Santai D’Eco Spring (Duduk Santai 1 & 2), Tebrau
920 serviced apartments in two phases, every one of them the same 947 sq ft, 3-bedroom layout with two parking bays. The developer lists it as sold out. What is left to judge is construction progress and the resale market — and EcoWorld publishes a dated progress report, which is rarer than it should be.
Santai at a glance
From EcoWorld’s Duduk website, duduk.my/santai, read on 22 September 2026, unless marked otherwise.
- Foreign buyers
- No — below the RM1,000,000 strata floorDeveloper prices ran RM528,000 to RM574,800
- Units
- 920460 each in Santai 1 and Santai 2
- Layout
- 3 bed / 2 bath, 947 sq ftOne type only · 2 parking bays (8 units in Santai 1 get 3)
- Developer price range
- RM528,000 – RM574,800As published by the developer; now sold out
- Tenure
- Freehold
- Completion
- January 2027Developer’s date. One agency listing gives March 2028 — see below.
- Progress (1 Aug 2026)
- Santai 1: internal plasteringSantai 2: walls and roofing
- Licensed developer
- Eco Summer Sdn BhdLicence 14320/02-2029/1556(A)
- Advertising permits
- Published14320-17/02-2027/0136(A)-(S) · 14320-18/02-2027/0137(N)-(S)
- Title
- Not statedServiced apartments are commonly on commercial title — ask
Santai 1 & 2 are not Santai 3
EcoWorld’s “Duduk” series at Eco Spring has three Santai releases. This page covers Santai 1 and 2 (statutory names Flora Santai and Flora Dwipuncak Santai). Duduk Santai 3 is a separate, later project with its own page on this site and a much later completion date.
If you are offered “a Duduk Santai unit” on the subsale market, ask which phase. The difference is not cosmetic: it is roughly two years of completion timing.
The completion date conflict
The developer’s site gives January 2027. One agency listing gives 30 March 2028. The progress report dated 1 August 2026 shows Santai 1 at internal plastering and Santai 2 at walls and roofing. The date in your sale and purchase agreement is the one that governs late-delivery damages, so read that clause rather than either website.
One layout, 920 times
| Type | Built-up | Bed / bath | Parking | Developer price range |
|---|---|---|---|---|
| Single type | 947 sq ft | 3 / 2 | 2 bays | RM528,000 – RM574,800 |
From duduk.my/santai and ecoworld.my/ecospring, read 22 September 2026. A portal mentions some units up to 1,037 sq ft; the developer’s site shows 947 sq ft only.
A single-layout project has one practical consequence for resale: when it completes, 920 near-identical units reach the market at the same time, and the only things that separate them are floor, facing and condition. If you are buying on subsale to rent out, price the competition as well as the unit.
Inside Eco Spring
Santai sits within EcoWorld’s Eco Spring township, off Jalan Ekoflora Utama, Taman Ekoflora, 81100 Johor Bahru, next to Spring Labs and Eco Palladium. Residents get access to the township clubhouse. EcoWorld gives about 20.6 km to JB city centre and puts IKEA, Toppen, AEON and Lotus’s within about 5.3 km.
Santai D’Eco Spring in pictures



Images from Eco World’s official project material (ecoworld.my / duduk.my), read 22 September 2026. Renders are artist’s impressions: landscaping, furniture and fittings shown are not necessarily delivered with the unit. Floor plans and site plans are indicative and subject to the approved plans.
