EDEN Taman Duta — 146 freehold units on Jalan Gallagher, and KPKT files them as a condominium, not as villas

Everybody calls them villas. The main contractor’s own Bursa announcement says “villa residences”, the quantity surveyor says villa residences, the construction register files the job under “Villas”, and three newspapers say villa. The filing says something else: Kondominium, Rumah Pangsa/Kondo and Jadual H — 146 strata parcels in eight blocks of three to seven storeys, sold on the Schedule H parcel contract. “Resident’s Villa” and “Penthouse” are the developer’s names for unit types. They are not landed houses on their own titles, and that changes the deposit, the progress-payment ladder, the delivery clock and the late-delivery mechanics. This page sets the filed record beside the marketing, line by line, and names the source of every number.

Filed Jadual H — not Jadual G146 units · 8 blocks · 3–7 storeysFreehold · Hakmilik KekalKPKT project 32-16 · developer code 32APDL current to 24 Jul 2028Approved +12-month extension — and the developer’s own filed brochure prints the revised dateEvery filed unit clears the Kuala Lumpur RM1,000,000 foreign-buyer floor11.92 units per acre — the lowest density on this site’s KL list

Louis Koh, Director, LK Group Marketing · IQI Realty Sdn Bhd · Registered Estate Agency. Ask for the filed advertisement, the price list and the SPA — not for a figure off a web page.

Filed, not marketedEvery hard number here is sourced to the KPKT TEDUH register, the filed KPKT HIMS advertisement brochure, a Bursa-reported contract announcement or a named publication.
Where sources disagree, both appearFive different completion dates circulate on this project. All five are tabulated, with the governing one marked.
Figures we refuse to printThe developer’s own microsite carries a price table in which six of eight minima sit below the filed statutory minimum. None of those figures is on this page.
Nothing inventedNo source publishes a single distance, a drive time or a rail station for this project. That absence is printed as a finding, not filled in.
Resident’s Villa unit type living room overlooking the city skyline, artist’s impression at EDEN Taman Duta (registered RESIDENSI EDEN) by BRDB Developments Sdn Bhd, Jalan Gallagher, Taman Duta / Bukit Tunku, Daerah Kuala Lumpur, Kuala Lumpur, Wilayah Persekutuan
Resident’s Villa unit type — living room over the city skyline. Artist’s impression. Subject caption-published: this is the developer’s own printed alt text, verbatim, from brdbeden.com.my. “Resident’s Villa” is a unit TYPE inside a strata block, not a landed villa — see the filed built form below.
Penthouse unit type terrace with panoramic city skyline, artist’s impression at EDEN Taman Duta (registered RESIDENSI EDEN) by BRDB Developments Sdn Bhd, Jalan Gallagher, Taman Duta / Bukit Tunku, Daerah Kuala Lumpur, Kuala Lumpur, Wilayah Persekutuan
Penthouse unit type — terrace with panoramic skyline. Artist’s impression. Subject caption-published from the developer’s own alt text. There are 22 penthouses by three concurring sources — and not one of them appears in the filed statutory built-up schedule.
Low-rise residential building exterior, artist’s impression at EDEN Taman Duta (registered RESIDENSI EDEN) by BRDB Developments Sdn Bhd, Jalan Gallagher, Taman Duta / Bukit Tunku, Daerah Kuala Lumpur, Kuala Lumpur, Wilayah Persekutuan
Low-rise residential exterior. Artist’s impression. Subject INFERRED from the developer’s filename only (building-exterior.jpg) — no alt text and no caption is printed for this image anywhere, so no block, no storey count and no elevation is asserted for it.
Answer block

EDEN Taman Duta at a glance — the filed particulars first

Read the left column as the question a buyer actually asks and the right column as what the filed record says, with the source named. Where the developer’s own two documents disagree, both are shown.

Registered scheme name
RESIDENSI EDENKPKT TEDUH project 32-16, field nama. The quantity surveyor’s own record titles it “Residensi Eden” too. No public marketing surface uses the registered name: the developer markets “EDEN Taman Duta”, the filed brochure says bare “EDEN”, and “The Eden” is used by no source at all.
KPKT project code
32-16 · developer code 32A two-digit developer code, which is unusual: most codes on this site’s pages run to five digits. Print both and a client can run the register check themselves at teduh.kpkt.gov.my.
Built form, as FILED
Kondominium · Rumah Pangsa/Kondo on all eight component rowsFiled KPKT HIMS advertisement brochure (Jenis perumahan) and the TEDUH register. Not landed.
Sale contract
Jadual H (Schedule H)TEDUH pjb.jenis. Corroborated by the filed tempohAsal: 36 Bulan — 36 months is the Schedule H statutory delivery period; Schedule G’s is 24.
Total units
146TEDUH unitSummary.unit; the filed brochure’s block table sums to 146; and both Bursa-reported contract announcements and the quantity surveyor’s record say 146. Tatler Asia’s “168 units” is wrong — it has added the 22 penthouses to a total that already contains them.
Blocks and storeys
8 residential blocks, lettered A to H · three to seven storeysFiled brochure block table (A, B, E, F: 3 & 5; C, D, G, H: 7); the register prints only 5 and 7; The Edge Weekly says “eight low-rise blocks of three to seven storeys”. The quantity surveyor counts 11 blocks in total — 8 residential plus 1 clubhouse plus 2 car-park blocks.
Tenure
freehold — Hakmilik Kekal · land restrictions Tiada (none)Filed brochure, Pegangan tanah and Sekatan kepentingan. The developer’s own site prints “Freehold” and “land restrictions: none” identically. No lease expiry exists.
Licensed developer
BRDB Developments Sdn Bhd (5521-A)Filed brochure Pemaju; the register writes it BRDB DEVELOPMENTS SDN. BHD. under code 32. The licensee IS the brand — eleven independent surfaces name this one company and no project SPV exists to unmask, which is unusual on this site’s KL list.
Developer licence
32/08-2028/1034(A), valid 18 Aug 2023 – 17 Aug 2028The suffix is printed three ways by three surfaces of the same developer: the filed brochure prints (R); the register and the developer’s own live website both print (A). This page publishes the register’s (A) and names the disagreement.
APDL
32-16/07-2028/0602(A)-(S), valid 25 Jul 2025 – 24 Jul 2028 — currentThe filed brochure prints the permit number as a literal xxxxxxxxxxxxx placeholder. It is recovered from two independent surfaces that agree — the TEDUH register and the developer’s own published APDL block — so unlike most placeholder cases, lapse CAN be assessed here. An inactive twin …0602(N)-(S) sits in the register history on identical dates.
Filed statutory Unit Selling Price band
RM9,566,340.00 – RM37,751,587.00 across the eight filed unit groupsFiled statutory band from the KPKT HIMS advertisement brochure, identical to the sen in the TEDUH register — no splice between permit generations, which is itself a finding. This is marketing information. It is not a price list, not a quotation and not an offer. The only price that binds anyone is the one in the price list and the SPA at the sales gallery.
Foreign buyers
Yes — and every single filed unit clears the floorKuala Lumpur / Wilayah Persekutuan applies a RM1,000,000 minimum purchase price per unit with State Authority / EPU consent. The lowest filed statutory price on the whole project is RM9,566,340.00 — 9.57× the floor (our arithmetic on filed figures). This is the first project on this site’s KL list where the floor is simply not a constraint.
Delivery — the governing date
5 January 2030 (revised), from an original 5 January 2029TEDUH: pindaanTempohSerahKosong: Ya, tempohTambahanDiluluskan: 12 Bulan, 36 → 48 months, first SPA 5 Jan 2026. The developer’s own filed brochure already prints the revised date (Tarikh dijangka siap: Januari 2030) — disclosed, not buried. Credit that.
Construction progress
20.00% · no CCC · no vacant possession · register status LancarAll eight component rows read peratus: 20.00, ccc: “-”, vp: “-”, komponen: Lancar. So this project cannot be called late and cannot be called early. Say exactly that.
Built-up, as FILED
three types only: A-1 5,522–5,533 sq ft · A-2 5,296–5,307 sq ft · C 6,491 sq ftFiled brochure’s statutory built-up schedule. All 22 penthouses are absent from it — so 15.07% of the units have no filed built-up area at all (our arithmetic), and the filed ceiling of 6,491 sq ft is less than a third of the marketed 19,041. The register carries no built-up area: unitSummary.keluasan: “0 mps”.
Bedrooms / bathrooms
4 + 2 bedrooms and 5 bathrooms plus a powder room, on every filed typeFiled brochure. 4 + 2 is the Malaysian filing convention for four bedrooms plus two utility rooms — six rooms, which is exactly the register’s bilik: “6, 7”. Do not read it as six bedrooms. The register’s 7 has no counterpart in the filed schedule and must belong to the unscheduled penthouses. The developer’s own website publishes no bedroom or bathroom count at all.
Density
11.92 units per acre (our arithmetic: 146 ÷ 12.25 acres)The acreage is the group CEO’s own stated figure in a named interview, corroborated by The Star as “4.95ha (12.25 acres)” — not a filed figure; no KPKT document prints a land area. About 29.5 units per hectare; site area about 533,610 sq ft; about 3,655 sq ft of site per unit (all ours).
Site and approving authority
Lot 480191 (formerly Lots 765, 766, 767 and 768), Jalan Gallagher, Taman Duta / Bukit Tunku · Dewan Bandaraya Kuala Lumpur, plan reference BP T2 OSC 2025 0384The lot comes from the Bursa-reported Kerjaya Prospek announcement and the quantity surveyor’s record, independently, in the same words — KPKT prints no lot, no mukim and no site address. The DBKL reference appears on the filed brochure and on the developer’s own site. Filed coordinates 3.157199 N, 101.674417 E, Daerah Kuala Lumpur, Negeri WP Kuala Lumpur.
Green rating
None — not even provisionalNo entry for this project in the reachable portion of GreenRE’s Platinum, Gold, Silver or Bronze registers, and no GBI record (GBI’s own directory is unreachable, which proves nothing either way). The reported “aligned with GreenRE Gold standards” is a design target, not a certification.
Awards
None at project levelEvery award traceable to this developer is corporate or belongs to another project. Refuse every “award-winning” formulation applied to EDEN.

