Victory Suites (The Face II)
The tower sold as The Face II has a real name — Victory Suites, the second Platinum Victory tower on the same site, completed 2022 and still listed Open for Sale from RM1,081,000.
⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

Victory Suites (The Face II) at a glance
Everything in this table comes from Platinum Victory’s own project pages, from the hotel operator’s own site, or from Malaysian company records. Where a listing portal says something different — and on unit count, built-up range, nearest station and even the street number it does — the developer’s figure is used and the disagreement is printed rather than tidied away. Where nothing is published, the row says Not published. I would rather show you a blank than a number I cannot stand behind.
- Development
- Victory Suites (The Face II)Platinum Victory Sdn Bhd, 200101017134 (552891-H)
- What it actually is
- Tower two on the same site — a separate building, not a rebrandTower one is The Face Platinum Suites, completed 2016
- Tenure
- FreeholdPlatinum Victory’s published project data
- Land title
- Commercial StrataSold and marketed as a service apartment — see the stamp duty question below
- Building type
- Service ApartmentThe developer’s own wording on its own project page
- Blocks and units
- 1 block · 1,028 unitsA listing portal says 354 residential units; that figure is unexplained and the developer’s is the one to use
- Built-up range
- 560 – 2,455 sq ftA portal states 550–1,195 sq ft, yet live listings include a 1,625 sq ft three-bedroom
- Official price
- From RM1,081,000RM81,000 above the RM1,000,000 foreign-buyer floor in Kuala Lumpur
- Site area
- 4.75 acres4.7 acres appears elsewhere; the developer’s 4.75 is used here
- Completion
- 2022From the developer’s milestone page — its project page prints completion as a dash
- Status
- Open for SaleStill the developer’s published status in August 2026, four years after completion
- Hotel inside the building
- THE FACE Style · 327 rooms and suitesOpened 16 January 2023, operated by The Face Hotels & Resorts Sdn Bhd, 201701046807 (1260983-U)
- Published common facilities
- Infinity Pool and Gymnasium — two itemsThat is the developer’s entire published list; everything else circulating is the hotel’s or an agent’s
- Storeys
- Not publishedThe operator’s Level 51 rooftop is consistent with roughly 51 storeys, but no storey count is developer-published
- Advertising permit and developer’s licence
- Not publishedThe brochure sits behind a lead-capture form, so nothing printed on them is visible
- Maintenance charge and sinking fund
- Not publishedAsk the management corporation for the current rate per sq ft before you model any yield
Explore related topics
Curated hubs, each with its own guide — not auto-generated tag archives.
Six things to work through before you buy at Victory Suites
This is a finished freehold tower on Jalan Sultan Ismail that you can walk into and inspect today, at the lowest official entry price of the four Kuala Lumpur projects on this site. It is also one block of 1,028 units on commercial strata title, with a 327-room hotel operating inside it and 105 units listed for sale across the two towers on a single portal. All of that is true at the same time, and the second half is the half nobody puts in a brochure.
The Face II is a real second tower, and its real name is Victory Suites
This is the single most valuable thing to get straight, because half the confusion in the market comes from the naming. Platinum Victory built two towers on the same 4.75-acre site on Jalan Sultan Ismail. Tower one is The Face Platinum Suites, completed 2016. Tower two is Victory Suites, completed 2022 — the subject of this page, and the building portals label “Victory Suites (The Face 2), KLCC”. The developer’s own branding explains the names: Platinum Victory, hence Platinum Suites and Victory Suites. “The Face” is the hospitality brand operating hotels inside them, not the developer. So The Face II is not a rebranding, and it is not a marketing label for old resale stock — it is a genuinely separate, newer building. When an advertisement blurs the two, the price per square foot being quoted may belong to the other tower entirely.
RM1,081,000 clears the foreign-buyer floor by RM81,000. RM900,000 does not.
Kuala Lumpur bars foreign interests from acquiring any property valued under RM1,000,000, and “foreign interest” is defined to include Malaysian permanent residents. The developer’s official entry price of RM1,081,000 clears that line by RM81,000 — a margin so thin it deserves your attention rather than your relief. Meanwhile subsale units in this tower are being asked at RM900,000 on the open market, which is a hundred thousand ringgit below the floor. The threshold applies to the transaction in front of you, not to a launch price list from years ago. So a non-citizen’s eligibility here can turn entirely on which specific unit is bought and at what agreed price — two buyers in the same building, same week, can get different answers. Fix the price against RM1,000,000 first; negotiate second.
