 4 facilities floor on the developer’s plan, and eleven on each of the thirteen floors above. That adds up to 148, the total printed on the filed advertisement. On 5 October 2026 the list showed 43 homes as sold and 105 as not yet sold, with none flagged as Bumiputera quota. The register’s floor-area field is blank for this project.

What the permit band means for a foreign buyer

The advertising permit records a minimum of RM527,650 and a maximum of RM558,650 across the 148 units. That is the band on the advertising permit, not the price of any unit. Seberang Perai’s floor for a foreign individual buying strata property is RM500,000, so the whole band is above it and a foreign individual may apply for state consent. A foreign company faces a floor of RM1,000,000, which this band does not reach.

Schedule H, 36 months, no extension on record

The sale and purchase agreement is Schedule H (strata), with the standard 36-month delivery period and no approved extension recorded. The register dates the first agreement 20 April 2026, which puts the latest delivery under that agreement at 20 April 2029. Your own 36 months run from the date of your agreement.

19.83% built; the developer’s target is May 2028

The latest 7(f) return reports the building 19.83% complete and ‘lancar’ (on track). No certificate of completion and compliance and no vacant possession date is recorded yet. The filed advertisement gives May 2028 as the expected completion date. That is a target, earlier than the contractual deadline, and not a promise.

Track record

About Airmas Group

Airmas Group is a Butterworth developer. Its website says the group was founded in Butterworth in 1986, has completed more than 5,000 housing and commercial units, and works across landed homes, multi-storey apartments and commercial shop offices. Its office is at Jalan Jelawat, Seberang Jaya.

Silkspring appears first among the projects on the group’s website. Next to it is WellSpring, the condominium on the adjoining plot, which shares the location plan with Silkspring; it is on the register as Residensi Ria Emas, with a certificate of completion dated 16 May 2024. The website also names Taman Riang, Tan Sai Gin, Damai Springs and Alton Sky Villas among others.

For Silkspring the group’s page publishes a perspective, a location plan, the typical floor, two facilities plans and the Type A drawing. The statutory details are on the advertisement filed with the register: building plan approval MBSP/40/20-24/52(PR) from Majlis Bandaraya Seberang Perai, an 18-storey apartment building of 148 units, freehold, expected completion May 2028.

One honest caveat. You will not sign with a company called Airmas. The licensed developer is Eco Summit Sdn. Bhd., and the register shows Silkspring as the only project under its licence. One company per project is a common structure, but it means the track record you rely on belongs to the group while the contract is with the project company. Read the vendor’s name on the sale and purchase agreement, and ask me which completed Airmas buildings you can walk through to judge the workmanship.

Straight answers

Frequently asked questions

How many units are there at Silkspring Residence?

148, in one 18-storey block. The government register and the developer’s filed advertisement give the same total.

The register’s unit list has eleven homes on each of thirteen floors, labelled 5 to 17 with 13A in place of 14, and five homes on 3A — the Level 4 floor that also holds the multipurpose halls and the garden. On 5 October 2026 it showed 43 homes as sold and 105 as not yet sold.

Is Silkspring Residence freehold?

Yes. The advertisement the developer filed with the government register prints ‘Pegangan Tanah: Kekal’, which means freehold.

The title to an individual home will be a strata title issued after completion. Your solicitor’s land search confirms the tenure and any restriction on the master title before you sign, and I will ask the developer for the title particulars on request.

What size are the units at Silkspring Residence?

Every home is Type A with three bedrooms and two bathrooms. Listings give the built-up area as 1,172 sq ft; that is a listed figure, because neither the developer’s website nor its filed advertisement prints one.

The developer’s drawing shows a living room with a balcony, a dining area, a kitchen, a yard, a utility room, a master bedroom with its own bathroom and two more bedrooms sharing the second bathroom. It prints overall dimensions of 12,600 mm by 10,926 mm. The area that counts is the one in the sale and purchase agreement, and I will get it for you.

Can a foreigner buy at Silkspring Residence?

A foreign individual can, subject to state consent. On the Penang mainland the floor for a foreign individual buying strata property is RM500,000, and the permit band here runs from RM527,650 to RM558,650 — the band on the advertising permit, not the price of any unit — so the whole of it is above the floor. A foreign company faces a floor of RM1,000,000 and would not qualify at these figures.

