Sierra Beringin @ Gopeng
Skip to main content
🇲🇾 11 years in Malaysian property · New launches from Johor Bahru to Ipoh
Taman Raia Utama · Gopeng, Perak

Sierra Beringin @ Gopeng

620 freehold terraces on 20′ x 70′ lots on a hillside at Gopeng, all completed with CCC (Phase 1 December 2024, Phase 2 September 2025), with an SPA price band from RM225,000 on the advertising permits. Registered as Taman Raia Utama, marketed as Sierra Beringin by Keris Properties (Team Keris group), and sold by agents as City on the Hills. Both advertising permits have lapsed (September 2024 and November 2025), so what you buy here today is mostly from owners.

Completed · CCC 2024–2025RM225,000–RM873,600FreeholdPermits lapsed, none renewedNo maintenance fee

⚡ Typical reply within 15 minutes, 9am–10pm MYT · No obligation

620Terraces on the register, two phases
CCCPhase 1 Dec 2024 · Phase 2 Sep 2025
20×70Every lot, in feet
Completed single-storey terrace row at Sierra Beringin (Taman Raia Utama) by Keris Properties Sdn Bhd, Team Keris group, Gopeng, Perak
Completed single-storey terrace row
Completed double-storey terrace row with corner unit at Sierra Beringin (Taman Raia Utama) by Keris Properties Sdn Bhd, Gopeng, Perak
Completed double-storey terrace row
Drone photograph of Sierra Beringin terrace rows under construction on 31 December 2023, Taman Raia Utama, Gopeng, Perak
Drone view of the estate, 31 December 2023

Sierra Beringin at a glance

Regulatory facts are from the government housing register (teduh.kpkt.gov.my), read on 8 October 2026; the rest from the developer’s two advertisements filed with the housing ministry, its e-flyer (statutory particulars), its overview brochure and its site and floor plans. Where the developer publishes nothing, I say so.

Location
Taman Raia Utama, 31600 Gopeng, Kampar district, PerakAbout 2 km north-west of Gopeng town centre in a straight line; the drive is longer
Names
Registered: Taman Raia Utama · marketing: Sierra Beringin (雲轩) · agents: City on the HillsAll three refer to the same 620 terraces
Type of building
Single- and double-storey terrace housesLanded, not gated and guarded · every lot 20′ x 70′
Total units
620Register: 300 in Phase 1 (6052-7: 230 single-storey + 70 double-storey) and 320 in Phase 2 (6052-8: 244 + 76)
Tenure
Freehold‘Selama-lamanya’ on both filed advertisements
SPA price band on the permits
RM225,000 – RM873,600Government register, read 8 Oct 2026 · not a current price list
Register status
Siap Dengan CCC · 100% builtBoth phases: completed, Certificate of Completion and Compliance issued
Completion
CCC 11 Dec 2024 (Phase 1) · CCC 23 Sep 2025 (Phase 2)Vacant possession recorded 12 Dec 2024 and 27 Sep 2025
Built-up area
Single-storey about 915 sq ft (85 sq m) · double-storey about 1,195 sq ft (111 sq m)Register; Phase 2 also lists a single-storey variant of 94 sq m (about 1,012 sq ft)
Bedrooms
4 bedrooms, 2 bathrooms (both types, per the developer)The Phase 2 entries also list 2-bedroom single-storey and 3-bathroom double-storey variants
Developer
Keris Properties Sdn BhdCompany no. 230241-W · licensed developer 6052 · a subsidiary of Team Keris Berhad (702437-W)
Developer’s licence
6052/11-2028/1299(A)On the register and the Phase 2 advertisement, valid 24 Nov 2023 – 23 Nov 2028
Advertising permits
6052-7/09-2024/1268(R)-(L) · 6052-8/11-2025/0704(A)-(L)Expired 22 Sep 2024 and 23 Nov 2025; no renewal on the register
Approving authority
Majlis Daerah KamparPlan ref. Bil (5) dlm.MDKpr(KEJ) 2/2021 (KM/PB-S)
Why this one

5 things that actually separate Sierra Beringin from other Kinta Valley terrace schemes

Not a feature list. Who this suits, and what to check before you commit.