Commercial strata title, sold as a service apartment — do not assume it escapes the 8%
The developer publishes the land title as Commercial Strata while describing the building type, in its own words, as a Service Apartment, and the market classifies it as a service residence. Some buyers read “commercial title” as meaning the residential rules do not bite. That reading is dangerous here. From 1 January 2026 a non-citizen buying residential property pays a flat 8% stamp duty on the transfer instrument, with no tiering and no first-home relief — and the Finance Act 2025 expressly lists service apartments and SOHOs as residential. Separately, there is a rule pointing the other way: commercial property held by foreigners must be registered in a Malaysian-incorporated company under the Ministry of Economy guideline of 13 July 2022, paragraph 4. Which of those two regimes actually applies to a given parcel here is precisely the question a website cannot answer. I am a property agent, not a tax adviser. Get this specific point signed off in writing by a Malaysian conveyancing lawyer before you commit to anything.
There is a 327-room hotel inside your building — and no published terms for owners
THE FACE Style opened on 16 January 2023 with 327 rooms and suites, in this tower, with its rooftop infinity pool and gymnasium on Level 51 and the DEEPBLUE rooftop tapas bar beside the pool. The operator openly sells third-party hotel management services — operations, sales and marketing, revenue, financial and human resources management, plus property maintenance and renovation — framed as ensuring “that the property is well-managed, profitable”. That is the visible mechanism by which an owner’s unit could join a hotel pool. But the terms of any owner’s participation are not publicly disclosed anywhere: no rate, no split, no term, no exit. Living with a hotel is a real, daily condition too — shared lifts and lobbies, luggage, housekeeping traffic, a transient population next door. None of that is disqualifying. It is simply a thing you should price in with your eyes open rather than discover in month two.
1,028 units in one block, and 105 already on the market across the two towers
Supply is the number that decides your exit, and here it is unusually visible. The developer publishes 1,028 units in a single block. As at August 2026, listing-portal data — which is a low-grade source and unverified, not official — shows 34 units for sale in Victory Suites asking RM900,000 to RM2,950,000, or RM857 to RM2,022 per sq ft. Next door in The Face Platinum Suites there are 71 more listed at RM500,000 to RM1,450,000. That is 105 competing units across the two towers on one portal alone, before you count the ones held back, the ones listed elsewhere, and the 327 hotel rooms competing for short-stay demand inside your own building. For context on the wider market, NAPIC recorded 4,181 unsold completed serviced apartment units and 3,733 units of residential overhang in Kuala Lumpur in the first quarter of 2026. Completed unsold stock is what caps both price and rent, and it clears slowly.
About 4.8% observed, against “ROI 11%” in the agent headlines
Here is the most useful honest number on this page, and I want you to check my arithmetic. On the same portal there are only three rental listings for this tower, of which two are genuinely Victory Suites: RM6,400 a month for a 1,189 sq ft two-bedroom and RM6,500 for a 1,190 sq ft two-bedroom — both about RM5.40 per sq ft. Take roughly RM6,450 a month against a roughly RM1.6 million asking price for a comparable unit and you get about a 4.8% gross yield — before service charge, sinking fund, furnishing, vacancy and management fees, every one of which comes out of that number. Meanwhile live agent listing headlines for these towers advertise things like “ROI 11%” and “operator profit 8k”. I cannot substantiate those claims and I am not repeating them as fact; they are unverified marketing. The gap between roughly 4.8% observed and 11% advertised is the thing to interrogate before you sign, and the two rental data points behind my figure are a thin sample that you should widen before relying on it.
The whole development, decoded
One site on Jalan Sultan Ismail, two Platinum Victory towers six years apart, and a hotel brand operating inside both of them. Understanding which of those three things you are actually buying into is the whole exercise on this project — and it is where most of the confusion in the listings comes from.
Two towers, one site — and only one of them is what this page is about
Victory Suites (The Face II)
The second Platinum Victory tower on the 4.75-acre Jalan Sultan Ismail site, and the building this page is about. Developer-published data: 1 block, 1,028 units, freehold, Commercial Strata land title, described by the developer as a Service Apartment, built-up 560 to 2,455 sq ft, official price from RM1,081,000, status Open for Sale, completed 2022 according to the developer’s milestone page. THE FACE Style hotel, 327 rooms and suites, opened inside this tower on 16 January 2023. The developer publishes only two common facilities — an infinity pool and a gymnasium — and fifteen floor-plan sheets carrying no type codes, no areas, no bedroom counts and no floor levels. Storeys, permit numbers, maintenance charge and completion date on the project page itself are all unpublished.
The Face Platinum Suites
This is not what is being sold on this page. The Face Platinum Suites, also known as The Face Suites, is the first Platinum Victory tower on the same site, completed in 2016 — six years before Victory Suites. THE FACE Suites hotel, the operator’s first hotel, opened inside it in January 2016. It matters here for two reasons. First, the naming: listings that blur the two towers may quote you a price per square foot from the older building. Second, and more practically, it is your competition. Unverified listing-portal data as at August 2026 shows 71 units listed for sale in this tower at RM500,000 to RM1,450,000 — a cheaper asking band than Victory Suites, in the same lift-and-lobby address, aimed at the same buyer. Any exit you plan from Victory Suites has to get past those 71 first.