Six things about EDEN Taman Duta that only the filing will tell you

None of these six is in a brochure headline. All six come out of the KPKT register, the filed advertisement, a Bursa announcement or a direct comparison between two documents the developer itself published.

📄

It is filed as a condominium, not as villas

The word “villa” appears in the contractor’s announcement, the quantity surveyor’s record, the construction register’s category and three newspapers. KPKT files Kondominium, Rumah Pangsa/Kondo on all eight component rows, and Jadual H as the sale contract. A buyer told “villa” will assume Schedule G, individual title and a 24-month clock. All three assumptions are wrong here.

📅

The +12-month extension is disclosed, which is rare

The register prints pindaanTempohSerahKosong: Ya and tempohTambahanDiluluskan: 12 Bulan, moving delivery from 5 Jan 2029 to 5 Jan 2030. What makes this project different is that the developer’s own filed brochure already prints the revised date, Januari 2030. On most projects on this site’s list the brochure still printed the original date. That deserves credit.

📈

The original date was unreachable from the start

The main building contract was only let on 12 June 2026, commencing 15 June 2026 with a 33-month period — which programmes completion at about mid-March 2029, after the original 5 Jan 2029 delivery date (our arithmetic on the announced dates). The first SPA was signed five months before the builder was appointed. On the public record the extension reads as a re-baselining, not a late excuse.

💰

The developer’s own website disagrees with the developer’s own filing on price

The microsite prints an APDL panel with the same eight unit groups, the same unit counts and the same storey counts as the filed advertisement — and different money, with six of its eight minima below the filed statutory minimum. This page prints the filed statutory band only, and none of the lower figures. Verify the current band at teduh.kpkt.gov.my against project 32-16 before relying on anything.

🌍

Nobody publishes a single distance

The developer’s own location page carries four category headings and not one place name in its text; the place names and any distances live only inside a raster map image. The Edge, The Star, EdgeProp and Tatler all name landmarks with no distance and no travel time. No source names a rail station. That is the finding, and nothing has been estimated to fill it.

🧮

Density is genuinely computable here, and it is low

146 units on the 12.25 acres the group CEO states on the record gives 11.92 units per acre (ours) — the lowest on this site’s KL list. Two land-area traps would destroy that number: Tatler prints “12.25 hectares”, overstating the site about 2.47×, and the quantity surveyor’s “Area 1,515,000 sq ft” is a gross floor area, not a land area. Both are refused below.

Project DNA

The filed record, the construction chain, and five completion dates

Everything in this section is either a filed KPKT field, a Bursa-reported contract announcement, or a named publication — and it says which. The facilities list is the honest weak point on this project: the developer itself itemises almost nothing.

146filed units · Rumah Pangsa/Kondo
8residential blocks, A to H (no Type B exists)
3–7storeys — low-rise, not a tower
11.92units per acre (ours, on the CEO’s 12.25 acres)
20.00%construction progress, filed
48month delivery period, extended from 36
22penthouses — and none is in the filed built-up schedule
0distances published by any source

Facilities — and who actually published each list

Read this with the caveat in front of it. The developer’s own facilities page carries no bulleted list and no table. It prints one facility name in text — “The Eden Club” — and three more that exist only inside image alt text. Its 13-image experience gallery names no facility at all. Every specific amenity below therefore comes from a magazine or a portal, not from the developer, and no source assigns a single facility to a level or a floor. The one piece of hard evidence is contractual: a dedicated clubhouse block is inside the main building contract’s scope.

The Eden Club

The Edge Weekly — a magazine, not the developer
  • Concierge
  • Lounges
  • Function room with decks and terraces
  • Gym
  • Swimming pools
  • Creche
  • Children’s playground
  • Barbecue area
  • Yoga deck
  • Garden cabanas

Wellness Pavilion

The Edge Weekly · name also in the developer’s alt text
  • Steam room
  • Sauna
  • Plunge pool
  • Jacuzzi
  • Private pool

Garden Pavilion

The Edge Weekly · name also in the developer’s alt text
  • Viewing deck
  • Function areas
  • Event space
  • Barbecue area
  • Open lawn

Active Pavilion

The Edge Weekly · name also in the developer’s alt text
  • Tennis court
  • Therapy room
  • Sports lounge
  • Multipurpose court — basketball and pickleball
  • Green terrace

What the DEVELOPER itself publishes

brdbeden.com.my — the primary surface
  • One facility name in page text: “The Eden Club”
  • Three more names that appear only in image alt text: Garden Pavilion, Active Pavilion, Wellness Pavilion
  • The phrase “five-star facilities” — there is no five-star rating system for residential amenities
  • 13 gallery images captioned “Facilities 1…13”, naming no facility
  • Not one itemised amenity anywhere on the site

A third list, and what we refuse from it

EdgeProp — partly different again
  • Guarded estate entrance and main front court
  • Lobby
  • Pool deck and spa deck
  • Tennis court and health park
  • Grill area
  • Secure parking
  • “Rooftop garden” — REFUSED. Only EdgeProp has it. The Edge Weekly’s pavilion schedule has a viewing deck and a green terrace and no rooftop garden, and the developer’s own page has neither. It is not promised here.
  • “Main front court”, “spa deck” and “health park” also appear on no other surface

Green features — all claimed, none specified

The Edge Weekly + the developer’s own PAID advertorial
  • Solar panels — no capacity published
  • Rainwater harvesting — no capacity published
  • Electric-vehicle charging — the one item with a second source; no charger count published
  • Regenerative lifts · high-performance glazing · heat-reducing roof · LED lighting · water-efficient fittings — no coverage or specification for any of them
  • Bicycle parking · naturally ventilated car parks · “renewable energy solutions” — these appear only in the developer’s own paid advertorial, with no count, no capacity and no location
  • Concrete Usage Index and a green plot ratio based on Leaf Area Index are cited — these are real GreenRE and GBI assessment metrics, consistent with a project being prepared for assessment. Preparation is not a rating.
  • “About 30% of the site is greenery” — The Edge Weekly’s figure, not ours and not a filed green plot ratio. No breakdown and no definition of “greenery” is published.
  • Reported as “aligned with GreenRE Gold standards” — that is targeting language. There is no GreenRE rating for this project, provisional or otherwise.

Parking — and the two construction sources disagree

contract announcement vs quantity surveyor vs magazine
  • No KPKT filing prints a car-park allocation at all, for any type — and the developer’s own site prints none either
  • 4 to 11 bays per unit, all “in the podium”, with EV charging — The Edge Weekly, and the only source for a bay range; no source maps bays to unit types
  • 2 car-park blocks plus 2 levels of basement parking — Kerjaya Prospek’s own contract scope
  • Basement car parks “of 2 and 4 levels” — the quantity surveyor’s record, which disagrees with the contractor’s own letter of award. The contractor’s scope is the better authority for what is being built.
  • No total bay count is published by anyone, and no source says whether the bays are accessory parcels or common-property allocations — which decides the share units and the service charge

The construction chain, with sums, from public announcements

Bursa-reported announcements and the QS record
  • Employer: BRDB Developments Sdn Bhd — named in both announcements, with no registration number given in either
  • Main building contractor: Kerjaya Prospek (M) Sdn Bhd, a wholly owned subsidiary of Kerjaya Prospek Group Berhad — RM529,319,000, fixed lump sum. Letter of award 12 June 2026, accepted and commenced 15 June 2026, completion within 33 months. Scope: 8 blocks of villa residences (146 units), 2 blocks of car parks, 2 levels of basement parking, common amenities and a clubhouse, at Lot 480191, Jalan Gallagher.
  • Earthworks and substructure: Econpile (M) Sdn Bhd — RM83 million, announced 14 March 2024, 18 months from 1 March 2024. Scope: earthworks, retaining structure, piling, road deck and ancillary works for 146 villa residences including common facilities and a clubhouse. Neither announcement says whether this sits inside or outside the main contract — do not assume they add up.
  • Quantity surveyor: Northcroft — full QS services; the record that gives the lot number and the former lots, and counts 11 blocks
  • Interior design: SPACE Group (Australia), with SPACE Atelier available to residents as a bespoke personalisation service
  • Architect of record: NOT ESTABLISHED and therefore not published. The construction register holds the name behind a subscription; The Star names three Malaysian firms “contributing expertise” without saying which is the architect; Tatler names none.
  • Site works began about two years before the project was unveiled: the earthworks contract ran from 1 March 2024, and the project was unveiled in Q1 2026 after being, per The Edge Weekly, “originally slated for 2024 but held back for design revisions”