🔑

Freehold, which is rare at this size

Both filed advertisements print the tenure as selama-lamanya (freehold). Most new terrace schemes around Gopeng and south Ipoh are 99-year leasehold. Freehold also means there is no lease to run down — but it also means foreigners cannot buy here (see the FAQ).

✅

It is finished, with CCC for both phases

The register records CCC on 11 December 2024 for Phase 1 (300 houses) and 23 September 2025 for Phase 2 (320 houses), 100% built. You can inspect the actual house, the road and the drainage before you pay anything.

📏

Same 20′ x 70′ lot, two house sizes

Every lot is 20′ x 70′ (1,400 sq ft). The single-storey Blu Bayu is about 915 sq ft (20′ x 46′); the double-storey Breezzy about 1,195 sq ft. Both are drawn with 4 bedrooms and 2 bathrooms, which is a lot of rooms for the floor area — the rooms are small.

💰

No maintenance fee — because it is not gated

The developer’s materials list no maintenance fee and no security tiers: it is an open taman, so you pay only council assessment to Majlis Daerah Kampar and quit rent.

⚠

The trade-offs: late Phase 1 delivery, lapsed permits, and distance

Under the first Phase 1 SPA (2 October 2021) vacant possession was due by 2 October 2023; the register records it on 12 December 2024. Both advertising permits have lapsed with no renewal on the register, so a buyer today will normally deal with an owner, not the developer. And Gopeng is a small town: Ipoh city is about 15 km away in a straight line.

The detail

620 terraces on one hillside, built in two phases

The developer’s lot layout plan shows the terrace rows laid across the slope inside the site boundary, with lot numbers running past 600; its renders show the limestone hills of the Kinta Valley behind.

620Terrace houses on the register
300 + 320Phase 1 (6052-7) + Phase 2 (6052-8)
100%Built, both phases, CCC issued
20′ x 70′Every lot
915 / 1,195sq ft built-up, single / double-storey
FreeholdTenure

Estate and specification

A plain terrace estate: no clubhouse, no guardhouse. What the developer’s filed advertisements and brochure show:

Estate

Brochure & plans
  • Open taman, not gated and guarded
  • No maintenance fee
  • Wide car porch drawn without pillars
  • Show houses built on lots 339 (single-storey) and 43A (double-storey)
  • A future ‘Camp Cool’ leisure area shown on renders as future development, artist’s impression only

Structure & finishes

Filed advertisement
  • Reinforced concrete frame
  • Sand-cement brick walls
  • Roof trusses with cement roof tiles
  • Ceiling printed as ‘siling berplaster / kepingan asbestos’ (plastered ceiling or asbestos-cement boards) — ask which was used
  • Aluminium casement and fixed glass windows; ceramic tiles to living, dining, bedrooms, bathrooms and kitchen

Points per house

Filed advertisement
  • 2 WCs, 2 wash basins, 2 showers, 1 kitchen sink
  • 12 lighting points, 6 x 13A power points, 1 ceiling-fan point
  • 1 telephone point, 1 letter box
  • Wall tiles about 1,500 mm high in kitchen and bathrooms
  • 4-ft chain-link fence front, side and rear, with a steel frame gate

What is on the record, and when

2020Project launched (agency project notes)
23 Sep 2021Phase 1 advertising permit valid from this date
2 Oct 2021Date of the first SPA, Phase 1 (6052-7)
24 Nov 2021Phase 2 advertising permit valid from this date
18 Aug 2023Date of the first SPA, Phase 2 (6052-8)
2 Oct 2023Vacant possession due under the first Phase 1 SPA
31 Dec 2023Drone photograph shows the first rows of houses roofed
22 Sep 2024Phase 1 permit 6052-7/09-2024/1268(R)-(L) expires
11 Dec 2024Phase 1 CCC; vacant possession recorded 12 Dec 2024
18 Aug 2025Vacant possession due under the first Phase 2 SPA
23 Sep 2025Phase 2 CCC; vacant possession recorded 27 Sep 2025
23 Nov 2025Phase 2 permit 6052-8/11-2025/0704(A)-(L) expires
8 Oct 2026Register read: both phases Siap Dengan CCC, no current permit
23 Nov 2028Developer’s licence 6052/11-2028/1299(A) expires
Layouts

Both published layouts, smallest to largest

Two house types on the same 20′ x 70′ lot. Built-up figures are the register’s; the room layout is the developer’s brochure drawing.