Allow for the 3% state levy on approval and the flat 8% stamp duty that applies to non-citizens on residential property since 1 January 2026, and note that a home bought with state consent can be resold only after three years. The register’s list flags none of the 148 units as Bumiputera quota. I will confirm eligibility for the specific unit before you pay anything.

When will Silkspring Residence be completed?

The developer’s filed advertisement gives May 2028 as the expected completion date. The register showed the building 19.83% complete and on track when I read it on 5 October 2026.

The contractual deadline is later. The agreement is Schedule H with 36 months to deliver; the first agreement on record is dated 20 April 2026, so the latest delivery under it is 20 April 2029. No extension has been approved. Your own deadline runs from the date you sign.

Which floor or unit should I choose?

The plan is the same everywhere, so you are choosing position. On the developer’s typical floor, units 1 to 5 line the north side of the corridor, where the lift lobby is, and units 6 to 11 line the south side. The ground-floor plan puts the swimming pool and the Level 4 plan puts the garden on that south side, so units 6 to 11 look over them and units 1 to 5 look over the entrance.

Units 1 and 11 are at the lift end; units 5 and 6 are at the far end, beside the second staircase. The five homes on Level 4 share their floor with the three multipurpose halls, which is convenient but livelier on event days. Tell me whether you want quiet, a short walk to the lift or the pool-side facing, and I will check which of the 105 unsold homes fit.

What is the price, and what are the monthly charges?

The only price information I publish is the band on the government advertising permit: RM527,650 to RM558,650 across the 148 units. That is the band on the advertising permit, not the price of any unit.

The developer has not published the maintenance charge or the sinking fund contribution, and I do not repeat figures from listings. Message me and I will send the current price list for the unsold homes and the charges in writing.

How does Silkspring Residence compare with Harbour View Residence?

They are the two new freehold towers in Butterworth on this site, 1.8 km apart in a straight line. Harbour View Residence is a 32-storey tower of 373 homes of 950 sq ft, 762 m from Penang Sentral. Silkspring is 18 storeys and 148 homes with a listed 1,172 sq ft, 2.2 km from Penang Sentral.

So the choice is density and space against position: fewer neighbours and a larger listed floor area here, or a taller tower closer to the ferry and the trains there. Both have three bedrooms and two bathrooms. Read the Harbour View page for its own register record, then ask me to set the two side by side.

Is the location practical for daily life, and will it rent?

For daily life the straight-line distances are short: SJK(C) Chung Hwa 1 at 0.4 km, Bagan Specialist Centre at 1.1 km, Sunway Carnival Mall at 2.8 km, Lotus’s Bagan Ajam at 3.2 km and Hospital Seberang Jaya at 4.0 km. Penang Sentral, for the ferry to George Town and the KTM trains, is 2.2 km away.

On renting, I do not quote rental figures. A three-bedroom home in an established part of Butterworth suits families and people who work on the mainland more than short-stay guests, and with one layout throughout you will be competing with identical homes, so floor, facing and fit-out will decide how quickly yours lets. Ask me what similar completed condominiums around Raja Uda are achieving before you buy to let.

Get the current price list and unit availability

Developer pricing moves, and the good stacks go first. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit, not a generic brochure.

No agent fee payable by the buyer on new developer launches

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文

I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-05 · Last verified 2026-10-05 against Airmas Group’s Silkspring project page and plans; the developer’s advertisement filed with the government register; teduh.kpkt.gov.my record 30941-1, read on 5 October 2026; one floor-area figure from published listings, marked ‘listed’. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Silkspring Residence @ Butterworth, Penang148 freehold homes · Butterworth
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: Airmas Group (2 developments on this site)

Where it is: Butterworth, Penang

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

30941-1 · RESIDENSI RIA SUTERA

Overall status: Lancar — on schedule

Certified completion by componentRumah Pangsa/Kondo – 148 units19.83%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
18 storeys
Lancar
3 / 2—148RM527,650.00
– RM558,650.00
19.83%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 30941-1. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.