Taman Impiana · Bidor, Perak

Taman Impiana @ Bidor

Farlim Group’s township on the Bidor–Sungkai road: 503 homes and shops in ten phases, eight of them completed with CCC. Two phases of single-storey terraces are selling: Phase 2B (53 houses, 96.75% built) and Phase 4B (62 houses, 54.72% built), both on schedule. 99-year leasehold to 2113.

2B & 4B selling · on scheduleSingle-storey terraces503-unit township99-year leaseholdBursa-listed developer

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

503Units in ten phases
1,249sq ft built-up from
8 of 10Phases completed with CCC
Artist's aerial impression of the Taman Impiana township by Farlim Group (Malaysia) Bhd, Bidor, Batang Padang, Perak
The Taman Impiana township (artist’s impression)
Artist's impression of the Phase 2B single-storey terrace houses at Taman Impiana by Farlim Group (Malaysia) Bhd, Bidor, Perak
Phase 2B single-storey terraces (artist’s impression)
Aerial photograph of the completed Phase 7A single-storey semi-detached houses at Taman Impiana, Bidor, Perak, by Farlim Group (Malaysia) Bhd
Completed Phase 7A semi-Ds from the air

Taman Impiana at a glance

The key facts in one place, from the developer’s advertisements, brochures, master plan and website. WhatsApp me for the latest price list and the houses still available.

Location
Jalan Sungkai, 35500 Bidor, PerakMukim Bidor, Batang Padang district · south of Bidor town on the road to Sungkai
Type of building
Township: single- and double-storey terraces, single-storey semi-Ds, double-storey shophousesSelling now: single-storey terraces (Phases 2B and 4B) · not gated and guarded
Total units
503 in the townshipTen phases; 115 in the two selling phases
Tenure
Leasehold, 99 yearsExpires 22 December 2113 · no land encumbrance
Progress
Phase 2B 96.75% built · Phase 4B 54.72% builtBoth on schedule · Phases 4A and 7A completed with CCC
Vacant possession
Due 8 Nov 2026 (2B) and 15 Dec 2027 (4B) under the SPAExpected completion August 2026 (2B) and August 2027 (4B)
Built-up area
Terraces about 1,249 sq ft (2B, 4A) and 1,292–1,496 sq ft (4B); semi-Ds 2,164–2,637 sq ft116, 120–139 and 201–245 sq m
Land size
Terraces from 22′ x 65′ (2B) and 22′ x 70′ (4A, 4B); semi-Ds 45′ x 80′ and 65′ x 80′Developer’s brochures; corner lots larger
Bedrooms
Terraces 3 bed / 2 bath (plus a utility room in 4A and 4B) · semi-Ds 4–5 bedDeveloper’s plans
Township size
92.7 acresDeveloper’s sales kit
Developer
Farlim Group (Malaysia) Bhd198201002529 (82275-A) · Bursa Malaysia-listed
Approving authority
Majlis Daerah TapahBatang Padang district

What would you like to know?

Jump straight to the part you came for.

Why this one

5 things that set Taman Impiana apart from other Bidor housing

A proven township, single-storey homes and phases on schedule.

🏗

A township with eight finished phases behind it

The township has ten phases with 503 units. Eight are completed with CCC, from Phase 1 in August 2020 to the Phase 7A semi-Ds in August 2025. You can walk the finished streets of Phases 1, 2A, 3A–3C and 4A before you buy into 2B or 4B.

⏱

Both selling phases are on schedule

Phase 2B is 96.75% built against vacant possession due 8 November 2026; Phase 4B is 54.72% built against 15 December 2027. Both are progressing on schedule. Phase 4A was handed over in October 2024, five months before its SPA deadline.

🏠

Single-storey, on 22-foot lots

Every house in 2B and 4B is a single-storey terrace with 3 bedrooms and 2 bathrooms on a 22′-wide lot (65′ deep in 2B, 70′ in 4B). 2B is about 1,249 sq ft; 4B runs 1,292–1,496 sq ft and adds a utility room.

🔑

Priority for first-time buyers

The developer’s advertisements give priority to first-time buyers, and corner lots come with extra side land. WhatsApp me for the current price list of both phases.

📍

On the PLUS corridor between Bidor and Sungkai

The township is about 8–9 km by road south of Bidor town and about the same north of Sungkai; Tapah is about 19 km, Ipoh about 74 km and Kuala Lumpur about 137 km. A comfortable base for families working in Bidor, Sungkai or Tapah, with the Bidor and Sungkai toll plazas on either side.