Floor plan and elevations of the Blu Bayu single-storey terrace house, 20 x 70 ft lot, Sierra Beringin, Gopeng, Perak

Blu Bayu single-storey terrace — about 915 sq ft, 4 bedrooms

🛌 4 Bed🛁 2 Bathabout 915 sq ft20′ x 70′ land

A 46′-deep house behind a 24′ car porch on the brochure plan. Living room and master bedroom (with bathroom 1) at the front; bedrooms 2, 3 and 4 down one side; dining in the middle; kitchen and bathroom 2 at the back. No stairs, which suits older buyers, but four bedrooms in about 915 sq ft means bedrooms 2–4 are small. The register has 474 single-storey houses across both phases (230 + 244) at 85 sq m (about 915 sq ft); the Phase 2 entry also lists a 94 sq m (about 1,012 sq ft) variant and 2-bedroom units without saying which lots — ask for the plan of your specific lot.

💬 Ask about the single-storey
Ground and first floor plans of the Breezzy double-storey terrace house, 20 x 70 ft lot, Sierra Beringin, Gopeng, Perak

Breezzy double-storey terrace — about 1,195 sq ft, 4 bedrooms

🛌 4 Bed🛁 2 Bathabout 1,195 sq ft20′ x 70′ land

Ground floor about 20′ x 40′ behind a 22′ car porch: living, dining, dry kitchen and a wet kitchen at the back, with bedrooms 3 and 4 sharing bathroom 2. The first floor is only about 20′ x 25′ (the filed advertisement prints 20′ x 19′6″ for the upper floor): master bedroom, bedroom 2 and bathroom 1, with the rest of the upper level as roof. In other words, a single-storey house with a small upper floor, not a full double-storey. The register has 146 of them (70 + 76) at 111 sq m (about 1,195 sq ft); the Phase 2 entry lists some with 3 bathrooms.

💬 Ask about the double-storey

Plans from the developer’s Sierra Beringin overview brochure (October 2021); the filed advertisements carry the same layouts. Built-up figures are the register’s per-type figures, read 8 October 2026. Corner and end lots differ: check the title and the approved plan for the exact lot.

Location

Where Sierra Beringin sits, and what is measurably near it

Taman Raia Utama is on rising ground north-west of Gopeng town, off the old Ipoh–Kampar trunk road, between the Simpang Pulai and Gopeng interchanges of the North–South Expressway. The developer’s map places it beside RTC Gopeng (the rural transformation centre) and near the Lotus’s distribution centre.

Open in Google Maps →
Taman Raia Utama, 31600 Gopeng, Perak (Kampar district)Local authority: Majlis Daerah KamparFreehold

The map loads only when you click it, so this page does not send anything to Google before you ask it to.

Highways (developer’s figures)

  • PLUS Gopeng toll — 6 km
  • PLUS Simpang Pulai toll — 7 km

Daily needs (developer’s figures)

  • RTC Gopeng — 220 m
  • Mydin — 300 m
  • BSN — 2.7 km; RHB — 2.8 km

Towns (straight line, my measurement)

  • Gopeng town centre — ~2 km
  • Ipoh city centre — ~15 km
  • Batu Gajah — ~14 km
  • Kampar town — ~20 km

Healthcare and campuses

  • Hospital Raja Permaisuri Bainun, Ipoh — ~15 km (straight line)
  • Kolej Komuniti at RTC Gopeng — 220 m (developer’s figure for RTC Gopeng)
  • UTAR Kampar campus — in Kampar town, about 20 km south

Leisure (developer’s figures)

  • Gaharu Tea Valley — 3.1 km
  • Gopeng white-water rafting — 8.6 km
  • Gua Tempurung — 12.7 km

Figures marked as the developer’s come from its overview brochure (October 2021) and its filed advertisements. I could not reach a road-routing service on 8 October 2026, so the town and hospital figures are straight-line distances I measured from the register’s site coordinates (4.4884, 101.1611); the drive is always longer. Check your own route.