Dates — and five different completion dates are in public circulation

18 Aug 2023Developer licence 32/08-2028/1034(A) begins. Filed brochure prints the same serial with suffix (R).
1 Mar 2024Earthworks, retaining structure and piling start under the RM83m Econpile subcontract — about two years before the project was unveiled.
25 Jul 2025APDL 32-16/07-2028/0602(A)-(S) takes effect; 36-month permit period. An inactive (N) twin exists on identical dates.
Q1 2026Project unveiled. The Edge Weekly: originally slated for 2024, held back for design revisions.
5 Jan 2026First SPA signed — the date the whole statutory delivery clock is keyed to. tarikhPjbPertama.
12 Jun 2026Main building contract let to Kerjaya Prospek: RM529,319,000, commencement 15 Jun 2026, 33 months.
17 Aug 2026Document date of the filed HIMS advertisement brochure. Its own “baki” column sums to 103 of 146 units unsold at that date — about 70.5% (our arithmetic on a filed disclosure; it will go stale).
9 Oct 2026Today. Construction progress 20.00%, no CCC, no vacant possession, register status Lancar on the development and on every one of the eight components.
“2027”WRONG — the quantity surveyor’s record says “anticipated completion 2027”. Not statutory, and unreachable on the contractor’s own programme.
“2028”WRONG — Tatler Asia prints 2028. The same article also prints 168 units and 12.25 hectares, both of which are errors.
~Mar 2029Practical completion as programmed by the main contract: 33 months from 15 Jun 2026 (our arithmetic). This is after the original 5 Jan 2029 delivery date — which is why that date was unreachable from the moment the builder was appointed.
5 Jan 2029SUPERSEDED — the original filed vacant possession date, 36 months from the first SPA. serahKosongIkutPjb.
“Dec 2029”WRONG — the developer’s own live microsite still prints “Expected Completion: December 2029”, which is neither the original nor the revised filed date. The site has not caught up with the filing.
5 Jan 2030GOVERNING — the revised filed vacant possession date. serahKosongBaharuIkutPjbPertama, after an approved +12-month extension of time: 36 → 48 months. The developer’s own filed brochure prints Tarikh dijangka siap: Januari 2030 — the revised date, disclosed rather than buried.
24 Jul 2028APDL expires. Current today, about 21.5 months left to run (ours).
17 Aug 2028Developer licence expires. About 22.3 months left (ours).
5 Jan 2032Our arithmetic, not a filed date: the defect liability period under Schedule H runs 24 months from vacant possession, so on the revised date it would close here. Check it against your own SPA.
Layouts

Layouts — the filed schedule has three types, the marketing has five

The filed statutory built-up schedule and the developer’s marketed schedule are not the same document and do not describe the same product. The filed schedule stops at 6,491 sq ft; the marketed ceiling is 19,041. Both are printed here, each labelled with whose document it is. No floor plan of any kind is published by any source, so none is shown.

Site plan of the development and its surrounding neighbourhood at EDEN Taman Duta (registered RESIDENSI EDEN) by BRDB Developments Sdn Bhd, Jalan Gallagher, Taman Duta / Bukit Tunku, Daerah Kuala Lumpur, Kuala Lumpur, Wilayah Persekutuan

Site plan — eight blocks, lettered A to H

Developer’s own site plan · subject caption-published from its printed alt text, verbatim

8 blocksA to HNo Type B3–7 storeysClubhouse block in the building contract

The filed brochure’s block table and the developer’s own block table agree on eight residential blocks lettered A to H, with A, B, E and F filed as 3 & 5 storeys and C, D, G and H filed as 7. The register prints only 5 and 7; the developer’s site prints floors 1–5 and 1–7; The Edge Weekly says three to seven storeys. Nothing published resolves whether 3 & 5 means two block heights or two occupied floors, so this page publishes the range “three to seven storeys across eight blocks” and attributes it. The quantity surveyor counts eleven blocks in all — the eight residential blocks plus a clubhouse block and two car-park blocks. Which blocks hold the penthouses is not published by anyone, and is not guessed at here.

No floor plan is published for this type by any source. The filed schedule gives area and room counts only.

FILED Jenis A-1 — 5,522 to 5,533 sq ft

Filed KPKT HIMS statutory built-up schedule · about 513–514 m² (our conversion at 1 sq ft = 0.092903 m²; the filing publishes no metric figure)

4 + 2 bedrooms5 bathrooms + powder roomStrata parcel, Schedule HNo car-park allocation filed

4 + 2 is the Malaysian filing convention for four bedrooms plus two utility or helper rooms — six rooms in total, which is exactly what the register reports as bilik: “6, 7”. Do not read it as six bedrooms. Five bathrooms plus a bilik serbuk (powder room) makes six, matching the register’s bilikAir. No car-park allocation appears in the filed schedule for any type.

No floor plan is published for this type by any source.

FILED Jenis A-2 — 5,296 to 5,307 sq ft

Filed KPKT HIMS statutory built-up schedule · about 492–493 m² (our conversion)

4 + 2 bedrooms5 bathrooms + powder roomThe smallest filed type

This is the floor of the whole project at 5,296 sq ft. The marketing merges A-1 and A-2 into a single “Type A” and publishes the range 5,296 – 5,533 sq ft — which is A-2’s floor married to A-1’s ceiling. Two filed types, one marketed type. If a client is comparing paperwork to a brochure, that is where the letters stop matching.

No floor plan is published for this type by any source.

FILED Jenis C — 6,491 sq ft

Filed KPKT HIMS statutory built-up schedule · about 603 m² (our conversion) · the filed ceiling

4 + 2 bedrooms5 bathrooms + powder roomLargest type with a FILED area

This is where the filed statutory schedule stops. It is less than one third of the marketed ceiling of 19,041 sq ft — a ratio of 2.93× (ours). Everything above this line in the marketed range has no filed built-up area at all.

The developer publishes no floor plan, no bedroom count and no bathroom count for any marketed type.

MARKETED “Resident’s Villa” Type A — 5,296 to 5,533 sq ft

Developer’s microsite · about 492–514 m² (our conversion)

Marketed, not filed= filed A-1 + A-2 mergedBedrooms NOT PUBLISHEDBathrooms NOT PUBLISHED

“Resident’s Villa” is the developer’s name for a unit type, not a description of a landed house. These are strata parcels inside blocks of three to seven storeys, sold on the Schedule H contract. The developer’s own website publishes no bedroom and no bathroom count for this or any type — on a product whose filed statutory minimum is RM9,566,340.00. The only room counts in public are the filing’s, the register’s and one magazine’s description of the show unit.

No floor plan published. This is the one marketed type whose area matches a filed type exactly.

MARKETED “Resident’s Villa” Type C — 6,491 sq ft

Developer’s microsite · about 603 m² (our conversion)

Marketed and filed areas agreeSingle levelBedrooms NOT PUBLISHED

The only marketed figure that lands exactly on a filed figure. The Edge Weekly groups Types A and C together as the project’s single-level units, 5,296 to 6,491 sq ft, which is consistent with the filed schedule and with the microsite.

NOT IN THE FILED SCHEDULE. No filed built-up area exists for this type, and no floor plan is published.

MARKETED Penthouse Type A — 9,182 to 9,192 sq ft

Developer’s microsite · about 853–854 m² (our conversion)

No filed areaDouble-storeyInternal stairs and a liftBedrooms NOT PUBLISHED

The Edge Weekly reports 22 double-storey penthouses with internal stairs and a lift, 9,182 to 19,041 sq ft. Three sources agree on the count of 22. Not one of the three penthouse types appears in the filed statutory built-up schedule, so 15.07% of the units on this project have no filed built-up area (our arithmetic: 22 ÷ 146). “Penthouse” here is a unit type inside a strata block, not a separate landed product.

NOT IN THE FILED SCHEDULE. No floor plan is published.

MARKETED Penthouse Type C — 11,141 sq ft

Developer’s microsite · about 1,035 m² (our conversion)

No filed areaAlmost certainly the show unitDouble-storey

Tatler Asia describes a show unit of 1,035 m² with “more than four” bedrooms and seven bathrooms plus a guest toilet — and does not say which type it is. 1,035 m² is exactly Penthouse Type C, and no other type converts to it. That identification is our inference from the area, not a stated fact — but it is a strong one, and Tatler’s seven bathrooms also matches the register’s upper bilikAir: 7, which has no counterpart in the filed schedule.

NOT IN THE FILED SCHEDULE. No floor plan is published.

MARKETED Penthouse Type D — 18,998 to 19,041 sq ft

Developer’s microsite · about 1,765–1,769 m² (our conversion) · the marketed ceiling

No filed area2.93× the filed ceilingDouble-storey

The largest unit the developer markets, and the least documented unit on the project. The filed price rows do reach RM37,751,587.00, which is where units of this size must sit — but no filed price row is labelled a penthouse and no filed area describes one. The filed price rows are keyed to blocks; the filed built-up schedule is keyed to types; and nothing published joins the two, so a price per square foot cannot be computed honestly for any type.

A genuine gap in the published record, printed here rather than smoothed over.

There is no Type B — anywhere, in either schedule

Filed brochure and developer’s microsite, both negative

Blocks run A to HTypes run A-1, A-2, CNo source explains it

The blocks are lettered A to H. The filed schedule prints A-1, A-2 and C and stops. The marketed schedule prints Villa A, Villa C, Penthouse A, Penthouse C and Penthouse D. No source anywhere prints a Type B. The absence is unexplained by every document checked, and it is recorded as a finding rather than guessed at. Ask the developer directly.

Where the filed and the marketed schedules disagree: three types versus five; A-1 and A-2 as separate filed types versus one marketed “Type A”; a filed ceiling of 6,491 sq ft versus a marketed 19,041 (2.93×, ours); 22 penthouses with no filed area at all; and room counts filed as 4 + 2 and 5 + powder against nothing at all on the developer’s own website. Positively, and worth saying: no source claims a dual-key unit, and no source shows a studio, SOHO or office suite — every one of the 146 units is filed as residential under the HDA, with no non-HDA component. All square-metre figures on this page are our conversion; the filing publishes none. Ceiling heights, balcony and terrace areas, private-lift provision per type, the wet and dry kitchen split per type, and whether any part of a built-up is an accessory parcel are not published by anyone.

Location

Jalan Gallagher, Taman Duta / Bukit Tunku, Kuala Lumpur

Read this section for what is missing as much as for what is here. No source — not the developer, not The Edge, not The Star, not EdgeProp, not Tatler — publishes a single distance, a radius or a drive time to any named place, and no source names a single rail station. The developer’s own location page carries four category headings and not one place name in its text. Nothing below has been estimated to fill that gap.