The detail

Ten phases, 503 units, two still selling

Phase names follow the developer’s master plan.

503Units in the township
10Phases
8Phases completed with CCC
96.75% / 54.72%Built: Phase 2B / Phase 4B
92.7 acTownship size (developer)
2113Lease expiry (22 December)

Phases and specification

The township has its own shophouse row (Phase 5A). By phase, and what the developer specifies:

All phases

Township
  • Phase 1 — 102 terraces (80 single-, 22 double-storey), CCC 27 Aug 2020
  • Phases 2A and 3A — 56 and 24 single-storey terraces, CCC 10 Jan 2022
  • Phases 3B and 3C — 51 and 48 single-storey terraces, CCC 6 Apr 2023
  • Phase 4A — 78 single-storey terraces, CCC 18 Oct 2024
  • Phase 5A — 15 double-storey shophouses, CCC 27 Oct 2021
  • Phase 7A — 14 single-storey semi-Ds, CCC 12 Aug 2025
  • Phase 2B — 53 single-storey terraces, 96.75% built
  • Phase 4B — 62 single-storey terraces, 54.72% built

Structure & finishes (Phase 4B)

Specification
  • Reinforced concrete frame; sand-cement brick walls
  • Cement roof tiles on steel roof frame
  • Plaster ceiling, skim coat and paint
  • Aluminium-framed glass windows
  • Steel-framed timber doors to entrance and bedrooms; PVC bathroom doors; aluminium-framed glass sliding door to the dining area of corner units

Phase 4A points (typical unit)

Developer’s specification
  • 13 lighting points, 12 power points, 6 fan points
  • 1 air-conditioner point and 2 water-heater points (15A)
  • Fibre-optic point, TV point
  • Wall tiles to about 2,100 mm in bathrooms and kitchen
  • Brick fence about 1,500 mm high

Phase 7A semi-Ds

Specification
  • Type A: 27 lighting, 16 power, 7 fan points, 4 WCs
  • Type B: 20 lighting, 14 power, 6 fan points, 3 WCs
  • 2 air-conditioner points, 2–3 water-heater points
  • Car porch for 3 cars
  • Porcelain floor tiles to porch and main rooms

Key dates

Jun 2018First sale and purchase agreements, Phase 1
27 Aug 2020Phase 1 completed with CCC
27 Oct 2021Phase 5A shophouses completed with CCC
10 Jan 2022Phases 2A and 3A completed with CCC
6 Apr 2023Phases 3B and 3C completed with CCC
18 Oct 2024Phase 4A completed with CCC, five months early
Nov 2024Phase 2B launched
12 Aug 2025Phase 7A semi-Ds completed with CCC
Dec 2025Phase 4B launched
Oct 20262B 96.75% built, 4B 54.72% built — both on schedule
8 Nov 2026Phase 2B vacant possession date
15 Dec 2027Phase 4B vacant possession date
Layouts

All 6 published layouts, smallest to largest

Two selling phases first, then the completed phases for comparison (the developer may still hold completed units — ask).

Floor plan of a Phase 2B single-storey terrace corner house at Taman Impiana, Bidor, Perak

Phase 2B single-storey terrace — about 1,249 sq ft, 3 bedrooms

🛌 3 Bed🛁 2 Bathabout 1,249 sq ftfrom 22′ x 65′ land

53 houses on 2.4 acres beside the completed Phases 1 and 2A. A 22-foot frontage with a car porch for two, living and dining down one side, the master bedroom with its own bathroom, bedrooms 2 and 3, and the kitchen at the back; the drawing shows a corner unit with its side garden. It is 96.75% built and on schedule, with vacant possession due 8 November 2026.

💬 Ask about Phase 2B
Floor plan of a Phase 4A single-storey terrace corner house at Taman Impiana, Bidor, Perak

Phase 4A single-storey terrace — about 1,249 sq ft, 3 bedrooms + utility (completed)

🛌 3+1 Bed🛁 2 Bathabout 1,249 sq ft22′ x 70′ land

78 houses, completed with CCC on 18 October 2024 and handed over on 21 October 2024. The plan adds a utility room between the kitchen and dining area. The decorated show unit pictured in the gallery is a 4A house.