What is published — and by whom
Platinum Victory’s entire published common-facility list for this project is two items: an Infinity Pool and a Gymnasium. That is not a summary, it is the complete list. Everything else you will see attached to this tower comes from one of two other places: the hotel operator, which publishes its own Level 51 rooftop facilities for THE FACE Style, or an agent’s listing description, which is not a published schedule at all. The groups below keep those sources apart on purpose. A hotel facility is provided for hotel guests under the operator’s rules — it is not evidence of a residents’ entitlement, and no facilities-by-level plan for owners has been published. Before you assume access to anything, ask the management corporation what residents are actually entitled to use, in writing.
Developer’s published common facilities — the complete list
- Infinity Pool
- Gymnasium
- Nothing further is published by Platinum Victory for this project
THE FACE Style hotel · rooftop — operator-published, not a residents’ schedule
- Rooftop infinity pool
- Gymnasium
- DEEPBLUE rooftop tapas bar, beside the Level 51 pool
THE FACE Style hotel · arrival and inventory — operator-published
- Hotel lobby at ground level
- 327 rooms and suites, opened 16 January 2023
- Published room types run 455 sq ft to 1,625 sq ft
- Operated by The Face Hotels & Resorts Sdn Bhd, 201701046807 (1260983-U)
Where the project is now
All 8 Victory Suites (The Face II) floor plans
Platinum Victory publishes fifteen floor-plan sheets for this project with no type codes, no areas, no bedroom counts and no floor levels on any of them. Eight of those sheets are reproduced here, numbered S1 to S8 by me purely so we can refer to them in a conversation — those are not developer designations and you should not quote them to anyone. The only size information the developer publishes anywhere is the envelope: 560 to 2,455 sq ft. That means it is impossible, from the official material alone, to tell which drawing corresponds to which unit, how big any of them is, or how many bedrooms it has. This is not a small gap. It is the difference between knowing what you are buying and guessing. Before you agree a price, before you pay a booking fee, get the strata plan for the specific unit, with its parcel number and certified area, and match it against the sale and purchase agreement. Do not accept a drawing of a different unit as a proxy, and do not accept a square footage quoted verbally.

Official floor-plan sheet 1 of 15
Get this floor plan
Official floor-plan sheet 2 of 15
Get this floor plan
Official floor-plan sheet 3 of 15
Get this floor plan
Official floor-plan sheet 4 of 15
Get this floor plan
Official floor-plan sheet 5 of 15
Get this floor plan
Official floor-plan sheet 6 of 15
Get this floor plan
Official floor-plan sheet 7 of 15
Get this floor plan
Official floor-plan sheet 8 of 15
Get this floor planInside Victory Suites (The Face II)









Where Victory Suites (The Face II) sits
1020 Jalan Sultan Ismail, 50250 Kuala Lumpur — the same site carries two Platinum Victory towers, The Face Platinum Suites completed in 2016 and Victory Suites completed in 2022. The address above is the registered address of the hotel operating company, which is registered at the buildings themselves.
No coordinate for this building has been verified, so none is published on this page. The map above is driven by the address text, not by a latitude and longitude I have checked. Two things you should know about that address. First, 1020 Jalan Sultan Ismail is the registered address of The Face Hotels & Resorts Sdn Bhd, the hotel operating company — it is an official company registration address at the buildings, which is the strongest address evidence available, but it is a company record rather than a developer-published street number for the residential tower. Second, listing portals routinely render tower one as 1 Jalan Sultan Ismail, a different number on the same road. Treat the pin as the block, not the lift lobby, and get the lot and section number from the title search before you sign anything.
