One 25-storey block of 230 freehold apartments, 91 m from the same developer’s completed D’Starlingtton — every home 700 sq ft with three bedrooms, and the building already 93.89% built. The permit price sits below Penang Island’s floor for non-citizens, so foreigners cannot buy here.

Freehold230 units700 sq ft · 3 bed 2 bath93.89% built

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

230homes in one block
700sq ft, every unit
2.9 kmto Penang International Airport
D'Tiara apartment block in Teluk Kumbar, Penang — official building image from the developer, GSD Land
D’Tiara · official building image from the developer
D'Tiara location map published by the developer, Teluk Kumbar, south-west Penang Island
The developer’s own location map
Answer block

D'Tiara @ Teluk Kumbar, Penang at a glance

Every figure below comes from the developer’s own published material or the government register. Where neither has published something, it isn’t on this page.

Development
D’TiaraA GSD Land project · licence held by Wisma Dayamas Sdn Bhd
Where it is
Teluk Kumbar, Penang IslandDaerah Barat Daya (South-West District), 91 m from D’Starlingtton
Tenure
FreeholdStated as ‘hakmilik kekal’ on the developer’s advertisement filed with the register
Building
1 block · 25 storeysHomes on 18 floors, Level 7 to Level 23A
Units
23013 homes a floor on 17 floors, 9 on the top residential floor
Layouts
700 sq ft · 3 bed 2 bathTypes A, B, C and D — four variants, one size
Facilities
Levels 5, 6 and rooftopGymnasium, sauna, co-working space, rooftop herb garden and yoga deck
Completion
Expected December 2026The developer’s stated date · register shows 93.89% built, on track
Government permit
30125-2/02-2027/0130(A)-(S)Valid 6 Feb 2024 to 5 Feb 2027
Foreign buyers
Not open to foreignersThe whole permit band is below Penang Island’s RM1,000,000 strata floor for non-citizens
Why this address

Six things about D’Tiara worth knowing before you enquire

Four are reasons a Penang buyer would shortlist it. Two are things to settle first. All six come from GSD Land’s own material or the government register.

📜

Freehold, on the island

The developer’s advertisement filed with the housing register states ‘hakmilik kekal’ — a freehold title. For an entry-level apartment on Penang Island that matters: there is no lease running down in the background when you sell or refinance twenty years from now.

🏗️

It is almost a finished building

The register’s latest return puts D’Tiara at 93.89% built and ‘lancar’ (on track), with the developer’s own expected completion in December 2026. You are judging a real structure you can drive past, not a model in a gallery.

📐

One size for everyone: 700 sq ft, three bedrooms

All 230 homes are 700 sq ft with three bedrooms and two bathrooms. Types A to D are variants of the same size, so choosing comes down to floor and position rather than paying more for extra space.

✈️

Built for the Bayan Lepas working week

Straight-line, the airport is 2.9 km away and the Bayan Lepas industrial zone (FIZ Phase 4) is 5.1 km. For a household with one or two people working in the industrial zone or at the airport, that is the whole argument for Teluk Kumbar.

🚫

Malaysians only — and ask about the conditions

The permit records one figure, RM300,000, as both the minimum and maximum for all 230 units. That is far below the island’s floor for non-citizens, and a single uniform price is the pattern of a price-controlled scheme. Ask me which eligibility and resale conditions apply before you plan around it.

🔎

Several basics are not published

Neither GSD Land’s page nor the advertisement it filed with the register states the land area, the car park allocation or the monthly charges. With 13 homes on a floor, lift waiting and corridor length are worth checking on site too. I will get the missing answers in writing.

Project DNA

The whole development, decoded

Every number here is the developer’s own or the government register’s.

230Units
1Block
25Storeys
700Sq ft, every unit

Facilities, level by level

As listed on GSD Land’s project page and on the advertisement the developer filed with the register.