Open in Google Maps
Filed coordinates 3.157199 N, 101.674417 E — KPKT TEDUH 32-16Daerah Kuala Lumpur · Negeri WP Kuala LumpurApproving authority Dewan Bandaraya Kuala Lumpur · plan reference BP T2 OSC 2025 0384Lot 480191 (formerly Lots 765, 766, 767 and 768) — from the contract announcement and the QS record, not from any KPKT filingNo site postcode is filed or published by anyone — the only postcode on the developer’s surfaces is its head officeNo mukim, seksyen or PT number is printed by KPKT for this project

Developer’s published location map graphic at EDEN Taman Duta (registered RESIDENSI EDEN) by BRDB Developments Sdn Bhd, Jalan Gallagher, Taman Duta / Bukit Tunku, Daerah Kuala Lumpur, Kuala Lumpur, Wilayah Persekutuan The developer’s own location map, used here as a graphic only. Subject INFERRED from the filename (location-map.jpg) — no alt text and no caption is printed for it. This raster is the only place any distance for this project appears anywhere, and no figure has been read off it into the text of this page. A distance transcribed from a marketing image is not a published distance, and on a hillside site reached off a single road a straight-line figure would misrepresent the drive anyway.

Named by a source, with no distance attached to any of them

  • Government and civic: Parliament House · Istana Negara (the National Palace) · KL Tower — EdgeProp, as a landmark list
  • Commercial districts: KLCC · Merdeka 118 · Tun Razak Exchange (TRX) · World Trade Centre KL · MATRADE Exhibition & Convention Centre — EdgeProp and The Edge
  • Retail and lifestyle: Bangsar Shopping Centre (the developer’s own mall) · KL Sentral — EdgeProp
  • International schools: Mont’Kiara International School · Garden International School · Alice Smith School · Cempaka International School · Cambridge International School · Spectrum International School — EdgeProp
  • Private healthcare: Pantai Hospital · Prince Court Medical Centre · Tung Shin Hospital — EdgeProp
  • Neighbourhood: on the boundary of Bukit Tunku, formerly Kenny Hills — The Edge Weekly, The Star and both contract announcements

Access, and the one road every source agrees on

  • Jalan Gallagher is the access road — named independently in the Kerjaya Prospek announcement, the Econpile announcement and the QS record, all inside the lot address, and confirmed by The Star: “Access: via Jalan Gallagher.”
  • No expressway, highway or interchange is named by any source, and no distance to any road is published
  • Taman Duta or Bukit Tunku? Both, and the sources split. The filed brochure’s tagline says Taman Duta; the register prints only “Kuala Lumpur”; the contract announcements and the QS record write “Taman Duta, Bukit Tunku”. This page writes both rather than picking one silently.
  • EdgeProp calls the site “one of Jalan Duta’s last residential sites” — the project fronts Jalan Gallagher, not Jalan Duta, and no land-supply source supports “last”. Refused.

NOT PUBLISHED — no distance or drive time exists for any of these

  • KLCC · Merdeka 118 · TRX · KL Sentral · Bangsar Shopping Centre · MATRADE · the city centre
  • Parliament House · Istana Negara · KL Tower · World Trade Centre KL
  • Any of the six international schools · any of the three hospitals
  • Any MRT, LRT, KTM or monorail station — and no source names one at all. The only transport-adjacent name anywhere is KL Sentral, listed by EdgeProp under lifestyle rather than as a station, with no distance.
  • Any expressway, highway or interchange
  • The nearest convenience retail, bank, clinic, supermarket, place of worship, public park, or national primary or secondary school — not one of these is even named by anyone

One adjacency claim worth treating carefully

  • Tatler Asia asserts the site is “directly adjacent to the Parliament area” — an adjacency assertion with no distance and no second source. The same article carries two errors we have already refused (168 units and 12.25 hectares). Not repeated here as fact.
  • The developer writes “prestigious Parliament precinct” and “the ultimate historic address”; EdgeProp merely lists Parliament House among landmarks. None of the three is a distance.
  • If a rail line or a drive time matters to your client, ask for it in writing from the developer. Louis will chase it rather than estimate it.

Location data on this page is deliberately thin because the published record is thin. Writing a plausible “8 minutes to KLCC” would be inventing it, and this site does not do that. What is solid is the geography: filed coordinates, a DBKL plan reference, a title lot number from two independent non-marketing sources, and a single named access road.

Statutory particulars

RESIDENSI EDEN — the filed KPKT particulars, as filed

This is the spine of the page. Every cell below is a filed field from the KPKT TEDUH public register for project 32-16 or from the filed KPKT HIMS advertisement brochure, and where those two disagree with each other or with the developer’s own website, the disagreement is named rather than resolved silently. Run the check yourself: developer code 32, project 32-16, at teduh.kpkt.gov.my.

Filed scheme nameKPKT projectLicensed developerDeveloper licenceLicence validityAPDLPermit validityHousing type, as filedSale contractUnitsBlocks / storeysBedrooms / bathrooms (register)Filed statutory Unit Selling Price bandTenureApproving authorityBuilding-plan referenceConstruction progressCCCvacant possessionRegister status
RESIDENSI EDEN32-16 · developer code 32BRDB Developments Sdn Bhd (5521-A)32/08-2028/1034(A) register · the filed brochure prints 32/08-2028/1034(R)18 Aug 2023 – 17 Aug 202832-16/07-2028/0602(A)-(S) filed brochure prints xxxxxxxxxxxxx25 Jul 2025 – 24 Jul 2028 · currentKondominium / Rumah Pangsa/KondoJadual H1468 blocks, A–H · 3–7 storeys6, 7 / 6, 7RM9,566,340.00 – RM37,751,587.00freehold · Hakmilik Kekal · restrictions TiadaDewan Bandaraya Kuala LumpurBP T2 OSC 2025 038420.00%- (none filed)- (none filed) · revised date 5 Jan 2030Lancar

The price band is the filed statutory Unit Selling Price minimum and maximum across the eight filed unit groups, taken from the filed KPKT HIMS advertisement brochure and identical to the sen in the KPKT TEDUH register. The overall minimum and maximum are ours: the brochure prints eight rows and no overall band. This is marketing information. It is not a price list, not a quotation and not an offer. The only price that binds anyone is the one in the price list and the SPA at the sales gallery.

Dates verified against the register on 9 October 2026. The developer licence and the advertising and sales permit are two different instruments with two different expiry dates, and a current licence does not imply a current permit. Both are current here.

Schedule G or Schedule H — the question the word “villa” makes a buyer get wrong

A client who hears “villa” will assume a house on its own individual title under Schedule G. EDEN is filed under Schedule H, and three filed fields say so independently: the register’s pjb.jenis: Jadual H; the filed brochure’s Jenis perumahan: Kondominium; and all eight register component rows reading Rumah Pangsa/Kondo across 3-to-7-storey blocks of 12 to 27 units each. The filed tempohAsal: 36 Bulan corroborates it, because 36 months is the Schedule H statutory delivery period and Schedule G’s is 24. Here is what actually changes.

What is sold. Schedule G sells land and building, with an individual title to a parcel of land. Schedule H sells a parcel in a subdivided building — a strata title to an airspace parcel with an undivided share of the common property.
Statutory delivery period. Schedule G: 24 months from the SPA. Schedule H: 36 months — and on EDEN that 36 has been extended to 48 by an approved extension of time.
Progress payments. Schedule G follows its own third schedule. Schedule H follows Schedule H’s third schedule, which is a different ladder, with 5% retained against defects.
Late delivery. Both carry liquidated damages at 10% per annum of the purchase price from the day after the delivery period expires — but the Schedule H clock is longer, and on EDEN it now starts from 5 January 2030 rather than 5 January 2029.
Common property and running cost. Schedule G usually has none, or a modest estate fee. Schedule H makes a management corporation, a service charge and a sinking fund mandatory. EDEN’s only published rate is an estimate of 70 sen per square foot including the sinking fund, reported by The Edge Weekly — a developer estimate repeated by a magazine, not a filed or contractual figure. On that estimate a 5,296 sq ft Villa A would run about RM3,707 a month, a 6,491 sq ft Type C about RM4,544, and a 19,041 sq ft Penthouse D about RM13,329 (all three figures ours, on a magazine’s estimate — treat them as illustrations, not quotations).
Defect liability. 24 months from vacant possession under both schedules.
Altering the outside. Schedule G: the owner’s own, subject to the local authority. Schedule H: restricted by the by-laws and the management corporation.
Foreign-buyer path. Schedule H is the easier category — strata is the conventional foreign-purchase form, where landed property attracts additional restrictions in several states.

The fair reading. “Villa” is an entirely honest description of the product — single-level homes of 5,296 to 6,491 sq ft, four to eleven parking bays, a drop-off per block. It is not a description of the tenure or the contract. Say both, in that order.
And one thing nobody answers: no source states whether the scheme will be one management corporation across all eight blocks and the clubhouse or subsidiary management corporations per block. On an eight-block scheme with a shared clubhouse that materially affects governance and cost allocation. It is a real question and it is unanswered.

The filed statutory Unit Selling Price band, group by group

These eight rows are the filed statutory Unit Selling Price minima and maxima exactly as the filed KPKT HIMS advertisement brochure prints them, and they are identical to the sen in the KPKT TEDUH register. That exact agreement is itself a finding: on other projects the registry band has turned out to be a splice of two permit generations matching no filed advertisement. Here there is no splice.

Row 1 — 5 storeys, 13 units: RM10,444,845.36 – RM18,445,195.00 · brochure’s own baki 11
Row 2 — 5 storeys, 13 units: RM9,566,340.00 – RM18,966,845.00 · baki 7 — this row holds the project’s floor
Row 3 — 7 storeys, 21 units: RM10,954,639.18 – RM22,091,151.00 · baki 17
Row 4 — 7 storeys, 27 units: RM9,606,649.48 – RM32,798,711.34 · baki 17
Row 5 — 5 storeys, 13 units: RM11,345,877.00 – RM19,189,588.00 · baki 11
Row 6 — 5 storeys, 12 units: RM11,682,857.00 – RM37,585,608.00 · baki 10
Row 7 — 7 storeys, 27 units: RM9,696,752.58 – RM37,300,103.00 · baki 17
Row 8 — 7 storeys, 20 units: RM10,335,773.20 – RM37,751,587.00 · baki 13 — this row holds the project’s ceiling
146 units in total. Overall filed band RM9,566,340.00 – RM37,751,587.00 — that overall band is OUR minimum and maximum across the eight filed rows; the brochure prints no overall figure.