Both towers are well past halfway — and the SPA date settles the completion question
The developer says January 2027; one agency says March 2028. The National Housing Department register records the handover date written into the sale and purchase agreements, and the latest construction percentage for each tower.
| Project code | Registered name | Advertising permit | Units | Type | Price band on the permit | Built | Vacant possession (SPA) |
|---|---|---|---|---|---|---|---|
| 14320-18 | Flora Santai (Santai 1) | 14320-18/02-2027/0137(N)-(S) | 460 | Serviced apartment, 31 storeys, 3 bed | RM528,000 – RM573,600 | 69.94% | 8 Mar 2027 |
| 14320-17 | Flora Dwipuncak Santai (Santai 2) | 14320-17/02-2027/0136(A)-(S) | 460 | Serviced apartment, 30 storeys, 3 bed | RM528,000 – RM574,800 | 62.06% | 11 Mar 2027 |
| Total | 920 | Licensed developer: Eco Summer Sdn Bhd · licence 14320/02-2029/1556(A) | |||||
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 22 September 2026 (register data updated to 21 September 2026). Check it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=14320-18
What the register adds
The contractual handover is March 2027 for both towers. With about 30 to 38 percentage points of construction left six months before that date, watch the next progress reports closely — and know that the SPA gives you a claim for late delivery.
Both permits expire on 8 February 2027. For a sold-out project that matters less, but it is worth checking the renewal if you are buying on assignment.
EcoWorld
The licensed company is Eco Summer Sdn Bhd, the same entity behind Montfield in the same township. The published progress report is worth reading every quarter if you own or are buying here: it is the developer’s own record of where construction actually stands.
Questions I actually get asked
Can I still buy from EcoWorld?
The developer lists Santai as sold out. Any unit you are offered now is a sub-sale or an assignment of an existing purchase — check the transfer terms and fees in the original sale and purchase agreement.
Can a foreigner buy a Santai unit?
No. The Johor strata floor for non-citizens is RM1,000,000 and developer prices here ran up to RM574,800.
When will it be ready?
The developer says January 2027. One agency listing says March 2028. Rely on the date in the sale and purchase agreement, and on the developer’s dated progress reports.
Is it the same as Duduk Santai 3?
No. Santai 3 is a separate, later release with its own completion date and its own page on this site.
Where is Santai D’Eco Spring?
Inside EcoWorld’s Eco Spring township at Jalan Ekoflora, Taman Ekoflora, Tebrau, Johor Bahru, next to Spring Labs and Eco Palladium.
Is Santai freehold?
Yes, per the developer. It is a serviced apartment development, so check the land title category and utility tariffs with your lawyer.
What facilities does Santai have?
A pool, gym, garden, playground, BBQ area and multipurpose court, plus access to the Eco Spring clubhouse and an 18-acre park.
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Looking for a Santai unit on subsale?
Tell me your budget and preferred phase, and I will tell you what is actually available.
Louis Koh
11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文
I work with cross-border buyers from Singapore and with local investors. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.
Published 2026-09-22 · Last verified 2026-09-22 against EcoWorld’s Duduk website (duduk.my/santai) and Eco Spring site, with launch timing from The Edge (29 Feb 2024). Prices shown are the developer’s published range only. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
14320-17 · FLORA DWIPUNCAK SANTAI
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 30 storeys Lancar | 3 / 2, 3 | — | 460 | RM528,000.00 – RM574,800.00 | 62.06% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-09-22, project code 14320-17. Re-read weekly.
14320-18 · FLORA SANTAI
Overall status: Lancar — on schedule
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Pangsapuri Servis 31 storeys Lancar | 3 / 2, 3 | — | 460 | RM528,000.00 – RM573,600.00 | 69.94% |
Swipe the table sideways for the rest of the columns.
This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.
Read from teduh.kpkt.gov.my on 2026-09-22, project code 14320-18. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.
How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.
No floor plan is reproduced on this page — but the drawings are findable
A floor plan is the developer’s copyright. This site does not mirror one and let you assume it is official. What it can do is send you to the drawing itself.
The advertisement the developer filed and the housing department approved normally carries the location plan and the unit count and price for each type. A salesperson’s brochure can be reissued. This one cannot.
The drawing that binds the developer is the one attached to your own sale and purchase agreement. Anything on any website is a reference copy — check the schedule to your contract before you sign.