- Nearest rail station — the two sources disagree: Medan Tuanku Monorail (developer) or Bukit Nanas Monorail (portal)500 m or 280 mthe developer publishes Medan Tuanku at 500 m; the portal tags every listing 3 min (280 m) from Bukit Nanas. Both are KL Monorail stops, neither figure is independently verified, and both are walking or road figures rather than straight-line measurements. A Dang Wangi LRT station also sits in this area and neither source mentions it. I am not picking a winner
- Quill City Mall500 mdeveloper’s published road-distance figure, not a measurement I made
- Asian Heritage Row550 mdeveloper’s published road-distance figure, not a straight-line measurement
- Universiti Kuala Lumpur350 mdeveloper’s published road-distance figure — the closest institution on its list, and a relevant tenant source
- Petronas Twin Towers1.1 kmdeveloper’s published road-distance figure — a real walk, not the doorstep the KLCC label implies
- Suria KLCC1.1 kmdeveloper’s published road-distance figure, not a straight-line measurement
- Pavilion Kuala Lumpur1.4 kmdeveloper’s published road-distance figure, not a straight-line measurement
- Avenue K1.4 kmdeveloper’s published road-distance figure, not a straight-line measurement
- Hospital Kuala Lumpur1.4 kmdeveloper’s published road-distance figure, not a straight-line measurement
- KL Tower1.8 kmdeveloper’s published road-distance figure, not a straight-line measurement
- Starhill Gallery and Fahrenheit 88, Bukit Bintang2.0 km eachdeveloper’s published road-distance figures, not straight-line measurements
- UniTAR2.1 kmdeveloper’s published road-distance figure, not a straight-line measurement
- HSC Medical Centre2.4 kmdeveloper’s published road-distance figure, not a straight-line measurement
- EtonHouse International School2.5 kmdeveloper’s published road-distance figure — the nearest international school on its list
- Institut Jantung Negara and Tung Shin Hospital2.6 km and 2.7 kmdeveloper’s published road-distance figures, not straight-line measurements
- KL International Kids Club and Sayfol International School3.3 km and 3.5 kmdeveloper’s published road-distance figures, not straight-line measurements
- KPJ Tawakkal Specialist Hospital4.7 kmdeveloper’s published road-distance figure, not a straight-line measurement
- International School of Kuala Lumpur5.6 kmdeveloper’s published road-distance figure — the farthest school on its list; no distance to TRX, KL Sentral or the airport is published anywhere
Registered as Platinum Suites — 1,028 units, completed, and permitted as SOHO
| Project code | Registered name | Licensed developer | Advertising permit | Permit expired | Type on the permit | Units | Built-up | Price band on the permit | Built | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| 11699-2 | Platinum Suites | Platinum Victory Property Sdn Bhd (11699) | 11699-2/11-2022/03174(P) | 3 Nov 2022 | SOHO | 529 | 71 sq m | RM1,081,000 – RM4,699,000 | 100% | Siap Dengan CCC |
| 11699-2 | Platinum Suites | as above | as above | as above | SOHO | 499 | 71 sq m | RM1,257,000 – RM3,163,000 | 100% | Siap Dengan CCC |
| Total | 1,028 | District: Kuala Lumpur | ||||||||
Swipe sideways to see the full table →
Read from teduh.kpkt.gov.my on 27 August 2026. Pull it yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=11699-2
Two fields agree, and one of them is exact
The licensed company is Platinum Victory Property Sdn Bhd, which this page names. And the register counts 1,028 units — exactly the figure this page carries. The registered name is Platinum Suites, not Victory Suites and not The Face II.
The line on the permit that changes your monthly bills: SOHO
Both components are permitted as SOHO — small office / home office — not as residential apartments and not as serviced apartments.
This is legal, common in this part of Kuala Lumpur, and permanent. It also costs money every month for as long as you own it:
Electricity and water are billed at commercial tariffs, not domestic. Over a decade this is not a rounding error.
Assessment rates are set at the commercial rate by the city hall, which is higher than residential.
Financing may be treated as commercial lending — different margin of finance, different tenure, sometimes a different rate. Get an indicative offer in writing before you commit.
And your future buyer inherits all of it, which is exactly why it shows up in the resale price.
One question for your lawyer, with a documentary answer required: what does the title actually say? Not the brochure, not the lobby signage.
The expired permit here is not a warning sign
The licence lapsed on 3 November 2022 and both components are 100% complete with the Certificate of Completion and Compliance issued. An advertising and developer’s licence exists so that units which do not yet exist can be sold; once the building is finished there is nothing to sell off-plan and the licence is not renewed. That is the normal end of the process.
An expired permit is a warning sign in the opposite case — still building, still being marketed, permit date in the past. That is not this project.
All units are 71 sq m. The permitted prices differ by four to one.
This is the most striking thing in the record. Every one of the 1,028 units is recorded at 71 square metres — about 764 sq ft. Yet one component was permitted from RM1,081,000 to RM4,699,000.
Identical floor area, a permitted ceiling more than four times the floor. On a tower with a uniform unit size, that gap is height, aspect and view — nothing else.
So two things follow. A single per-square-foot figure quoted for this building is meaningless — it averages a low-floor unit against a top-floor one of exactly the same size. And the maintenance charge you pay is levied on the same 71 sq m regardless of which one you own, so the high floors carry a materially better ratio of value to running cost.
Those permitted numbers are from the launch era, not today. On a completed building the only meaningful evidence is actual transacted prices, and on a SOHO tower those can diverge sharply from what a permit once allowed.