The baki column is a genuine filed disclosure, and an unusual one. It is the brochure’s own balance-remaining count. Summing it gives 103 of 146 units still unsold, i.e. 43 taken up, about 29.5%, as at the brochure’s document date of 17 August 2026 (the sum and the percentage are ours, on a filed disclosure; they will go stale, so they are dated).
The rows are keyed to blocks, not to types. The brochure’s price rows and its block table run in the same order and the same unit counts (13, 13, 21, 27, 13, 12, 27, 20), which makes row 1 = Block A through row 8 = Block H all but certain — but that mapping is our inference from the ordering, not a filed statement, and it is not presented as filed. Because the price rows are keyed to blocks and the built-up schedule to types, with nothing joining them, no honest price per square foot can be computed for any type, and neither the filing nor the register prints one.
One useful honesty check. The published gross development value is RM1.52 billion, which over 146 units averages about RM10.41 million a unit (ours). That sits just above the filed minimum of RM9,566,340.00 — which implies the filed maxima of RM32m to RM37.75m apply to very few units. The top of the band is not representative of the project, and anyone quoting the ceiling as “the price” is misreading it.
This is marketing information. It is not a price list, not a quotation and not an offer. The only price that binds anyone is the one in the price list and the SPA at the sales gallery.

Why the developer’s own website prints different money under the same permit number

This is the most significant contradiction on the project, and it is between two surfaces of the same developer. The developer’s microsite prints an APDL panel on at least four of its pages with the same eight unit groups, the same unit counts and the same storey counts as the filed advertisement and the register — and different money.

Six of its eight minima sit BELOW the filed statutory minimum for the same row, and its absolute floor sits below the filed absolute floor of RM9,566,340.00. None of those figures is reproduced on this page, in any form, and no arithmetic on them is published either. A figure that sits below the filed statutory minimum is not a figure this site will print.
The two tables are not two unrelated price lists. Three of the eight rows are effectively the same numbers, differing only by rounding to the ringgit — the filing prints sen, the website does not. They are two generations of one table.
The most probable explanation, stated as inference and not as fact: the register holds two permits of the same number on the same dates — …0602(A)-(S) marked Aktif and …0602(N)-(S) marked Tidak Aktif — and neither is flagged as the latest. The filed advertisement (document dated 17 August 2026) and the register both carry the active generation; the live website appears still to be serving the superseded one. The direction of travel supports that reading, and so does the fact that the same website still prints a completion date of “December 2029” rather than the filed January 2030. It reads as a stale web page, and nothing in any source says it is anything else.
A second publisher carries a below-floor band too. A weekly magazine feature printed its own single-level and penthouse bands in a pre-launch piece; its single-level floor also sits below the filed statutory minimum, so all of those figures are withheld as well. Counting independently, that is two publishers carrying below-floor figures — the developer itself and one magazine group. Note that theedgemalaysia.com and edgeprop.my share a single publisher, The Edge Communications, so they count as one, not two.
What to do about it. Treat the filed statutory band above as the only band, and verify the current band yourself at teduh.kpkt.gov.my against project 32-16 before relying on anything. Then ask for the official price list and the SPA. The developer gives no explanation for the gap and prints no “as at” date on its own panel, and that unanswered question is recorded here rather than papered over.

The advertising and sales permit: filed as a placeholder, and yet lapse CAN be assessed

The filed brochure prints No. permit iklan dan jualan: xxxxxxxxxxxxx — a literal placeholder. On most projects that ends the enquiry, because a licence validity must never be passed off as a permit validity. This case is different, and favourably so.

First, the placeholder sits next to a printed permit validity: Tempoh sah permit: 25/07/2025 sehingga 24/07/2028. The validity was filed even though the number was not. Second, two independent surfaces recover the real number and both agree with each other and with those dates — the KPKT TEDUH register (permitNo: 32-16/07-2028/0602(A)-(S), permitMula 2025-07-25, permitTamat 2028-07-24) and the developer’s own published APDL block. Third, the permit number’s own internal date, /07-2028/, independently encodes the July 2028 expiry.
Assessment as at 9 October 2026: the developer licence 32/08-2028/1034(A) is current, with about 22.3 months to run; the permit 32-16/07-2028/0602(A)-(S) is current and not lapsed, with about 21.5 months to run and about 14.5 months already elapsed (both ours). That is a positive finding, not a default.
Two cautions. An inactive twin of the permit, 32-16/07-2028/0602(N)-(S), sits in the register’s own history on identical dates and with an identical 36-month period, and neither generation is flagged as the latest — which is the most probable explanation of the price discrepancy above. And the licence suffix is printed three different ways by three surfaces of the same developer: (R) on the filed brochure, (A) in the register, (A) on the developer’s own website. This page publishes the register’s (A) and names the disagreement rather than quietly choosing. A reader who checks only the brochure will not be able to verify the permit number at all, and that is worth telling a client before they try.
Do not confuse the two numbers. The filed document’s own path identifier (P45-20260817-00020202) is a document reference, not a permit number, and the -(S) on the end of the permit is part of the permit number, not a phase index.

Foreign buyers — Kuala Lumpur’s RM1,000,000 floor, and every filed unit clears it

Kuala Lumpur / Wilayah Persekutuan applies a minimum purchase price of RM1,000,000 per unit for a foreign buyer, for both strata and landed property, with State Authority / Economic Planning Unit consent required. The clearest public citation found cites the National Land Code (Revised 2020), Act 828, section 433B for the consent requirement and the Ministry of Economy’s Garis Panduan Perolehan Hartanah, effective 13 July 2022, for the thresholds — but that page links only the general EPU website rather than a specific gazette, so treat RM1,000,000 as the prevailing policy threshold and verify it before advising any client.

The arithmetic here is the mirror image of most projects on this site’s list. The lowest filed statutory price on the whole of EDEN is RM9,566,340.00 and the highest is RM37,751,587.00. Every one of the 146 filed units clears the RM1,000,000 floor — the cheapest by a factor of 9.57 (our arithmetic; the price figures are the filed statutory ones). On most projects covered here not a single unit reaches the floor. Here not a single unit falls below it, and for an overseas Chinese-speaking buyer that is the single most commercially relevant fact on the page.
Clearing the floor is necessary but not sufficient. State Authority / EPU consent is still required and carries a fee — one public source estimates roughly RM10,000, in a range of about RM8,000 to RM12,000. The units are strata (Rumah Pangsa/Kondo), which is the easier category for a foreign buyer than landed title. And this is a second reason the Schedule G / H finding matters: a buyer who believed they were buying a landed villa on an individual title would be reasoning about the harder path, not the one they are actually on.
For reference, the neighbouring state’s thresholds are different again: Selangor Zones 1 and 2 are RM2,000,000, strata and gated landed strata only; Zone 3, meaning Hulu Selangor and Sabak Bernam, is RM1,000,000. Kuala Lumpur, where EDEN is, is RM1,000,000 with EPU consent.

Construction progress, CCC and vacant possession — and why this project is neither late nor early

All eight register component rows read peratus: 20.00, ccc: “-”, vp: “-” and komponen: Lancar, and the development as a whole reads status.keseluruhan: Lancar. There is no filed CCC and no filed vacant possession. So this project cannot be said to have beaten anything, and equally cannot be called late — and the register’s own verdict, on the development and on every one of its eight components, is Lancar, proceeding smoothly. That is a meaningful positive and it belongs next to the extension, not in a separate paragraph.

What the extension changes for a buyer, concretely. Under Schedule H, liquidated damages run at 10% per annum of the purchase price from the day after the delivery period expires. The approved extension moves the date that clock starts from 5 January 2029 to 5 January 2030 — twelve months of liquidated damages that a buyer who signed in January 2026 can no longer claim. On the filed statutory minimum of RM9,566,340.00 that is roughly RM956,634 of foregone liquidated damages over the twelve months (our arithmetic, illustrative; the real figure follows each buyer’s own purchase price). It is disclosed nowhere in the marketing, and it is the single most valuable thing on this page for an existing or prospective purchaser.
But the honest reading is not simply “delay”. The main building contract was only let on 12 June 2026, commencing 15 June 2026 with a 33-month period, which programmes practical completion at about mid-March 2029 — after the original 5 January 2029 date (ours). The first SPA was signed five months before the builder was appointed. On those public dates the original date was arithmetically unreachable from the start, and the extension reads as a re-baselining of a programme that had already moved rather than an excuse invented late. The revised date sits about 9.7 months after the contractor’s programmed completion (ours), which is ordinary headroom for certification, strata and handover.
And credit where it is due: the developer’s own filed brochure already prints the revised date, Tarikh dijangka siap: Januari 2030. On most projects covered here the brochure and the portals still printed the original date long after the amendment. This one disclosed it. Its website, however, has not caught up and still prints “December 2029”.
One thing the register does not tell you. The revised date is keyed to the first SPA. Buyers whose own agreements post-date the amendment may have contracted on the 48-month period from the outset. The register does not disclose which buyers are on which period, and the reason the extension was sought and granted is not published at all. Check it against the individual SPA, every time.

The register’s offence flag against the developer — recorded, not characterised

The KPKT TEDUH developer object for code 32 carries the field mempunyaiKesalahan: “Ada Kesalahan”. That is KPKT’s own field, printed by KPKT, and it is recorded here because it is part of the public record and a buyer is entitled to know it exists.