💬 Ask about Phase 4A
Floor plan of a Phase 4B single-storey terrace corner house at Taman Impiana, Bidor, Perak, from the developer's advertisement

Phase 4B single-storey terrace — about 1,292–1,496 sq ft, 3 bedrooms + utility

🛌 3 Bed + utility🛁 2 Bath1,292–1,496 sq ft22′ x 70′ land

62 houses, the newest phase. The plan keeps the 4A arrangement — three bedrooms, two bathrooms, a utility room off the kitchen — with 120 to 139 sq m (about 1,292 to 1,496 sq ft) depending on the unit; the house is 22′ x 45′ on a 22′ x 70′ lot. It is 54.72% built and on schedule, with vacant possession due 15 December 2027.

💬 Ask about Phase 4B
Floor plan of a Type B single-storey semi-detached house, Phase 7A, Taman Impiana, Bidor, Perak

Phase 7A semi-D, Type B — about 2,164 sq ft, 4 bedrooms (completed)

🛌 4 Bed🛁 3 WCabout 2,164 sq ft45′ x 80′ land

12 of the 14 Phase 7A houses. Single-storey, with a courtyard between the living and sleeping wings and a car porch for three. Completed with CCC on 12 August 2025.

💬 Ask about the 7A semi-Ds
Floor plan of a Type A single-storey semi-detached house, Phase 7A, Taman Impiana, Bidor, Perak

Phase 7A semi-D, Type A — about 2,637 sq ft, 5 bedrooms (completed)

🛌 5 Bed🛁 4 WCabout 2,637 sq ft65′ x 80′ land

Only 2 of these, on the larger 65′ x 80′ lots. Five bedrooms, four WCs, a side terrace and garden, and a car porch for three. Completed with CCC on 12 August 2025.

💬 Ask about Type A
Ground floor plan of the Phase 5A double-storey shophouses at Taman Impiana, Bidor, Perak

Phase 5A double-storey shophouse — about 2,583 sq ft (developer’s figure)

Ground-floor shop1st floor: 3 rooms20′ x 70′ land15 units

The township’s own shop row: 15 double-storey shophouses, built and given CCC on 27 October 2021. The developer’s brochure prints about 1,260 sq ft on the ground floor and 1,323 sq ft upstairs. WhatsApp me to ask about shop availability.

💬 Ask about the shophouses

The 2B, 4A and 7A drawings are from the developer’s brochures; the 4B drawing is from its advertisement. Corner and end lots are larger; ask me for the dimensioned plan of a specific lot.

Location

Where Taman Impiana sits, and what is measurably near it

The township lies on Jalan Sungkai, the old trunk road between Bidor and Sungkai, in Batang Padang district. The developer’s location plan shows Bidor town, its bus station, police and fire stations to the north, the Bidor Industrial Park and Kampung Baharu Pekan Pasir nearby, and the Sungai Klah hot-spring park and FELDA Residences towards Sungkai, with the PLUS Bidor and Sungkai toll plazas on either side.

Open in Google Maps →
Taman Impiana, 35500 Bidor, Perak (Batang Padang district)Local authority: Majlis Daerah Tapah99-year leasehold to 2113

The map loads only when you click it, so this page does not send anything to Google before you ask it to.

Towns

  • Bidor town — ~8–9 km
  • Sungkai town — ~9 km
  • Tapah — ~19 km
  • Teluk Intan — ~42 km

Highways

  • PLUS North–South Expressway: Bidor and Sungkai toll plazas on either side (developer’s location plan; Farlim describes the Sungkai toll as about 5 minutes away)
  • Federal Route 1 (Jalan Sungkai) passes the township

Cities

  • Ipoh city centre — ~74 km
  • Kuala Lumpur city centre — ~137 km

On the developer’s map

  • Bidor Industrial Park
  • Kem PLKN / Polis FRU
  • Taman Rekreasi Air Panas Sungai Klah (hot springs)
  • FELDA Residences
  • KTM Sungkai station

The kilometre figures are approximate road distances from the township.

Investment & own-stay highlights

Why buy Taman Impiana @ Bidor? Key benefits for investors and homeowners

Taman Impiana @ Bidor is Farlim Group’s 99-year leasehold township of 503 homes and shops on the Bidor–Sungkai road in Perak, with eight phases completed with CCC and single-storey terraces selling in Phases 2B and 4B. Here is what makes it stand out — whether you are buying to rent out or to live in.

🏗

Eight phases already completed

Phases 1 to 4A, the 5A shophouses and the 7A semi-Ds all have CCC — walk the finished streets before you buy.

⏱

Selling phases on schedule

Phase 2B is 96.75% built with keys due November 2026; Phase 4B is 54.72% built with keys due December 2027.