Foreign buyers
Kuala Lumpur’s minimum purchase price for a non-citizen is RM1,000,000. Every permitted price in this building starts above that, so price is not the obstacle.
Two things are. On a resale the threshold is tested against the price on your own agreement, not the old permit band. And because the units are permitted as SOHO on what is likely commercial title, a non-citizen or foreign interest acquiring commercial property may be required to hold it through a Malaysian-incorporated company. Confirm the title category and the holding structure with your own lawyer before you commit — the answer determines your tax treatment as well as your ownership route.
A note on the wider group, offered as context and not as a finding
Several other licensed companies carrying the Platinum Victory name appear in the register. They are separate licensed entities with separate licence numbers, and nothing in one record carries over to another. Among them: Residensi PV 22 (9832-11, 2,082 units) is recorded as Lewat — late, and a 448-unit scheme under licence 13231 carries the status Permit Telah Dibatalkan — permit cancelled.
I am printing this because a buyer searching “Platinum Victory permit” will hit those records, and finding them without this explanation would be worse than not finding them at all. They say nothing about 11699-2, which is finished with a CCC. But they are on the same public register, and you should know what you are looking at.
Ask for documents using the registered name
Use Platinum Suites, project code 11699-2, Platinum Victory Property Sdn Bhd.
About Platinum Victory Sdn Bhd
Two companies matter on this project and they are not the same company. The developer is Platinum Victory Sdn Bhd, registration number 200101017134 (552891-H) — it built both towers on this Jalan Sultan Ismail site, it publishes the project data used on this page, and it is the entity behind the price list and the sale and purchase agreement. The hotel inside the building is run by The Face Hotels & Resorts Sdn Bhd, 201701046807 (1260983-U), registered at 1020 Jalan Sultan Ismail, 50250 Kuala Lumpur — that is, at the buildings themselves — telephone +603 2168 1688. Before you sign anything at all, read the letterhead and ask plainly which of those two entities is the counterparty. A purchase contract and a hotel management contract are different documents with different obligations, and being handed both in the same meeting is not the same as them being the same deal.
The names are less mysterious than they look once you know the developer. Platinum Victory branded tower one Platinum Suites and tower two Victory Suites; “The Face” is the hospitality brand that operates hotels inside them. So the tower marketed as The Face II is a genuine, separate, second building — completed in 2022 — on the same 4.75-acre site as The Face Platinum Suites, which completed in 2016. It is not a rebranding exercise and it is not a marketing label stuck on resale stock from the older tower. Developer-published data for Victory Suites: 1 block, 1,028 units, freehold, commercial strata land title, described by the developer in its own wording as a Service Apartment, built-up 560 to 2,455 sq ft, official price from RM1,081,000, status Open for Sale. The developer also publishes an official 360-degree aerial tour of the tower.
The hotel operator is unusually open about one thing and completely silent about another. Openly, The Face Hotels & Resorts sells third-party hotel management services, and publishes its own list of them: operations management, sales and marketing, revenue management, financial management, human resources management, and property maintenance and renovation — framed as ensuring “that the property is well-managed, profitable”. That is the visible mechanism by which an individual owner’s unit could enter a hotel pool. What is completely absent is the part you would actually sign. No guaranteed rental return, no rental-pool yield, no pool participation rate, no term length and no fine print of any kind is published by either the developer or the operator. Nothing on this page should be read as an investment return, because there is no published return to read. If someone shows you one, the correct response is to ask for the executed agreement, not the slide.
Finally, the honest limits of this page. I have not investigated whether Platinum Victory has ever been in financial distress, in delay, in abandonment or in litigation. I did not check it, so I am not telling you there is none — I am telling you it is unchecked, which is a different sentence. Also not published anywhere I can point you to: the advertising permit number and the developer’s licence number and everything printed on them (the brochure sits behind a lead-capture form), the number of storeys, facilities by level, gross floor area, gross development value, the maintenance charge, the sinking fund rate, and any distance to TRX, KL Sentral or the airport. And the developer’s own site contradicts itself on completion — the project page prints “Project Completion: -” with status Open for Sale, while the milestone page lists Victory Suites as completed in 2022. Ask for the certificate of completion and compliance in writing rather than accepting either page.
Frequently asked questions
What exactly is The Face II, and how does it relate to The Face Platinum Suites?
The Face II is a genuine second tower, and its real name is Victory Suites. It is not a rebranding of an older building and it is not a marketing label attached to resale stock. Platinum Victory built two separate towers on the same 4.75-acre site on Jalan Sultan Ismail, six years apart.
Tower one is The Face Platinum Suites, also written as The Face Suites, completed in 2016. Tower two is Victory Suites, completed in 2022, which listing portals label “Victory Suites (The Face 2), KLCC”. The names come straight from the developer: Platinum Victory branded the first Platinum Suites and the second Victory Suites.