Podium facilities

Levels 5 & 6
  • Children’s playground
  • Kids’ cycling corner
  • Camping corner
  • Jogging track
  • Outdoor exercise corner
  • Reflexology corner
  • Soft exercise lawn
  • Viewing lounge
  • Chilling corner
  • Reading room
  • Community room
  • Co-working space
  • Gymnasium
  • Games room
  • Zumba / dance room
  • Kids’ centre
  • Sauna

Rooftop

Level 25
  • Herb garden
  • BBQ corner
  • Seating corner
  • Yoga / tai chi deck
  • Meditation deck

Where the project is now

6 Feb 2024Advertising permit issued · valid to 5 Feb 2027
13 Dec 2025Date of the first sale and purchase agreement as recorded on the register
Oct 2026Register shows 93.89% built and ‘on track’ (latest 7(f) return)
Dec 2026Expected completion stated on the developer’s advertisement
13 Dec 2028Latest delivery date under the first agreement — 36 months, Schedule H
Layouts

All 4 D'Tiara @ Teluk Kumbar, Penang floor plans

Four type letters, one size. The developer’s filed advertisement lists Types A, B, C and D at 700 sq ft each; the drawings for Types A and B come from its project page, and those for Types C and D from the advertisement it filed with the government register.

D'Tiara Type A floor plan — 700 sq ft, three bedrooms and two bathrooms, Teluk Kumbar, Penang

Type A — 700 sq ft

About 65 sqm · three bedrooms, two bathrooms · units 2 to 6 on the developer’s master layout plan · drawing from the developer’s project page

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
D'Tiara Type B floor plan — 700 sq ft, three bedrooms and two bathrooms, Teluk Kumbar, Penang

Type B — 700 sq ft

About 65 sqm · three bedrooms, two bathrooms · units 7 to 12 on the developer’s master layout plan · drawing from the developer’s project page

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
D'Tiara Type C floor plan — 700 sq ft, three bedrooms and two bathrooms, from the developer's advertisement filed with the government register, Teluk Kumbar, Penang

Type C — 700 sq ft

About 65 sqm · three bedrooms, two bathrooms · the end home numbered 12A on the developer’s master layout plan · drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
D'Tiara Type D floor plan — 700 sq ft, three bedrooms and two bathrooms, from the developer's advertisement filed with the government register, Teluk Kumbar, Penang

Type D — 700 sq ft

About 65 sqm · three bedrooms, two bathrooms · the end home numbered 1 on the developer’s master layout plan · drawing from the developer’s advertisement filed with the government register

🛏 3 Bed🛁 2 BathOfficial drawing
Get this floor plan
Location & connectivity

Where D'Tiara @ Teluk Kumbar, Penang sits

Teluk Kumbar, in Daerah Barat Daya (the South-West District) on the south coast of Penang Island — 2.9 km in a straight line from the airport terminal and 91 m from D’Starlingtton, the same licensee’s completed project.

Open in Google Maps →
📍 5.289327, 100.25011911920 Bayan Lepas

Pinned to the coordinates filed with the national housing register for project 30125-2, not to a neighbouring landmark. Distances are straight-line from that point.

What the map does not tell you. Straight-line distances flatter the south coast: Teluk Kumbar is reached by the coastal road past the airport, and the peak-hour drive to the industrial zone is what you will actually live with. Being 2.9 km from the terminal also means aircraft are part of the soundscape. Drive the route at 7.30 am and stand on site for half an hour before you commit.
  • D’Starlingtton (same licensee, completed)91 mstraight-line
  • SMK Telok Kumbar1.0 kmstraight-line
  • Teluk Kumbar weekly night market2.0 kmstraight-line
  • Penang International Airport2.9 kmstraight-line
  • Pantai Hospital Penang5.0 kmstraight-line
  • Bayan Lepas industrial zone, FIZ Phase 45.1 kmstraight-line
  • Second Penang Bridge7.3 kmstraight-line
  • Queensbay Mall8.0 kmstraight-line
  • KOMTAR, George Town16.5 kmstraight-line
The government record

On the government register it is project 30125-2 — 230 units at 93.89% built

The housing developer’s licence is held by Wisma Dayamas Sdn Bhd (30125), the company GSD Land uses for its Teluk Kumbar sites. It has two projects on the national register: D’Starlingtton (filed as Casa Teluk Kumbar, 30125-1) and D’Tiara (30125-2).