The government record

620 terraces in Gopeng, completed with CCC — permitted from RM225,000; both permits have lapsed

On the government housing register this scheme is entered as Taman Raia Utama under two project codes: 6052-7 (Phase 1, 300 houses) and 6052-8 (Phase 2, 320 houses). The developer markets it as Sierra Beringin, and the agency file calls it City on the Hills. The licence is held by Keris Properties Sdn Bhd (6052). Both entries carry the status Siap Dengan CCC. Neither advertising permit is current: they expired on 22 September 2024 and 23 November 2025, and the register shows no renewal. I read the entries on teduh.kpkt.gov.my on 8 October 2026.

Project codeRegistered nameLicensed developerAdvertising permitPermit expiresUnitsBed / bathPrice band on the permitBuiltStatus
6052-7Taman Raia Utama (Phase 1)Keris Properties Sdn Bhd (6052)6052-7/09-2024/1268(R)-(L)22 Sep 2024 (lapsed)3004 / 2 (single-storey); not stated (double-storey)RM225,000 – RM873,600100%Siap Dengan CCC
6052-8Taman Raia Utama (Phase 2)Keris Properties Sdn Bhd (6052)6052-8/11-2025/0704(A)-(L)23 Nov 2025 (lapsed)3202–4 / 2–4RM250,000 – RM607,000100%Siap Dengan CCC

Building type by entry: 6052-7 is 230 single-storey terraces (85 sq m, about 915 sq ft) and 70 double-storey terraces (111 sq m, about 1,195 sq ft); 6052-8 is 244 single-storey terraces (85–94 sq m, about 915–1,012 sq ft) and 76 double-storey terraces (111 sq m, about 1,195 sq ft). CCC: 11 December 2024 (6052-7) and 23 September 2025 (6052-8); vacant possession recorded 12 December 2024 and 27 September 2025. Approving authority: Majlis Daerah Kampar, plan reference Bil (5) dlm.MDKpr(KEJ) 2/2021 (KM/PB-S). Tenure: freehold (‘selama-lamanya’). Land encumbrance: Maybank Islamic Berhad (charge). Restriction in interest: none. Architect: Ding Poi Kooi; structural engineer: LTE Engineers Sdn Bhd. Expected completion printed on the filed advertisements: August 2023 (6052-7) and April 2025 (6052-8). Developer’s licence: 6052/11-2028/1299(A), valid 24 November 2023 to 23 November 2028; the Phase 1 advertisement prints the earlier licence 6052/11-2023/0854(A), valid 24 November 2021 to 23 November 2023. SPA form: Schedule G (Jadual G, landed property with individual title). Date of first SPA: 2 October 2021 (6052-7) and 18 August 2023 (6052-8); vacant possession due under those first SPAs: 2 October 2023 and 18 August 2025. Earlier permits on the register: 6052-7/09-2023/0177(A)-(L) and 6052-7/09-2023/0686(P) (23 September 2021 – 22 September 2023); 6052-8/11-2023/0854(P), 6052-8/11-2023/0024(A)-(L), 6052-8/11-2024/1570(R)-(L) and 6052-8/11-2025/0704(R)-(L) (24 November 2021 – 23 November 2025). The 2022 e-flyer prints ‘6052-7/09-2023/0686(L)’ as the licence number, which is in fact the format of the 2021 permit. No Bumiputera-quota unit count is stated on the register. Ask the seller for the title, the CCC and the SPA of the unit you are considering.

The price band on the permit is the developer’s approved SPA (sale and purchase agreement) price range on the government register — the range within which units could be sold, not a current price list for any particular unit, and not what an owner will ask today. Check the entries yourself: teduh.kpkt.gov.my/semakan-status-kemajuan?kodProjek=6052-7 (then 6052-8) · How to run this check yourself, and what the seven status words mean →

What the permitted price band tells you

The permitted band across the two entries is RM225,000 to RM873,600. By type: Phase 1 single-storey (230 units, about 915 sq ft) RM225,000 – RM561,730; Phase 1 double-storey (70 units, about 1,195 sq ft) RM248,000 – RM873,600; Phase 2 single-storey (244 units, about 915–1,012 sq ft) RM250,000 – RM531,900; Phase 2 double-storey (76 units, about 1,195 sq ft) RM428,000 – RM607,000. The register does not explain the wide spread; the top of each range is most likely the corner and end lots with extra land, and the RM873,600 ceiling on the Phase 1 double-storey row stands well above every other range — ask which lots it applies to before you treat it as a benchmark. Because the scheme is completed and the permits have lapsed, these figures are history: they show what the developer was allowed to charge, not what a house changes hands for today. For a resale, ask for recent transacted prices in Taman Raia Utama by lot type.