“The Face” is a third thing again — it is the hospitality brand operating hotels inside the buildings, run by The Face Hotels & Resorts Sdn Bhd. THE FACE Suites hotel opened inside tower one in January 2016. THE FACE Style, a second hotel with 327 rooms and suites, opened on 16 January 2023 inside the tower this page is about.
The practical consequence is money. When a listing blurs the two towers, the price per square foot, the age of the building and the facilities being described may all belong to the other one. Before you compare anything, ask which tower and get the answer in writing.
Can a foreigner or a Malaysian permanent resident buy here?
Yes, you can buy — but on this project eligibility can turn on which specific unit you buy. Kuala Lumpur applies a minimum purchase price of RM1,000,000 to foreign interests, and “foreign interest” is defined to include Malaysian permanent residents. That surprises a lot of permanent residents, so read it twice.
Now look at the numbers on this building. The developer’s official price starts at RM1,081,000, which clears the floor by RM81,000. But unverified listing-portal data as at August 2026 shows subsale units in this same tower being asked at RM900,000 — a hundred thousand ringgit below the threshold. The rule applies to the transaction, not to a launch price list, so the identical building can be buyable on one unit and legally impossible on another.
There is a second gate. A transfer to a non-citizen needs written state consent under section 433B of the National Land Code. In the Federal Territory that consent comes from the Federal Territory of Kuala Lumpur Land Working Committee (Jawatankuasa Kerja Tanah Wilayah Persekutuan Kuala Lumpur), applied for through the Federal Territory Land and Mines Office after the sale and purchase agreement is signed. Build that timeline into your offer conditions.
Then budget the money. Since 1 January 2026 a non-citizen buying residential property pays a flat 8% stamp duty on the transfer instrument, with no tiering and no first-home relief. On exit, RPGT for non-citizens and foreign companies is 30% within five years and 10% from the sixth year onward, with no zero-rate band ever. Foreign buyer loan margins are typically 60 to 70%, so plan the cash, not just the price.
Tell me your nationality, your residency status and the exact unit, and I will check the agreed price against the RM1 million line before you pay anything.
It is on commercial strata title — does that mean I avoid the 8% residential stamp duty?
Do not assume that, because assuming it is how buyers get an unpleasant surprise at the transfer stage. Platinum Victory publishes the land title as Commercial Strata and, in the same breath, describes the building type as a Service Apartment. The market treats it as a service residence.
The tax rule cuts against the comfortable reading. From 1 January 2026, a non-citizen buying residential property pays a flat 8% stamp duty on the transfer instrument — flat, no tiering, no first-home relief — and the Finance Act 2025 expressly lists service apartments and SOHOs as residential. A commercial land title on the master document does not automatically take a service apartment outside that definition.
There is a separate rule running the other way, and it is not a comfort either. Under the Ministry of Economy guideline of 13 July 2022, paragraph 4, commercial property held by foreigners must be registered in a Malaysian-incorporated company. If a parcel here were treated as commercial for that purpose, a foreign individual would be looking at incorporating and maintaining a Malaysian company, with all the cost and filing that implies.
So you may be facing the residential tax rule, the commercial holding rule, or an interaction of the two — and which one applies to your specific parcel is exactly the question that needs a lawyer rather than a website. I am a property agent, not a tax adviser, and nothing here is tax advice.
The instruction I give every buyer on this building is the same: before you sign anything or pay a booking fee, put the title extract and the draft sale and purchase agreement in front of a Malaysian conveyancing lawyer and ask for a written opinion on which regime applies. That opinion costs a fraction of the stamp duty it might save or cost you.
Will the hotel operator rent my unit out for me, and on what terms?
A licensed operator does run hotel operations in this building, and it openly sells third-party management services — but the terms on which an individual owner could participate are not publicly disclosed anywhere. Those two sentences have to be held together, because most of the sales talk you will hear collapses them into one.
What is published: The Face Hotels & Resorts Sdn Bhd, 201701046807 (1260983-U), operates THE FACE Style inside this tower — 327 rooms and suites, opened 16 January 2023 — and lists its management services as operations management, sales and marketing, revenue management, financial management, human resources management, and property maintenance and renovation, framed as ensuring “that the property is well-managed, profitable”. That is the visible mechanism by which a unit might enter a hotel pool.
What is not published, by anyone, anywhere: no guaranteed rental return, no rental-pool yield, no participation rate, no term length and no fine print at all. There is nothing for me to show you and nothing for you to rely on. If a salesperson quotes a pool return, the correct response is to ask for the executed management agreement and read the exit clause, the fee stack and the reporting obligations before anything else.