Project codeRegistered nameAdvertising permitPermit expiresUnitsBed / bathStatus
30125-2D’Tiara — flats / condominium, 25 storeys30125-2/02-2027/0130(A)-(S)5 Feb 20272303 / 293.89% built · on track

Swipe sideways to see the full table →

How to run this check yourself — the seven status words, why searching by marketing name fails, and the register status of all 175 developments on this site →

Read from teduh.kpkt.gov.my on 2 October 2026. Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=30125-2

230 units on the register, 230 on the developer’s advertisement

The register files D’Tiara as one component of 230 flats / condominium units in a 25-storey building, each with three bedrooms and two bathrooms. Its unit list runs from Level 7 to Level 23A: 13 homes on each of 17 floors and 9 on the top residential floor, which adds up to 230 — the same total printed on the developer’s advertisement. On the day I read it, 202 units were recorded as sold and 28 as not yet sold.

What the permit band tells you — and why foreigners are out

The advertising permit records RM300,000 as both the minimum and the maximum for all 230 units. That is the band on the advertising permit, not the price of any unit. Penang Island’s floor for a non-citizen buying strata property is RM1,000,000, so the whole band is below it and D’Tiara is not open to foreign buyers. A single uniform figure across an entire block is also what a price-controlled scheme looks like; if state eligibility rules apply, they will be in the sale documents, and I will check them for you.

Schedule H, 36 months, no extension on record

The sale and purchase agreement is Schedule H (strata), with the standard 36-month delivery period and no approved extension recorded. The register shows the first agreement dated 13 December 2025, which puts the latest delivery date under that agreement at 13 December 2028. Your own clock runs 36 months from the date of your agreement.

93.89% built, certificate still to come

The latest 7(f) return reports the block at 93.89% complete and ‘lancar’ (on track). The certificate of completion and compliance and vacant possession are not yet recorded. The developer’s advertisement gives December 2026 as the expected completion date — a target, not a contractual promise.

Track record

About GSD Land

GSD Land is a Penang developer whose own website lists projects on both sides of the channel: Summerton Bayan Indah, Sierra Residences, Gardens Ville, Skycube Residence, G’Vinton and D’Hazelton on the island, and Sunrich, Alma Signature, Bertam Signature and D’Aleena on the mainland, among others.

In Teluk Kumbar it builds through Wisma Dayamas Sdn Bhd. That company’s first project, D’Starlingtton, stands 91 m from the D’Tiara site: 820 units in a 29-storey building on the register, shown as completed with its certificate of completion and compliance dated 21 May 2026. D’Tiara is the smaller second act on the neighbouring plot — 230 units, one block.

The developer describes D’Tiara as modern, comfortable living in the quiet of Teluk Kumbar, aimed at first-time owners and young families. The advertisement filed with the register also notes that the land is charged to AmBank (M) Berhad, which is normal project financing; your solicitor will deal with the redemption statement at signing.

One honest note on track record: the register shows D’Starlingtton’s delivery period was extended, with approval, from 36 to 48 months. It was finished, but later than the original schedule. D’Tiara has no extension on record and is nearly built, yet that history is the reason to read the delivery and late-payment clauses of your agreement carefully instead of relying on the brochure date.

Straight answers

Frequently asked questions

How many units are there at D’Tiara?

230 apartments in a single 25-storey block. The developer’s advertisement and the government register give the same total.

Homes sit on 18 floors from Level 7 to Level 23A — 13 on each of 17 floors and 9 on the top residential floor.

Is D’Tiara freehold?

Yes, according to the developer: the advertisement filed with the housing register states ‘hakmilik kekal’, which is freehold tenure.

The same advertisement notes the land is charged to AmBank (M) Berhad as project financing. Your solicitor’s title search at signing is the final word on both points.

What are the unit sizes and layouts at D’Tiara?