What the register does NOT say, and this page will not guess at: it does not say what the breach was, which project it attached to, when it was recorded, or whether it has been resolved. This developer code carries sixteen registered projects, so the flag cannot be attributed to EDEN, and nothing in any source suggests it relates to this project. No wrongdoing on this project is implied, stated or hinted at here. If it matters to a client, the particulars have to come from KPKT itself, in writing — and the developer’s own status in the same register reads statusPemaju: Aktif.

What this page does not publish, and why

Louis’s standing instruction, and this site’s hard rule. No discount, no rebate, no nett price, no promotional package, no freebie, no incentive, no commission, no Bumiputera discount percentage, no leaseback or guaranteed-rental rate and no yield or ROI projection appears anywhere on this page, in any language, and none was sought from any sales file. The only price figures here are the filed statutory Unit Selling Price minima and maxima from the legally filed advertisement particulars, which are identical to the sen in the public KPKT register — always labelled as such, and always with the line that they are not a price list, not a quotation and not an offer.

Specifically withheld on this project:
• The developer’s own microsite price table. Six of its eight minima sit below the filed statutory minimum for the same row. None of those figures is printed, and no arithmetic on them is printed. Only the fact of the discrepancy, and that it is carried by two independent publishers — the developer itself and one magazine group, where two sister titles under one publisher count as one.
• A magazine’s pre-launch single-level and penthouse bands, whose single-level floor also sits below the filed statutory minimum.
• The Bumiputera discount field. The filed brochure and the developer’s own APDL panel both carry that field. Its existence is stated here because a buyer should know a Bumiputera price applies on this scheme; its value is not published, and will not be.
• Any price per square foot, because the filed price rows are keyed to blocks and the filed built-up schedule to types, and nothing published joins them. A psf figure here would be arithmetic on two documents that do not meet.

And the separate list — not published by anyone, therefore not on this page: the bebanan or chargee over the land, which is the single field a cautious buyer most wants and which no source prints; the housing development account number and the bank holding it; the land area in any filed document; the mukim, seksyen or PT number; the express condition of the title; whether the strata plan is approved and the share-unit allocation per parcel; whether the 4-to-11 parking bays are accessory parcels or common-property allocations; whether the scheme will have one management corporation or subsidiary ones per block; whether the clubhouse is common property or retained by the developer; the total car-park bay count; which blocks hold the penthouses; any filed built-up area for the 22 penthouses; any mapping of filed price rows to unit types; bedroom and bathroom counts for any penthouse type; ceiling heights, balcony and terrace areas and private-lift provision per type; any floor plan at all; the finishes specification beyond a list of brand names, with no model, allowance, schedule or per-type assignment; whether the penthouses are delivered furnished, fitted to the show-unit standard or bare; solar capacity, rainwater-harvesting capacity, EV-charger count and bicycle-bay count, all claimed and none specified; any GreenRE or GBI certificate number, rating or assessment stage; the architect of record; the developer’s modern 12-digit registration number; whether the RM83 million substructure subcontract sits inside or outside the RM529.319 million main contract; the site postcode; any distance or drive time to any named place; and the nearest rail station, which not one source names.
Every one of those is a question Louis will put to the developer in writing on a client’s behalf. None of them is filled in here with a plausible guess.

Licensed developer

BRDB Developments Sdn Bhd — the licensee is the brand, and there is no SPV

The licensed housing developer of RESIDENSI EDEN is BRDB Developments Sdn Bhd (5521-A), which the KPKT register writes as BRDB DEVELOPMENTS SDN. BHD. under developer code 32 — a two-digit code, which is itself unusual and a small clue to how long this company has been licensed. Its registered and business addresses in the register are identical: Level 11, Menara BRDB, 285 Jalan Maarof, Bukit Bandaraya, 59000 Kuala Lumpur. Register status statusPemaju: Aktif, with 16 registered projects under the code.

The finding here is that there is nothing to unmask. On most projects covered on this site the brand on the hoarding and the licensee on the filing are different companies — a project special-purpose vehicle whose name a buyer has never heard. Here the licensee IS the brand. Eleven independent surfaces — the filed brochure, the KPKT register, the project microsite, the corporate site, both Bursa-reported contract announcements, the quantity surveyor’s record and four publications — all name BRDB Developments Sdn Bhd and nothing else. No project SPV exists on this development, and that is worth one plain line in a series where SPVs are the norm.

Lineage, and what we could not establish. The company’s predecessor was the Bursa-listed Bandar Raya Developments Berhad, taken private in 2013. 5521-A is an old-format Companies-Registry number (pre-2019 format), and the modern 12-digit equivalent for this company was not recovered from any public source checked, so no 12-digit number is published here. The register itself prints emel: “-” and alamat_web: null for this developer, and three surfaces give three different telephone sets: 03-2688 2888 on the filed brochure, 0124859917 as the register’s only number with telefon: null, and +603 2688 2888 plus a separate sales-gallery line on the microsite.

No joint venture and no landowner arrangement is disclosed in any filing, announcement or report. The Edge Weekly and The Star both record that BRDB acquired the land in 1997 — a long-held own-balance-sheet landbank rather than a JV. The board as published comprises Dato’ Sri Akbar Khan (Chairman), Datin Sri Camelia Khan (Deputy Chairman), Christopher Manivannan, Lim Suat Chui, Mohamed Nazim Khan Bin Mahmud Khan, Yasmin Farah Khan and Imran Zane Khan Bin Akbar Khan. The officers quoted on this project are Christopher Manivannan (Group CEO) and Yasmin Farah Khan and Nazim Khan (co-deputy CEOs).

The construction chain is unusually well documented, because two contracts were Bursa-reported. Main building works went to Kerjaya Prospek (M) Sdn Bhd for RM529,319,000 on a fixed lump sum, letter of award 12 June 2026, commencing 15 June 2026, completion within 33 months, for 8 blocks of villa residences (146 units), 2 blocks of car parks, 2 levels of basement parking, common amenities and a clubhouse at Lot 480191, Jalan Gallagher. Earthworks, retaining structure, piling and road deck went to Econpile (M) Sdn Bhd for RM83 million, announced 14 March 2024, over 18 months from 1 March 2024. Those two announcements are the only sources that give the lot number, and the only independent confirmation of the 146-unit, eight-block form outside the KPKT filing — which is also what disproves the 168-unit figure one magazine printed. Neither announcement says whether the RM83m subcontract sits inside or outside the RM529.319m main contract, so they must not be assumed to add up. For orientation only: RM529,319,000 over 146 units is about RM3.63 million of main building works a unit, and if the two sums were additive, about RM4.19 million — roughly 40.3% of the published RM1.52 billion gross development value (all four figures ours, on published contract sums; a public lump-sum construction contract is not a price, a margin or a cost to a buyer).

Awards: EDEN has none, and every award traceable to this developer is corporate or belongs to a different project. The 2026 Edge Malaysia Responsible Developer award and the Hall of Fame induction are corporate recognitions of the company, and the source for both is the developer’s own paid advertorial. “Award-winning” in that advertorial refers to One Menerung, a different, completed project. Nine award badges on the corporate site are corporate or tagged to Tamansari and The Pulse, the newest dated 2023 — and EDEN was unveiled in Q1 2026, so no award cycle has yet looked at it. Every “award-winning” formulation applied to EDEN is refused here.

Green: no rating, not even a provisional one — and there is a live borrowing trap. All four GreenRE rating tiers were read separately. No EDEN, Residensi Eden or Taman Duta row appears in any of them. The only BRDB-branded row in the entire register is “BRDB Semenyih”, developer Pentagon Victory Sdn Bhd, Bronze RES v3.3, provisional, 26 July 2024 — a different project, a different district and a different licensee, which does not hold developer code 32. Anyone searching the register for “BRDB” will find that row, and it must not be attached to EDEN. It is refused here. The green claim actually made — that the development is “aligned with GreenRE Gold standards” — is reported by a magazine, not by the developer and not by GreenRE, and “aligned with” is a design target, not a certification and not even a provisional certification. No GBI record was found either, but the GBI directory itself is unreachable, so that is inconclusive and never a negative. Ask the developer for a certificate number and a status, and do not accept a logo without both.

Sibling projects, kept off this page on purpose. The same licence serial carries at least sixteen schemes, so the licence number is not a project identifier for this developer. Residensi Menerung 111 (register 32-15, 111 units, Bangsar) and Serai Bukit Bandaraya (32-14, 121 units, 21 storeys, Bangsar) are separate filings with their own coordinates, their own permits and their own figures. Not one number or image from either appears anywhere on this page, and nor does anything from the completed One Menerung, whose name is similar enough to Residensi Menerung 111 to be a hazard inside the developer’s own portfolio. There is also no filed phase 2: the register caps this developer at 16 projects, 32-17 does not exist, and all 146 units sit in the single record 32-16. The construction register’s “(PHASE 1)” label is a construction-package label, and no phase 2 is promised here.

The developer’s own published words, for the record and labelled as marketing: “Kuala Lumpur’s most exclusive address”, “the ultimate historic address”, “prestigious Parliament precinct”, “five-star facilities”, “a hilltop enclave of freehold residences”, “only 22 limited edition penthouses”. None of the superlatives has primary support, and there is no five-star rating system for residential amenities — note the irony that the developer’s own facilities page itemises nothing. The 22 penthouses count, by contrast, is corroborated by three sources; it is “limited edition” that is marketing. The filed brochure’s own Malay taglines are Gayahidup Kontemporari Diselubungi Kehijauan Alami and Enklaf Puncak Bukit di Taman Duta Yang Berprestij Suasana Resort Mewah. The Group CEO’s quoted reason for calling the land “very rare” — that most land near the city centre carries a commercial rather than a residential express condition — is on the record as reasoning, and the filed title is freehold with no restriction in interest; but no register, gazette or land-supply study was produced, so “rare” remains an assertion. One further claim is refused outright: the brand list — Poggenpohl, Gaggenau, Molteni&C, Villeroy & Boch, Hansgrohe, Bosch, Poliform and others — is a list of suppliers, not a project credential, and the published claims about those brands’ own histories are the brands’ claims, repeated.