One more distinction that matters legally. A licensed hotel lawfully operating in the building is not the same thing as an individual owner short-letting a private strata parcel. I have not verified that short-term letting is permitted for owners here, and I am not going to tell you it is. Read the management corporation’s house rules and read your own sale and purchase agreement, and if short-letting is central to your plan, get a lawyer to confirm it in writing before you buy.
What does a unit here actually rent for, and where does the “11%” come from?
The observed evidence is thin but consistent, and it points to roughly RM5.40 per sq ft a month. Everything in this answer is unverified listing-portal data, not official figures, and you should treat it as a starting point for your own checking rather than as a fact.
As at August 2026 there were only three rental listings for this tower on the portal, of which two are genuinely Victory Suites: a 1,189 sq ft two-bedroom at RM6,400 a month and a 1,190 sq ft two-bedroom at RM6,500 a month. That is about RM5.40 per sq ft in both cases, which at least means the two data points agree with each other.
Now the arithmetic. Take roughly RM6,450 a month against a roughly RM1.6 million asking price for a comparably sized unit, and you get about a 4.8% gross yield. Gross means before the service charge, before the sinking fund, before furnishing, before vacancy and before any management fee. Every one of those comes out of the 4.8%, and I cannot tell you by how much because the maintenance charge for this building is not published.
Against that, live agent listing headlines for these towers advertise things like “ROI 11%” and “operator profit 8k”. I have seen no substantiation for those claims and I am not repeating them as fact — they are unverified marketing claims, nothing more. The gap between roughly 4.8% observed and 11% advertised is the most useful honest number on this page, and it is the question to put to whoever is quoting the 11%: show me the leases.
Be honest about the limits of my figure too. Two rental listings is a very thin sample, and one asking price is not a transaction. Before you commit, get the actual tenancy comparables from the management office and the last transacted prices, not the asking prices.
How many units are really in this building, and how much competition will I face when I sell?
Use the developer’s figure: 1,028 units in one block. That is what Platinum Victory publishes on its own project page, alongside a development area of 4.75 acres. A listing portal instead describes the building as “354 exclusive residential units alongside hotel suites”. I cannot reconcile those two numbers, and I am not going to publish a theory as if it were a finding. What I will say plainly is that the developer’s figure is the one to use and the portal figure is unexplained.
On competition, the picture is unusually easy to see and worth looking at squarely. Unverified portal data as at August 2026 shows 34 units listed for sale in Victory Suites, asking RM900,000 to RM2,950,000, which works out at RM857 to RM2,022 per sq ft — a spread so wide it tells you the market has not settled on what this building is worth.
Then add the neighbour. The Face Platinum Suites, the 2016 tower on the same site, has 71 units listed at RM500,000 to RM1,450,000. That is 105 competing units across the two towers on a single portal, plus the 327 hotel rooms inside your own building competing for short-stay demand.
For the wider market: NAPIC’s first quarter 2026 figures for Kuala Lumpur record 3,733 units of residential overhang and 4,181 unsold completed serviced apartment units. Completed unsold stock is what caps both prices and rents, and it does not clear quickly.
None of this makes the building unbuyable. It does mean the price you pay is the only variable you control, and that in a market like this one, buying well matters far more than the brochure.
Why can I not tell which layout I am being shown?
Because the developer publishes fifteen floor-plan sheets with no type codes, no areas, no bedroom counts and no floor levels on any of them. That is not a criticism dressed up as a fact — it is simply what is on the website. Eight of those sheets appear on this page, numbered S1 to S8 by me for reference only; those are not developer designations.
The only size information Platinum Victory publishes anywhere is the envelope: 560 to 2,455 sq ft. There is no labelled layout schedule, no facilities-by-level plan and no storey count. So from the official material alone, nobody — including me — can tell you that a given drawing is the unit you are being offered.
It gets more confusing when portals join in. One states a built-up range of 550 to 1,195 sq ft for this building, which is contradicted both by the developer’s own 2,455 sq ft ceiling and by live listings that already include a 1,625 sq ft three-bedroom. When two sources disagree and one of them is a portal, use the developer’s.
The fix is straightforward and it is the same on every completed strata building in Malaysia: get the strata plan for the specific parcel, with the parcel number and the certified area, and match it line by line against the sale and purchase agreement before you agree a price. Do not accept another unit’s drawing as a proxy, and do not accept a square footage quoted verbally by anybody, me included.
What is it actually like to own in a tower with a 327-room hotel inside it?
It is a genuine, daily condition of ownership, not a footnote. THE FACE Style opened here on 16 January 2023 with 327 rooms and suites, with its rooftop infinity pool and gymnasium on Level 51 and the DEEPBLUE rooftop tapas bar beside that pool. Its published room types run from a 455 sq ft Superior King up to a 1,625 sq ft three-bedroom deluxe — which is to say, hotel inventory that overlaps in size with the apartments.