Completed: CCC issued 11 December 2024 and 23 September 2025

Both entries are 100% built and carry the status Siap Dengan CCC — completed, Certificate of Completion and Compliance issued. Phase 1: first SPA 2 October 2021, vacant possession due under that SPA by 2 October 2023, vacant possession recorded on 12 December 2024 — about 14 months after that first due date. Later Phase 1 SPAs carry later due dates, so not every buyer was late by the same amount, and buyers delivered late are generally entitled under the SPA to liquidated damages; a resale buyer should ask whether any claim is outstanding. Phase 2: first SPA 18 August 2023, due 18 August 2025, vacant possession recorded 27 September 2025. The percentages are the developer’s own progress returns to the ministry (the statutory 7(f) report).

Permits: the last Phase 1 permit expired on 22 September 2024 and the last Phase 2 permit on 23 November 2025, and the register shows no renewal. A developer needs a current permit to advertise and sell housing, so if anyone offers you a unit ‘direct from the developer’, ask to see the current permit. Status vocabulary is fixed: Belum Mula, Lancar, Lewat, Sakit, Siap Dengan CCC / CFO, Permit Telah Dibatalkan. Both entries sit in Siap Dengan CCC.

Foreign buyers: what Perak allows

No. Sierra Beringin is freehold, and since September 2023 Perak does not allow non-citizens or foreign companies to buy freehold property, whatever the price. Gopeng falls under Zone 2 (Kampar district) for the leasehold thresholds — confirm the zone with a lawyer — but that does not help on freehold land.

Perak’s rules for foreign buyers, as summarised in the Malaysian Bar’s Circular 444/2024 (state table as at October 2024): since September 2023 non-citizens and foreign companies may not acquire freehold property in Perak. On leasehold land a home must be bought direct from the developer — residential sub-sales to foreigners are not permitted. Minimum prices: Zone 1 (Ipoh) RM700,000 landed / RM500,000 strata; Zone 2 (Manjung, Taiping, Teluk Intan, Tanjong Malim, Kampar, Batu Gajah, Kuala Kangsar) RM500,000 landed / RM350,000 strata; Zone 3 (Kerian, Perak Tengah, Tapah, Pengkalan Hulu, Gerik, Lenggong, Selama) RM300,000 landed / RM350,000 strata. Commercial property needs at least RM1,000,000 (Zone 1–2) or RM800,000 (Zone 3). State Authority consent is always required, and Bumiputera-quota lots are not open to foreign buyers. These rules change: confirm the current position in writing with a Perak conveyancing lawyer before you pay anything.

What is not published, and therefore not on this page

  • Total land area of the scheme
  • Which lots are the 94 sq m single-storey variant, the 2-bedroom single-storey units and the 3-bathroom double-storey units listed on the Phase 2 entry
  • Which lots the top of each price range applies to
  • Number of Bumiputera-quota lots
  • Exact postal address of individual lots (the estate is Taman Raia Utama, 31600 Gopeng)
  • Recent resale transaction prices (ask me; I will pull them by lot type)

Developer

About Keris Properties Sdn Bhd and Team Keris

Start with the fact you can check yourself. The licensed developer on the government register is Keris Properties Sdn. Bhd., developer code 6052, licence 6052/11-2028/1299(A), valid 24 November 2023 to 23 November 2028. The filed advertisements print its company number, 230241-W, its business address at TKB Tower, A-G-1, Jalan Sultan Nazrin Shah (Jalan Gopeng), Times Square Ipoh, 30250 Ipoh, and state that it is a subsidiary of Team Keris Berhad (702437-W).