Questions a buyer actually asks

EDEN Taman Duta — frequently asked questions

Is EDEN Taman Duta a landed villa development or a condominium?
KPKT files it as a condominium. The register prints Rumah Pangsa/Kondo on all eight component rows, the filed advertisement prints Jenis perumahan: Kondominium, and the sale contract is filed as Jadual H — the statutory contract for a subdivided, strata development. There are 146 strata parcels in eight blocks of three to seven storeys. The word “villa” is used by the main contractor’s Bursa announcement, the quantity surveyor, the construction register’s category and three newspapers, and “Resident’s Villa” and “Penthouse” are the developer’s names for unit TYPES. As a description of the product — single-level homes of 5,296 to 6,491 sq ft with their own drop-off — “villa” is fair. As a description of the tenure or the contract it is wrong, and that is the most important thing on this page.
So what actually changes, between Schedule G and Schedule H?
Six things that cost or protect money. What is sold: Schedule G sells land and building on an individual title; Schedule H sells a strata parcel with a share of common property. The delivery clock: 24 months under G, 36 under H — and here extended to 48. Progress payments: a different ladder, with 5% retained against defects under H. Late delivery: 10% per annum under both, but computed from the longer H date, which on EDEN is now 5 January 2030. Running cost: H makes a management corporation, a service charge and a sinking fund mandatory; the only published rate here is a magazine-reported estimate of 70 sen per square foot including sinking fund. Foreign buyers: strata under H is the easier category. Defect liability is 24 months from vacant possession under both.
Can a foreigner buy at EDEN Taman Duta?
Yes, and this is the clearest yes of any project on this site’s Kuala Lumpur list. Kuala Lumpur / Wilayah Persekutuan applies a RM1,000,000 minimum purchase price per unit, with State Authority / EPU consent. The lowest filed statutory price on the entire project is RM9,566,340.00 — 9.57 times the floor (our arithmetic on the filed figures) — and the highest is RM37,751,587.00. Every one of the 146 filed units clears the threshold, the cheapest by more than nine times. The floor is simply not a constraint here. Consent is still required and carries a fee, commonly estimated at roughly RM10,000, and the units being strata puts them in the easier category. Verify the prevailing threshold before you advise a client — policy thresholds change.
What is the price, and why will you not print the developer’s own figures?
The filed statutory Unit Selling Price band is RM9,566,340.00 to RM37,751,587.00 across the eight filed unit groups, taken from the legally filed KPKT advertisement particulars and identical to the sen in the public KPKT register. That exact agreement is a good sign and is itself a finding. The developer’s own website prints a different set of figures under the same permit number, and six of its eight minima sit BELOW the filed statutory minimum for the same row. This site does not publish a figure that sits below a filed statutory minimum, so none of them is here — only the fact that the discrepancy exists, and that it is carried by two independent publishers (the developer itself, and one magazine group whose two sister titles count as one publisher). The likeliest explanation is a stale web page serving the superseded permit generation. Ask for the official price list and the sale and purchase agreement, and verify the band at teduh.kpkt.gov.my against project 32-16. This is marketing information. It is not a price list, not a quotation and not an offer. The only price that binds anyone is the one in the price list and the SPA at the sales gallery.
Is the project late? There is a 12-month extension in the register.
It can be called neither late nor early, and the extension is disclosed rather than buried. The register prints pindaanTempohSerahKosong: Ya and tempohTambahanDiluluskan: 12 Bulan, taking the construction period from 36 to 48 months and vacant possession from 5 January 2029 to 5 January 2030. There is no filed CCC and no filed vacant possession, construction progress is 20.00%, and the register’s own verdict on the development and on all eight components is Lancar — proceeding smoothly. Two things make this unusually fair: the developer’s own filed brochure already prints the revised date (Januari 2030), and the original date was arithmetically unreachable from the start — the main building contract was only let on 12 June 2026 with a 33-month period, programming completion at about mid-March 2029 (ours). The extension reads as a re-baselining, not a slip.
What does the extension cost a buyer in practice?
Twelve months of liquidated damages they can no longer claim. Under Schedule H, liquidated damages run at 10% per annum of the purchase price from the day after the delivery period expires. Moving that date from 5 January 2029 to 5 January 2030 removes twelve months from the claim. On the filed statutory minimum of RM9,566,340.00 that is roughly RM956,634 (our arithmetic, illustrative only; the real figure follows each buyer’s own purchase price). Nothing in the marketing discloses this. And note that the revised date is keyed to the first sale and purchase agreement — buyers who signed after the amendment may have contracted on the 48-month period from the outset, and the register does not say which buyers are on which period. Check the individual agreement.
Which completion date should I believe?
5 January 2030. Five dates are in public circulation and only two of them are statutory. 5 Jan 2030 is the revised filed vacant-possession date in the KPKT register; Januari 2030 is the filed brochure’s own expected-completion date, and the two statutory sources agree. The other three are not statutory and are each wrong in a different way: the developer’s live website still prints “December 2029”, which is neither the original nor the revised filed date; Tatler Asia prints 2028, in an article that also prints two figures we have refused; and the quantity surveyor’s record says “anticipated completion 2027”, which the contractor’s own 33-month programme makes impossible. The superseded original filed date was 5 January 2029.
Is the advertising and sales permit current?
Yes — and unusually, that can actually be established here. The filed brochure prints the permit number as a literal xxxxxxxxxxxxx placeholder, which normally ends the enquiry. But it prints the permit validity next to it, and two independent surfaces recover the number and agree: the KPKT register and the developer’s own published APDL block both give 32-16/07-2028/0602(A)-(S), valid 25 July 2025 to 24 July 2028. As at 9 October 2026 it is current, with about 21.5 months to run (ours). Two cautions: an inactive twin, 32-16/07-2028/0602(N)-(S), sits in the register history on identical dates with neither generation flagged as the latest; and the developer licence suffix is printed three different ways by three surfaces of the same developer — (R) on the filed brochure, (A) in the register and (A) on the developer’s website. This page publishes the register’s (A).
Is the land freehold?
Yes — Hakmilik Kekal, filed, with land restrictions filed as Tiada (none). The filed brochure, the developer’s own APDL panel and the developer’s website all say freehold, and there is no lease expiry to worry about. The Group CEO’s quoted reason for calling residential freehold land this close to the city centre “very rare” — that most nearby land carries a commercial express condition — is on the record as reasoning; no register or land-supply study was produced for it. What nobody publishes is the bebanan, the charge over the land. Neither the brochure, nor the register, nor the developer prints whether the title is charged, or to whom. On a freehold scheme of this value that is one of the more serious omissions in the public record.
How many units, and is Tatler’s 168 right?
146. The 168 figure is wrong. Tatler Asia prints “168 units (22 exclusive duplex penthouses plus 146 other units)” — it has added the penthouses to a total that already contains them. 146 is the filed register figure, the filed brochure’s block-table sum, the figure in both Bursa-reported contract announcements and the figure in the quantity surveyor’s record. Five sources against one. The same Tatler article also prints “12.25 hectares” for the developer’s 12.25 acres, overstating the site by about 2.47 times, and gives a 2028 completion. Both figures are refused here.
How big is the site, and what is the density?
12.25 acres — about 4.95 hectares — and 11.92 units per acre (our arithmetic: 146 ÷ 12.25). That is the lowest density of any project on this site’s Kuala Lumpur list, and it is the one place where the marketing’s exclusivity framing is arithmetically earned. Label the acreage honestly: it is the group CEO’s own stated figure in a named interview, repeated in the same article and corroborated by The Star as “4.95ha (12.25 acres)” — it is not a filed figure, and no KPKT document prints a land area at all. Equivalently about 29.5 units per hectare, a site of about 533,610 sq ft, and about 3,655 sq ft of site per unit (all ours). Two traps would destroy this calculation: one magazine prints 12.25 hectares, and the quantity surveyor’s “Area 1,515,000 sq ft” is 2.84 times the site and is almost certainly a gross floor area mislabelled “Area” — which, if so, would imply a plot ratio of about 2.84 (ours, and not published as a fact). Neither is used as a denominator here.
What are the unit sizes?
Two answers, because the filed and the marketed schedules are different documents. As filed, three types only: A-1 5,522–5,533 sq ft, A-2 5,296–5,307 sq ft and C 6,491 sq ft, each with 4 + 2 bedrooms and five bathrooms plus a powder room. As marketed, five types: Resident’s Villa A 5,296–5,533, Villa C 6,491, Penthouse A 9,182–9,192, Penthouse C 11,141 and Penthouse D 18,998–19,041 sq ft. So the filed statutory schedule omits all 22 penthouses entirely — 15.07% of the units have no filed built-up area (ours) — and the marketed ceiling is 2.93 times the filed ceiling (ours). The register carries no built-up area for this project at all: keluasan: “0 mps”. And there is no Type B anywhere, although the blocks run A to H. Nobody explains that.
Does 4 + 2 mean six bedrooms?
No. 4 + 2 is the Malaysian filing convention for four bedrooms plus two utility or helper rooms — six rooms in total, which is exactly what the register reports as bilik: “6, 7”. Five bathrooms plus a bilik serbuk (powder room) makes six, matching bilikAir. The register’s upper value of 7 has no counterpart in the filed schedule and must belong to the penthouses, which the filed schedule does not describe — consistent with one magazine’s description of a show unit with seven bathrooms plus a guest toilet. Separately: the developer’s own website publishes no bedroom and no bathroom count for any type, on a product whose filed minimum is RM9,566,340.00.
What facilities are there, and who says so?
Read the attribution carefully, because the developer itself itemises almost nothing. Its facilities page carries no bulleted list and no table: it names one facility in page text, The Eden Club, and three more only inside image alt text — Garden Pavilion, Active Pavilion and Wellness Pavilion. Its 13-image gallery names no facility at all. Every specific amenity — gym, pools, tennis court, pickleball, creche, sauna, Jacuzzi, concierge — comes from The Edge Weekly, a magazine, and from nowhere else. EdgeProp publishes a shorter and partly different list which uniquely adds a “main front court”, a “spa deck”, a “health park” and a “rooftop garden” — the rooftop garden appears on no other surface and is not promised here. No source assigns any facility to a level or a floor. The one hard fact is contractual: a dedicated clubhouse block is inside the main building contract’s scope, and the quantity surveyor counts it among eleven blocks.
How far is it to KLCC, and which rail station is nearest?
Nobody publishes either figure, and that is the honest answer. No source — not the developer, not The Edge, not The Star, not EdgeProp, not Tatler — publishes a single distance, a radius or a drive time to any named place for this project, and no source names a single rail station. The developer’s own location page carries four category headings and not one place name in its text; the place names and any distances live only inside a raster map image, and no figure has been read off that image into the text of this page. Four sources do name landmarks — KLCC, Merdeka 118, TRX, KL Sentral, Bangsar Shopping Centre, MATRADE, Parliament House, Istana Negara, KL Tower, six international schools and three hospitals — with no distance attached to any of them. One road is confirmed by three independent sources: access is via Jalan Gallagher. Nothing has been estimated to fill the gap. Ask Louis and he will put the question to the developer in writing.
Is EDEN green-certified, and has it won anything?
No to both. All four GreenRE rating tiers were read separately and no entry for this project appears in the reachable portion of the Platinum, Gold, Silver or Bronze registers; no GBI record was found either, but GBI’s own directory is unreachable, which proves nothing in either direction. The published claim is that the development is “aligned with GreenRE Gold standards” — reported by a magazine, not by the developer and not by GreenRE, and “aligned with” is a design target, not a certification and not even a provisional one. There is a live trap: the only BRDB-branded row in the whole GreenRE register is “BRDB Semenyih”, licensed to Pentagon Victory Sdn Bhd, a different project in a different district under a different licensee. It is not EDEN and it is refused here. On awards: EDEN has won nothing. The developer’s 2026 awards are corporate, “award-winning” in its own advertorial refers to a different completed project, and the newest badge on its corporate site is dated 2023 — EDEN was unveiled in Q1 2026. Ask for a certificate number and a status; do not accept a logo.
The register flags the developer with Ada Kesalahan. What is that?
It is a KPKT field, it exists, and the register gives no particulars whatsoever. The developer object for code 32 carries mempunyaiKesalahan: “Ada Kesalahan”. The register does not say what the breach was, which project it attached to, when it was recorded, or whether it is resolved. This developer code carries sixteen registered projects, so the flag cannot be attributed to EDEN, and nothing in any source connects it to this development. No wrongdoing on this project is implied here. It is recorded because it is public, and because a buyer is entitled to know the field exists and that its substance is not published. The same register records the developer’s status as Aktif. If it matters, the particulars must come from KPKT in writing.
Who is the licensed developer, and is there a project SPV behind it?
BRDB Developments Sdn Bhd (5521-A), KPKT developer code 32 — and there is no SPV. This is unusual. On most projects covered here the brand on the hoarding and the licensee on the filing are different companies. Here eleven independent surfaces — the filed brochure, the register, the microsite, the corporate site, both Bursa-reported contract announcements, the quantity surveyor’s record and four publications — name the same single company. The predecessor was the Bursa-listed Bandar Raya Developments Berhad, taken private in 2013; 5521-A is an old-format registration number and the modern 12-digit equivalent was not recovered from any public source, so none is published here. The land was acquired outright in 1997, and no joint venture, landowner arrangement or profit share is disclosed anywhere.
What is the service charge going to be?
Nobody has filed or contracted a figure. The only published rate is an estimate of 70 sen per square foot including the sinking fund, reported by The Edge Weekly — a developer estimate repeated by a magazine, not a filed, contractual or management-corporation-approved figure. On that estimate a 5,296 sq ft Villa A would run about RM3,707 a month, a 6,491 sq ft Type C about RM4,544, and a 19,041 sq ft Penthouse D about RM13,329 (all three ours, on a magazine’s estimate — illustrations, not quotations). Two linked questions are also unanswered: whether the scheme will have one management corporation across all eight blocks and the clubhouse or subsidiary corporations per block, and whether the four-to-eleven parking bays per unit are accessory parcels or common-property allocations — which decides the share units and therefore how the charge is apportioned. Ask for both in writing before signing.
Are you sure this is the right “Eden”? The name is common.
Identity is confirmed four independent ways, and not one of them is the name. (1) The KPKT register record 32-16 files coordinates 3.157199 N, 101.674417 E in Daerah Kuala Lumpur, Negeri WP Kuala Lumpur; (2) the licensee is BRDB Developments Sdn Bhd under developer code 32; (3) the site is Lot 480191, formerly Lots 765, 766, 767 and 768, on Jalan Gallagher, Taman Duta, Bukit Tunku, printed independently in the Bursa-reported contract announcement and in the quantity surveyor’s record, both of which also give 146 units in 8 blocks; and (4) the DBKL building-plan approval reference BP T2 OSC 2025 0384. Every record used on this page matched on at least two of those four. Explicitly checked and excluded as different projects: Eden Heights in Kota Kinabalu, Sabah (a different developer, leasehold, 180 units in one 16-storey block, completed 1999); Eden at Botanica CT in Penang; and — the real hazard — a TA Enterprise Bhd private bungalow job in the same Taman Duta streets, which is a genuinely Schedule G landed scheme by a different developer. Nothing from any of them is on this page. So are the developer’s own siblings, Residensi Menerung 111 and Serai Bukit Bandaraya, both in Bangsar.
What would you ask the developer before signing?
Eight things, in this order. (1) The bebanan — is the title charged, and to whom. (2) The housing development account number and the bank. (3) Whether the strata plan is approved, and the share-unit allocation for your parcel. (4) Whether your parking bays are accessory parcels or common-property allocations — it changes your service charge and your resale package. (5) One management corporation or subsidiary ones per block, and whether the clubhouse is common property or retained by the developer. (6) Which delivery period your own agreement is on, 36 months or 48, and the date your liquidated-damages clock actually starts. (7) A filed built-up area for your unit if it is a penthouse — the filed statutory schedule describes none of the 22. (8) The current official price list, dated, and a written explanation of why the developer’s own website prints a different band from its own filing. Louis will put all eight in writing for you.