On the plus side, a professionally run hotel in the building usually means the public areas are maintained to a standard, there is a staffed presence around the clock, and the address stays visible. Those are real benefits, and they are the reason some owners specifically want a building like this.
On the other side: lift traffic, luggage, housekeeping trolleys, a rotating population you will never get to know, and shared circulation at the times you most want quiet. If you are buying to live here, spend an hour in the lobby on a Friday evening before you decide. If you are buying to let, understand that those 327 rooms are competing for exactly the short-stay demand your unit would chase.
The most important caution is legal rather than practical. A licensed hotel operating lawfully in the building is legally a different thing from an individual owner short-letting a private strata parcel. The hotel’s licence is not your permission. I have not verified that owners here may short-let, and I will not tell you they may. Read the management corporation’s house rules and your own sale and purchase agreement, and if the answer matters to your plan, have a lawyer confirm it in writing before you buy.
Finally, ask what residents are actually entitled to use. The developer publishes only two common facilities for this project. The Level 51 pool, gymnasium and rooftop bar are the hotel’s, published by the operator — not a residents’ schedule.
Of the four Kuala Lumpur projects on this site, which one should I look at?
It depends entirely on what you are optimising for, so here are all four with their strongest and weakest points side by side, rather than a ranking that pretends there is one right answer.
SO/ Kuala Lumpur Residences is the finished one. Completed August 2025, handover from September 2025, freehold, 590 units of 566 to 995 sq ft. You can walk into it today and inspect the actual product rather than a rendering. If certainty about what you are buying is what you care about most, this is the one that gives you the most of it.
Conlay by E&O is the largest and most expensive. Freehold, 491 units, from RM1.46 million, with a Bursa-listed parent behind it — which is the strongest corporate covenant of the four. The counterweight is documentary: its published advertising permit expired in 2022 and its permitted completion date has passed. That is a question to put to the developer directly, in writing, before anything else.
Victory Suites, this project, is the cheapest entry. Official price from RM1,081,000, completed 2022 and still selling four years later, freehold but on commercial strata title, 1,028 units in one block, with a 327-room hotel operating inside the same tower. It is the most accessible of the four on price and the most complicated on structure — the RM1 million floor sits uncomfortably close to the subsale asking range, and the commercial-versus-residential question needs a lawyer.
Royal Lexis Kuala Lumpur is the one nobody can yet evaluate. No price, no permit, no completion date and no unit count has been published. That is not a criticism of the project; it is a statement that there is nothing there to assess. If someone is pushing you to commit to it today, ask them which of those four things they can show you.
My honest summary: buy SO/ if you want to see and touch what you are buying; look hard at Conlay if you want scale and a listed parent and you are prepared to chase the permit question; consider Victory Suites if entry price is the binding constraint and you will pay a lawyer to settle the title question first; and wait on Royal Lexis until there is something published to read.
Send me the unit number and I will check the title, the price against the RM1 million floor, and what the building actually rents for
This tower is finished, so almost everything that matters is unit-specific: which parcel, what the strata plan says the area is, whether the agreed price sits above or below RM1,000,000, what the management corporation’s house rules say about letting, and what the last comparable lettings in the building actually closed at. Tell me the unit and I will come back with those five things in writing before anybody talks about a deposit.
No agent fee payable by the buyer on new developer launches
Louis Koh
11 years in Malaysian property · Johor Bahru & Kuala Lumpur new launches · English & 中文
I work with cross-border buyers from Singapore and with local investors. I'll tell you when a project isn't right for you — that's usually worth more than the brochure.
Published 2026-08-11 · Last verified 2026-08-11 against Platinum Victory Sdn Bhd's published project material. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.
Ask a specific question
If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.
Developer: Platinum Victory (1 development on this site)
Where it is: KLCC, Kuala Lumpur (KL)
The unit mix, the permitted price and how far up it is
None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).
11699-2 · PLATINUM SUITES
Overall status: Siap Dengan CCC — completed
| Component | Bed / bath | Built-up | Units | Price on the permit | Complete |
|---|---|---|---|---|---|
| Soho 51 storeys Siap Dengan CCC | — | 71 m² ≈ 764 sq ft | 499 | RM1,257,000.00 – RM3,163,000.00 | 100.00% |
| Soho 51 storeys Siap Dengan CCC | — | 71 m² ≈ 764 sq ft | 529 | RM1,081,000.00 – RM4,699,000.00 | 100.00% |
Swipe the table sideways for the rest of the columns.
Read from teduh.kpkt.gov.my on 2026-10-17, project code 11699-2. Re-read weekly.
What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.