🏠

Single-storey, 3 bedrooms

Terraces of about 1,249 sq ft (2B) and 1,292–1,496 sq ft (4B, with a utility room) on 22-foot lots.

🏢

Bursa-listed developer

Farlim Group, founded in 1982, built Bandar Baru Ayer Itam in Penang and Taman Sri Subang in Petaling Jaya.

🛣

On the PLUS corridor

Between the Bidor and Sungkai toll plazas, about 8–9 km from Bidor town and 19 km from Tapah.

🔑

First-time buyer friendly

The developer gives priority to first-time buyers, with an open township and no maintenance fee published.

Developer

About Farlim Group (Malaysia) Bhd

Taman Impiana is developed by Farlim Group (Malaysia) Bhd., company no. 198201002529 (82275-A), headquartered at No. 1 Lintang Angsana, Bandar Baru Ayer Itam, 11500 Penang, with an office in Taman Sri Subang, Petaling Jaya, and a Bidor office at No. 15, Jalan Impiana 1, Taman Impiana.

Farlim is a Bursa Malaysia-listed developer (Chinese brand 發林集團) incorporated in 1982, best known for Bandar Baru Ayer Itam in Penang and Taman Sri Subang in Petaling Jaya. Taman Impiana is its township in Perak. The record here is steady: eight phases completed with CCC since 2020, Phase 4A handed over five months ahead of its SPA deadline, and both selling phases on schedule.

Project website: farlim.com.my/taman-impiana-bidor.

FAQ

Frequently asked questions

What is the price of Taman Impiana?

WhatsApp me for the current unit-by-unit price list for Phases 2B and 4B. I will also send the site plan and the houses still available.

Which phases are selling now?

Phases 2B (53 single-storey terraces, 96.75% built) and 4B (62 single-storey terraces, 54.72% built), both on schedule. Phases 1, 2A, 3A–3C, 4A, 5A and 7A are completed.

When is vacant possession?

Under the SPA, vacant possession is due on 8 November 2026 for Phase 2B and 15 December 2027 for Phase 4B, with expected completion in August 2026 and August 2027.

Is construction on schedule?

Yes. Both selling phases are progressing on schedule, and the completed phases were delivered within their SPA periods — Phase 4A five months early.

Where is Taman Impiana?

It is on Jalan Sungkai about 8–9 km south of Bidor town, in Batang Padang district, Perak, between the PLUS Bidor and Sungkai toll plazas. Ipoh is about 74 km and Kuala Lumpur about 137 km by road.

Is it freehold or leasehold?

It is 99-year leasehold, expiring on 22 December 2113, so about 87 years remain in 2026. Transfers need State Authority consent.

How big are the houses?

Phase 2B terraces are about 1,249 sq ft on lots from 22′ x 65′; Phase 4B terraces are about 1,292–1,496 sq ft on 22′ x 70′ lots. All have 3 bedrooms and 2 bathrooms; 4B adds a utility room.

Can foreigners or Singaporeans buy?

Yes, for qualifying units bought from the developer. Bidor is Zone 3 (Tapah), with a RM300,000 minimum for landed homes on leasehold land; units at that level qualify with State consent, and Bumiputera lots are excluded. WhatsApp me and I will tell you which houses fit.

Are there Bumiputera lots?

The developer’s lot plans mark the Bumiputera lots. WhatsApp me and I will confirm the status of the lot you like.

Is there a maintenance fee?

No maintenance fee is published — Taman Impiana is an open township. You pay assessment to Majlis Daerah Tapah and quit rent.

How much can I borrow?

For your first and second residential property, Malaysian banks generally lend up to 90% of the price, subject to income and credit record.

How do I view a house?

WhatsApp me on +60 10-906 6685. I will send the current price list for 2B and 4B first and arrange a visit to the township.

Interested in Taman Impiana @ Bidor?

Both selling phases are on schedule. WhatsApp me and I will send you:

  • The latest price list for Phases 2B and 4B
  • The houses and corner lots still available
  • The floor plans and specification
  • A viewing of the show unit and the completed phases

No obligation, and no mailing list.

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Ipoh new launches · English & 中文

I work with cross-border buyers from Singapore and with local investors and owner-occupiers. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-08 · Updated 2026-10-26 · Compiled from the developer’s advertisements, brochures, master plan, floor plans and website (farlim.com.my). Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Taman Impiana @ BidorSingle-storey terraces · about 1,249–1,496 sq ft · Phases 2B & 4B
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.