Get the filed documents, not a web page

Louis will send you the filed KPKT advertisement brochure, the current official price list, the Schedule H sale and purchase agreement and the register extract for project 32-16, and will put the unanswered questions on this page to the developer in writing. Nothing on this page is a quotation and nothing here nets off anything.

This is marketing information. It is not a price list, not a quotation and not an offer. The only price that binds anyone is the one in the price list and the SPA at the sales gallery.

Louis Koh

Director, LK Group Marketing · IQI Realty Sdn Bhd · Registered Estate Agency

Over a decade selling Malaysian property to local and overseas buyers, across Kuala Lumpur, Selangor and Johor Bahru. The pages on this site are built from the KPKT TEDUH public register, the filed KPKT HIMS advertisement particulars, Bursa-reported contract announcements and named publications — and where a developer’s own two documents disagree, both appear. Ask for the filing, the price list and the sale and purchase agreement, and ask for the questions this page says nobody answers.

WhatsApp Louis about EDEN Taman Duta

Published 9 October 2026 · Last verified 9 October 2026 against KPKT TEDUH project 32-16, the filed KPKT HIMS advertisement brochure, the Bursa-reported Kerjaya Prospek and Econpile contract announcements, the project quantity surveyor’s record and the developer’s own published surfaces. This is marketing information, not an offer. Filed particulars change — verify at teduh.kpkt.gov.my before you rely on anything here.

EDEN Taman Duta146 freehold strata units · 8 blocks, 3–7 storeys · Schedule H · filed band RM9.57m–RM37.75m
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: BRDB (8 developments on this site)

Where it is: Taman Duta, Kuala Lumpur (KL)

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

32-16 · RESIDENSI EDEN

Overall status: Lancar — on schedule

Certified completion by componentRumah Pangsa/Kondo – 13 units20.00%Rumah Pangsa/Kondo – 13 units20.00%Rumah Pangsa/Kondo – 21 units20.00%Rumah Pangsa/Kondo – 27 units20.00%Rumah Pangsa/Kondo – 13 units20.00%Rumah Pangsa/Kondo – 12 units20.00%Rumah Pangsa/Kondo – 27 units20.00%Rumah Pangsa/Kondo – 20 units20.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
5 storeys
Lancar
6 / 6, 7—13RM10,444,845.36
– RM18,445,195.00
20.00%
Rumah Pangsa/Kondo
5 storeys
Lancar
6 / 6, 7—13RM9,566,340.00
– RM18,966,845.00
20.00%
Rumah Pangsa/Kondo
7 storeys
Lancar
6 / 6, 7—21RM10,954,639.18
– RM22,091,151.00
20.00%
Rumah Pangsa/Kondo
7 storeys
Lancar
6, 7 / 6, 7—27RM9,606,649.48
– RM32,798,711.34
20.00%
Rumah Pangsa/Kondo
5 storeys
Lancar
6 / 6, 7—13RM11,345,877.00
– RM19,189,588.00
20.00%
Rumah Pangsa/Kondo
5 storeys
Lancar
6, 7 / 6, 7—12RM11,682,857.00
– RM37,585,608.00
20.00%
Rumah Pangsa/Kondo
7 storeys
Lancar
6, 7 / 6, 7—27RM9,696,752.58
– RM37,300,103.00
20.00%
Rumah Pangsa/Kondo
7 storeys
Lancar
6, 7 / 6, 7—20RM10,335,773.20
– RM37,751,587.00
20.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-23, project code 32-16. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.