Team Keris (TKB) is one of the longer-running Ipoh developers: by its own account it was formed in 1991, and its website lists developments across Ipoh and Perak, including Gopeng Avante, Bandar Baru Bidor and The Lakes. On teamkeris.com.my (read 8 October 2026), ‘City on the Hills’ appears as a listing for three-storey bungalows — a different product type from these terraces, which suggests the name covers TKB’s wider Gopeng hillside land rather than this terrace scheme alone. Sierra Beringin itself is not named on the site.

My view: the track record here is on the register for anyone to see — 620 houses completed with CCC, Phase 2 roughly on time, Phase 1 delivered late against its first SPA. For a resale buyer the developer matters less now than the title, the CCC and the condition of the specific house.

Developer website: teamkeris.com.my. Licence and permit history: KPKT TEDUH portal (teduh.kpkt.gov.my), developer code 6052.

FAQ

Frequently asked questions

What is the price of Sierra Beringin?

The SPA price band on the advertising permits is RM225,000 to RM873,600: Phase 1 single-storey RM225,000 – RM561,730 and double-storey RM248,000 – RM873,600; Phase 2 single-storey RM250,000 – RM531,900 and double-storey RM428,000 – RM607,000. That is the developer’s approved selling-price range on the government housing register as I read it on 8 October 2026 — not a current price list for any particular unit. The scheme is completed and both permits have lapsed, so for today’s asking and transacted prices, WhatsApp me.

Is Sierra Beringin completed?

Yes. The register shows both phases 100% built with CCC: Phase 1 (300 houses) on 11 December 2024 and Phase 2 (320 houses) on 23 September 2025, with vacant possession recorded on 12 December 2024 and 27 September 2025.

Can I still buy from the developer?

Probably not: both advertising permits have lapsed — Phase 1 on 22 September 2024 and Phase 2 on 23 November 2025 — and the register shows no renewal, and a developer needs a current permit to advertise and sell housing. Most purchases here now are resales from owners; I can find what is on the market.

Was Sierra Beringin delivered late?

Phase 1 was, against its first SPA: vacant possession was due by 2 October 2023 under the first Phase 1 SPA and is recorded on 12 December 2024, about 14 months later. Phase 2 was due by 18 August 2025 under its first SPA and is recorded on 27 September 2025. If you buy a resale unit, ask the owner whether any late-delivery claim is still open.

Is it freehold?

Yes. Both advertisements filed with the housing ministry print the tenure as ‘selama-lamanya’ (freehold), with a charge to Maybank Islamic Berhad on the developer’s land and no restriction in interest.

Why three names: City on the Hills, Sierra Beringin and Taman Raia Utama?

They describe the same 620 terraces: Taman Raia Utama is the registered name (and the address), Sierra Beringin is the developer’s marketing name, and City on the Hills is the name used in the agency file. On Team Keris’s website, City on the Hills is also used for a bungalow product, so check the name on the title.

How big are the houses?

The register gives about 915 sq ft (85 sq m) for the single-storey and about 1,195 sq ft (111 sq m) for the double-storey, on 20′ x 70′ lots; Phase 2 also lists a 94 sq m (about 1,012 sq ft) single-storey variant. The developer draws both types with 4 bedrooms and 2 bathrooms.

Is there a maintenance fee?

No. The developer lists no maintenance fee and no security tiers; it is an open taman. You pay assessment to Majlis Daerah Kampar and quit rent to the land office.

Can foreigners or Singaporeans buy?

No. The land is freehold, and since September 2023 Perak does not allow foreigners to buy freehold property, whatever the price. Perak’s rules (Malaysian Bar Circular 444/2024, table as at October 2024) also bar foreigners from residential sub-sales on leasehold land, so a resale here is closed to them twice over. Confirm before you pay anything.

How far is it from Ipoh?

Ipoh city centre is about 15 km in a straight line, and the developer puts the PLUS Simpang Pulai toll at 7 km and the Gopeng toll at 6 km. Gopeng town is about 2 km away. Test the drive at your usual hours.

How much can I borrow?

For your first and second residential property, Malaysian banks generally lend up to 90% of the purchase price or valuation, whichever is lower, subject to your income and credit record. On a resale, the bank’s valuation decides the loan.

How do I view a house?