One size: 700 sq ft, about 65 sqm, with three bedrooms and two bathrooms. The developer lists four variants — Types A, B, C and D — all at 700 sq ft.

All four drawings are on this page: Types A and B from GSD Land’s project page, Types C and D from the advertisement it filed with the government register. Compare the room arrangement and balcony position side by side, and message me if you want the drawings sent to you.

Can foreigners buy at D’Tiara?

No. The permit records RM300,000 for every unit, and Penang Island’s minimum for a non-citizen buying strata property is RM1,000,000. Affordable-category homes are closed to foreigners in Penang as well.

If you are a foreign buyer looking at the south of the island, tell me your budget and I will point you to projects whose prices clear the state floor, and explain the state consent, the levy and the flat 8% stamp duty that applies to non-citizens.

When will D’Tiara be completed?

The developer’s advertisement gives December 2026 as the expected completion date, and the register shows the building 93.89% built and on track in October 2026.

Contractually, delivery is 36 months from your sale and purchase agreement under Schedule H. The register’s first agreement is dated 13 December 2025, so the latest date under that agreement is 13 December 2028.

Which floor and which type should I choose?

Since every home is the same size, choose by position. The developer’s master layout plan on this page shows a 13-home floor: Type A in units 2 to 6 along one side, Type B in units 7 to 12 along the other, and Types D and C in the two end homes numbered 1 and 12A. Ask me which homes face the hills and which face the coast.

The top residential floor, Level 23A, has 9 homes instead of 13, so it has fewer neighbours — and it sits directly under the rooftop deck. The register showed 28 units not yet sold when I read it, so the choice is already narrow; ask me which ones remain.

What is the price and the maintenance fee?

The only public price information is the government permit band: RM300,000 as both minimum and maximum — the band on the advertising permit, not the price of any unit. I will not repeat figures from property portals.

The developer has not published the monthly maintenance charge or sinking fund. Message me and I will send the current price list, the remaining units and the charges in writing.

How does D’Tiara compare with D’Starlingtton next door?

Same licensee, 91 m apart, very different scale. D’Starlingtton is 820 units in a 29-storey building with three- and four-bedroom homes, completed in May 2026 according to the register. D’Tiara is 230 units in one 25-storey block, all three-bedroom at 700 sq ft.

D’Starlingtton is a building you can walk through today; D’Tiara is the smaller, simpler product arriving after it. If you want four bedrooms, look next door. If you want the smaller community, this is the one.

Is Teluk Kumbar practical for daily life or for renting out?

For daily life: SMK Telok Kumbar is 1.0 km away in a straight line, the weekly night market 2.0 km, Pantai Hospital Penang 5.0 km and Queensbay Mall 8.0 km. Teluk Kumbar is a seafood-and-kampung corner of the island, quieter and less built-up than Bayan Baru.

For renting: tenant demand in this corner comes from people working at the airport and in the Bayan Lepas industrial zone, 5.1 km away. I do not quote rental figures, and if the unit carries price-control conditions, letting and resale may be restricted for a period. Check that before you buy with tenants in mind.

Get the current price list and unit availability

Developer pricing moves, and the good stacks go first. Tell me your budget and whether you’re buying to live in or to let — I’ll send back the units that actually fit, not a generic brochure.

No agent fee payable by the buyer on new developer launches

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Penang new launches · English & 中文

I work with cross-border buyers from Singapore and further afield, and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-02 · Last verified 2026-10-07 against GSD Land’s project page, the developer’s advertisement filed with the housing register, and the KPKT housing register. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

D'Tiara @ Teluk Kumbar, PenangFreehold · 700 sq ft · Teluk Kumbar
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Developer: GSD Land (6 developments on this site)

Where it is: Teluk Kumbar, Penang

All developers covered

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

30125-2 · D'TIARA

Overall status: Lancar — on schedule

Certified completion by componentRumah Pangsa/Kondo – 230 units93.89%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Pangsa/Kondo
25 storeys
Lancar
3 / 2—230RM300,000.0093.89%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 30125-2. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.