WhatsApp me on +60 10-906 6685 with the type you want and your budget. I will check what is on the market, the title and the CCC first, then arrange viewings.

5 things worth asking for before you buy

This is a completed scheme with lapsed permits, so you are almost certainly buying from an owner. I will ask for all of these on your behalf:

  • A copy of the individual title (freehold, lot number, land area, any charge)
  • The CCC reference for the phase and the vacant-possession letter
  • The original SPA, to check the lot type, built-up and any open late-delivery claim
  • Current quit rent and Majlis Daerah Kampar assessment bills, paid up
  • Recent transacted prices in Taman Raia Utama for the same house type

No obligation, and no mailing list.

Louis Koh

11 years in Malaysian property · Johor Bahru, Kuala Lumpur & Ipoh new launches · English & 中文

I work with cross-border buyers from Singapore and with local investors and owner-occupiers. I’ll tell you when a project isn’t right for you — that’s usually worth more than the brochure.

💬 Message Louis

Published 2026-10-08 · Last verified 2026-10-08 against the government housing register (teduh.kpkt.gov.my), the developer’s two advertisements filed with the housing ministry for project codes 6052-7 and 6052-8, and the developer’s Sierra Beringin overview brochure, e-flyer (statutory particulars), floor plans, site plan and photographs, plus teamkeris.com.my. Unit availability, pricing and completion dates are set by the developer and subject to change. This page is marketing information, not an offer or a contract.

Sierra Beringin @ GopengFreehold terrace · 915–1,195 sq ft · 620 units, CCC
WhatsApp

Ask a specific question

If you would rather not use WhatsApp, use this. I answer them myself. Only your name and one contact method are required.

Email or phone — one is enough

What you send is emailed to me and stored on this site. It goes to no third party, joins no mailing list, and fires no tracking. See the privacy policy.

Build progress

The unit mix, the permitted price and how far up it is

None of this table is the developer’s account of itself. It is what the Ministry of Housing and Local Government records from the 7(f) returns: unit type, bedrooms and bathrooms, built-up area, unit count, the price range on the permit, and the certified percentage complete. A brochure price can be revised; the price on the permit was filed. A brochure need not mention progress; the percentage is certified. The status vocabulary is theirs too: Lancar (on schedule), Lewat (behind), Sakit (sick), Terbengkalai (abandoned).

6052-7 · TAMAN RAIA UTAMA

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Teres – 230 units100.00%Rumah Teres – 70 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Teres
1 storeys
Siap Dengan CCC
4 / 285 m²
≈ 915 sq ft
230RM225,000.00
– RM561,730.01
100.00%
Rumah Teres
2 storeys
Siap Dengan CCC
—111 m²
≈ 1,195 sq ft
70RM248,000.00
– RM873,600.00
100.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 6052-7. Re-read weekly.

6052-8 · TAMAN RAIA UTAMA

Overall status: Siap Dengan CCC — completed

Certified completion by componentRumah Teres – 244 units100.00%Rumah Teres – 76 units100.00%
ComponentBed / bathBuilt-upUnitsPrice on the permitComplete
Rumah Teres
1 storeys
Siap Dengan CCC
2, 4 / 2, 485 – 94 m²244RM250,000.00
– RM531,900.00
100.00%
Rumah Teres
2 storeys
Siap Dengan CCC
4 / 2, 3111 m²
≈ 1,195 sq ft
76RM428,000.00
– RM607,000.00
100.00%

Swipe the table sideways for the rest of the columns.

The filed advertisement · on the ministry’s own server

This is the document the developer had to file, and the housing department had to approve, before it was allowed to advertise at all — served from the ministry’s own host. It normally carries the location plan, the developer licence and building-plan approval references, the expected completion date, the encumbrance position, and the unit count and price floor and ceiling for each type. The brochure a salesperson hands you can be reissued. This one cannot.

Open the filed advertisement (PDF)

Read from teduh.kpkt.gov.my on 2026-10-08, project code 6052-8. Re-read weekly.

What to do with the number. Read it against the delivery date in your own agreement, not against what a salesperson says. A project with a year left on its statutory clock and a third of the building up is telling you something the brochure will not.

How does that compare? Every development on this site, grouped by register status — cancelled, abandoned and behind schedule first.